Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
Refueling DEFUELED |
|
|
BROWNS FERRY 2 |
90 |
|
Power Operation HOLDING AT REDUCED POWER DUE TO FUEL LEAKAGE |
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
94 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
BRUNSWICK 2 |
100 |
|
|
|
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
100 |
|
|
|
|
FARLEY 2 |
0 |
09/13/2002 |
Refueling REFUELING OUTAGE |
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
0 |
10/10/2002 |
Hot Shutdown PLANNED MAINTENANCE OUTAGE. |
* |
HATCH 2 |
100 |
|
|
|
|
MCGUIRE 1 |
15 |
|
Power Operation INCREASING POWER |
* |
|
MCGUIRE 2 |
100 |
|
|
|
|
NORTH ANNA 1 |
100 |
|
Power Operation UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.1FT. |
|
|
NORTH ANNA 2 |
0 |
09/07/2002 |
Refueling UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.1FT REFUELING OUTAGE - DEFUELED |
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
96 |
|
Power Operation COASTDOWN TO REFUELING OUTAGE |
* |
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
91 |
|
Power Operation COASTDOWN TO REFUELING OUTAGE |
* |
|
SAINT LUCIE 1 |
0 |
09/29/2002 |
Refueling REFUELING OUTAGE-FUEL SHUFFLE IN PROGRESS |
* |
|
SAINT LUCIE 2 |
100 |
|
|
|
|
SEQUOYAH 1 |
100 |
|
|
|
|
SEQUOYAH 2 |
100 |
|
|
|
|
SUMMER 1 |
100 |
|
|
|
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
100 |
|
|
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
100 |
|
|
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
0 |
10/05/2002 |
Refueling REFUELING OUTAGE |
|
|
WATTS BAR 1 |
100 |
|
|
|
|