Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
82 |
|
Power Operation LOAD FOLLOWING |
* |
|
BYRON 1 |
90 |
|
Power Operation LOAD FOLLOWING |
* |
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
91 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
DRESDEN 2 |
96 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
96 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
* |
|
DUANE ARNOLD 1 |
93 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
86 |
|
Power Operation REDUCED POWER DUE TO CONTROL VALVE CLOSURE AND SHUTDOWN OF A CIRC WATER PUMP DUE TO VIBRATIONS |
* |
|
KEWAUNEE 1 |
100 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
99 |
|
Power Operation COASTDOWN TO REFUELING OUTAGE |
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
0 |
12/01/2002 |
Hot Standby WORKING TOWARD RESTART |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
0 |
11/15/2002 |
Hot Shutdown REFUELING OUTAGE |
* |
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
91 |
|
Power Operation TESTING |
* |
|
QUAD CITIES 2 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|