Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Ogden River Project 
 Engineering Data

Ogden River Project  -  Main Page

Facilities in Operation

Storage Dams

1      

Diversion Dams

1      

Canals

30 mi  

Laterals

66 mi  

Drains

2 mi  


Storage Facilities

Diversion Facilities

    South Ogden Highline Canal Diversion Dam

Carriage Facilities

Ogden River Crossing  -  South Ogden Highline Canal

Type:

Circular steel siphon

Location:

At Ogden River near Ogden, Utah.

Construction period:

1936-1937  

Length

360 ft  

Diversion capacity

35 cfs  

Diameter

36 in  


South Ogden Highline Canal

Type:

Reinforced concrete pipe and concrete lined canal

Location:

From the end of the Ogden Canyon Conduit generally southwest.  Entire canal is concrete lined

Construction Period:

    1938-1941 -  Concrete lined canal                                   1971-1979 -  Replaced by reinforced concrete pipe

Length

5.2 mi  

Canal Diversion capacity

35 cfs  

Pipe Diversion capacity

49 cfs  

Pipe diameter

48  - 18 in  


Ogden-Brigham Canal

Type:

Concrete lined canal

Location:

From the end of Ogden-Brigham Conduit near Ogden, Utah, generally north to Brigham, Utah

Construction Period:

1935-1937  

Length

24.2 mi  

Diversion capacity

120 cfs  

Typical section in concrete

 

  Bottom width

4 ft  

  Side slopes

1.25:1  

  Water depth

3.1 ft   

  Lining thickness

3 in  

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links