Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
0 |
04/14/2003 |
Refueling REFUELING OUTAGE |
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
91 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
Cold Shutdown REFUELING OUTAGE |
|
|
DRESDEN 2 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
98 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
* |
|
DUANE ARNOLD 1 |
0 |
04/18/2003 |
Cold Shutdown SHUTDOWN FOR REACTOR RECIRC MG SET REPAIR/SRV REPAIR |
* |
|
FERMI 2 |
0 |
03/28/2003 |
Refueling REFUELING OUTAGE |
|
|
KEWAUNEE 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
LASALLE 1 |
50 |
|
Power Operation REDUCED POWER FOR LOW PRESSURE HEATER REPAIR |
* |
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
0 |
03/16/2003 |
Hot Standby MAKING PREPARATIONS TO ENTER MODE 2 |
* |
|
PERRY 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE |
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
1 |
|
Startup HOLDING DUE TO 1GT TRANSFORMER OUT OF SERVICE |
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
98 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
QUAD CITIES 2 |
0 |
04/16/2003 |
Cold Shutdown COMPLETING MAINTENANCE ACTIVITIES RELATED TO OUTAGE |
* |
|