> RPV Upper Head Issues -- News and Correspondence for 2003
RPV Upper Head Issues -- News and Correspondence for 2003
This page lists, in chronological order, general news and correspondence
on RPV Upper Head Issues for 2003.
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
Date |
Description |
08/12/03 |
Summary of August 4, 2003,
Meeting with Nuclear Energy Institute (NEI) on Management of Material
Issues |
04/23/03 |
Westinghouse Letter - Request
for Review and Approval of WCAP, "Ambient Temper Bead Repair
of Head Adapter Penetrations in PWR Reactor Vessel Upper Heads" |
04/22/03 |
Letter from Brian W. Sheron,
NRC to Alex Marion, NEI, regarding Pressurized Water Reactor (PWR)
Materials Reliability Project Interim Alloy 600 Safety Assessment
for U.S. PWR Plants (MRP-44), Part: Alloy 82/182 Pipe Butt Welds |
04/11/03 |
Letter from R. Barrett,
NRC, Office of Nuclear Reactor Regulation (NRR), Division of Engineering
to Alex Marion, Nuclear Energy Institute, regarding Flaw Evaluation
Guidelines
|
03/14/03 |
Issuance of Errata to Order
Establishing Interim Inspection Requirements for Reactor Pressure
Vessel Heads at Pressurized Water Reactors |
03/10/03 |
William Travers Letter to
Commission - Plans for Implementing the Davis-Besse Lessons Learned
Task Force Recommendations |
03/07/03 |
Samuel Collins and Ashok Thadani Letter
- Actions Resulting from the Davis-Besse Lessons Learned Task
Force Report Recommendations - Correction
|
02/19/03 |
Letter from Alexander
Marion, NEI, to Brian Sheron, NRC, on Questions Concerning NRC
Order EA-03-009
|
02/11/03 |
Letter from Samuel J.
Collins, Director, Office of Nuclear Reactor Regulation - Issuance
of Order Establishing Interim Inspection Requirements for Reactor
Pressure Vessel Heads at Pressurized Water Reactors
|
|