RPV Upper Head Issues -- News and Correspondence for 2003

This page lists, in chronological order, general news and correspondence on RPV Upper Head Issues for 2003.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Description
08/12/03 Summary of August 4, 2003, Meeting with Nuclear Energy Institute (NEI) on Management of Material Issues
04/23/03 Westinghouse Letter - Request for Review and Approval of WCAP, "Ambient Temper Bead Repair of Head Adapter Penetrations in PWR Reactor Vessel Upper Heads"
04/22/03 Letter from Brian W. Sheron, NRC to Alex Marion, NEI, regarding Pressurized Water Reactor (PWR) Materials Reliability Project Interim Alloy 600 Safety Assessment for U.S. PWR Plants (MRP-44), Part: Alloy 82/182 Pipe Butt Welds
04/11/03

Letter from R. Barrett, NRC, Office of Nuclear Reactor Regulation (NRR), Division of Engineering to Alex Marion, Nuclear Energy Institute, regarding Flaw Evaluation Guidelines

03/14/03 Issuance of Errata to Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
03/10/03 William Travers Letter to Commission - Plans for Implementing the Davis-Besse Lessons Learned Task Force Recommendations
03/07/03

Samuel Collins and Ashok Thadani Letter - Actions Resulting from the Davis-Besse Lessons Learned Task Force Report Recommendations - Correction

02/19/03

Letter from Alexander Marion, NEI, to Brian Sheron, NRC, on Questions Concerning NRC Order EA-03-009

02/11/03

Letter from Samuel J. Collins, Director, Office of Nuclear Reactor Regulation - Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors