Power Reactor Status Report for November 2, 2005
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
99 |
|
6A MAIN FEEDWATER HEATER OUT OF SERVICE |
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
* |
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
* |
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
0 |
10/11/2005 |
REFUELING OUTAGE |
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
|
|
|
Susquehanna 1 |
0 |
10/28/2005 |
MAINTENANCE SHUTDOWN TO RECHANNEL FUEL ASSEMBLIES - SEE EN#42093 |
|
|
Susquehanna 2 |
100 |
|
|
|
|
Three Mile Island 1 |
0 |
10/23/2005 |
REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS |
* |
|
Vermont Yankee |
0 |
10/22/2005 |
REFUELING COMPLETE |
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
0 |
10/31/2005 |
FORCED OUTAGE |
* |
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
0 |
10/28/2005 |
REFUELING OUTAGE - WILL ENTER MODE 6 TODAY |
* |
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
0 |
10/15/2005 |
DEFUELED |
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
0 |
10/29/2005 |
MAINTENANCE OUTAGE
REPAIRING MAIN TRANSFORMER |
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
91 |
|
INCREASING POWER |
* |
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
0 |
10/21/2005 |
DEFUELED |
|
|
Oconee 3 |
50 |
|
REDUCED POWER BY PROCEDURE DUE TO LOSS OF HEATER DRAIN PUMPS - CURRENTLY INCREASING POWER TO 85% AND HOLDING FOR RECOVERY OF REMAINING HEATER DRAIN PUMP. |
* |
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
0 |
10/16/2005 |
REFUELING OUTAGE |
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
80 |
|
INCREASING POWER |
* |
|
Turkey Point 4 |
0 |
10/24/2005 |
FORCED OUTAGE - UE TERMINATED AFTER RECOVEREY OF OFFSITE POWER TO UNIT 4 STARTUP TRANSFORMER - SEE EVENT #42104. |
* |
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
* |
|
Dresden 2 |
0 |
10/30/2005 |
REFUELING OUTAGE |
* |
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
0 |
09/23/2005 |
REFUELING OUTAGE |
|
|
Point Beach 2 |
98 |
|
ENTERED INTO TECH SPEC 3.0.3. SHUTDOWN AND EXITED SAME. SEE EVENT 42109. INCREASING POWER |
* |
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
0 |
10/04/2005 |
DEFUELED |
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
0 |
09/16/2005 |
CORE RELOAD IN PROGRESS |
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
0 |
10/08/2005 |
REFUELING OUTAGE |
* |
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
0 |
10/23/2005 |
DEFUELED |
* |
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
0 |
10/07/2005 |
DEFUELED |
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
100 |
|
|
|
|
San Onofre 3 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
66 |
|
INCREASING POWER |
* |
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|