Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
0 |
10/14/2000 |
REFUELING OUTAGE - VESSEL HEAD REMOVED - MANUAL SCRAM PRIOR TO REACHING SETPOINT FOLLOWING REPLACEMENT OF ATWS POWER SUPPLIES (REFER TO EVENT #37432) |
* |
1 |
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
100 |
|
|
|
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
100 |
|
|
|
|
FERMI 2 |
100 |
|
|
|
|
KEWAUNEE 1 |
96 |
|
MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES |
|
|
LASALLE 1 |
50 |
|
HOLDING POWER AT THIS LEVEL TO INVESTIGATE THE POSSIBILITY OF A LEAK IN A LOW PRESSURE HEATER |
* |
|
LASALLE 2 |
97 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
98 |
|
ADMINISTRATIVE POWER LIMIT DUE TO POWER UPRATE |
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
0 |
10/13/2000 |
ENTERING REFUELING OUTAGE |
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
0 |
10/14/2000 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
* |
|
QUAD CITIES 2 |
95 |
|
HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL VALVE PROBLEM |
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
ARKANSAS NUCLEAR 1 |
100 |
|
|
|
|
ARKANSAS NUCLEAR 2 |
0 |
09/15/2000 |
REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED |
|
|
CALLAWAY 1 |
100 |
|
|
|
|
COMANCHE PEAK 1 |
100 |
|
|
|
|
COMANCHE PEAK 2 |
0 |
09/30/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
COOPER 1 |
0 |
10/14/2000 |
MAINTENANCE OUTAGE FOLLOWING AN AUTOMATIC REACTOR SCRAM FROM 100% POWER ON 10/14/00 (REFER TO EVENT #37429) |
* |
|
DIABLO CANYON 1 |
0 |
10/08/2000 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
* |
|
DIABLO CANYON 2 |
100 |
|
|
|
|
FT CALHOUN 1 |
0 |
10/14/2000 |
FORCED MAINTENANCE OUTAGE |
* |
|
GRAND GULF 1 |
100 |
|
|
|
|
PALO VERDE 1 |
100 |
|
|
|
|
PALO VERDE 2 |
0 |
10/03/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
PALO VERDE 3 |
100 |
|
|
* |
|
RIVER BEND 1 |
98 |
|
INCREASING POWER AT A RATE OF 1% PER DAY - POWER UPRATE IN PROGRESS |
* |
|
SAN ONOFRE 2 |
0 |
10/07/2000 |
REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS |
* |
|
SAN ONOFRE 3 |
100 |
|
|
|
|
SOUTH TEXAS 1 |
100 |
|
|
|
|
SOUTH TEXAS 2 |
100 |
|
|
|
|
WATERFORD 3 |
0 |
10/14/2000 |
ENTERING REFUELING OUTAGE |
|
|
WNP-2 |
100 |
|
|
|
|
WOLF CREEK 1 |
0 |
09/29/2000 |
REFUELING OUTAGE - DEFUELED |
|
|