Home
> Electronic Reading Room
> Document Collections
> Reports Associated with Events
> Power Reactor Status Reports
> 2000
> March 5
Power Reactor Status Report for March 5, 2000
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
0 |
02/15/2000 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
* |
|
BEAVER VALLEY 2 |
40 |
|
REDUCED POWER TO EXTEND OPERATING CYCLE |
* |
|
CALVERT CLIFFS 1 |
100 |
|
|
|
|
CALVERT CLIFFS 2 |
100 |
|
|
|
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
100 |
|
|
|
|
HOPE CREEK 1 |
95 |
|
|
|
|
INDIAN POINT 2 |
0 |
02/15/2000 |
MAINTENANCE OUTAGE |
|
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
LIMERICK 2 |
100 |
|
|
|
|
MILLSTONE 2 |
100 |
|
|
|
|
MILLSTONE 3 |
100 |
|
|
|
|
NINE MILE POINT 1 |
100 |
|
|
|
|
NINE MILE POINT 2 |
0 |
03/03/2000 |
ENTERING REFUELING OUTAGE - MANUAL REACTOR SCRAM FROM 28% POWER FOLLOWING A LOSS OF SEAL INJECTION FLOW DURING PERFORMANCE OF A NORMAL PLANT SHUTDOWN ON 03/03/00 (REFER TO EVENT #36753) |
* |
|
OYSTER CREEK 1 |
5 |
|
EXITING MAINTENANCE OUTAGE |
* |
|
PEACH BOTTOM 2 |
65 |
|
HOLDING POWER AT THIS LEVEL TO CLEAN WATERBOXES |
* |
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
100 |
|
|
|
|
SALEM 1 |
90 |
|
HOLDING POWER AT THIS LEVEL DUE AN OUT-OF-SERVICE 500-kV LINE |
|
|
SALEM 2 |
100 |
|
|
|
|
SEABROOK 1 |
100 |
|
|
|
|
SUSQUEHANNA 1 |
100 |
|
|
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
100 |
|
|
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
0 |
02/25/2000 |
REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE - PERFORMING CONTROL ROD DRIVE BLADE EXCHANGES - UNUSUAL EVENT DECLARED AND TERMINATED ON 03/03/00 DUE TO A LOSS OF OFFSITE POWER ON 4-kV EMERGENCY BUSES (REFER TO EVENT #36750, #36751, AND 36752) |
* |
|
BRUNSWICK 2 |
100 |
|
|
* |
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
* |
|
FARLEY 1 |
0 |
03/04/2000 |
ENTERING REFUELING OUTAGE |
* |
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
100 |
|
|
|
|
HATCH 2 |
0 |
03/04/2000 |
ENTERING REFUELING OUTAGE |
|
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
100 |
|
|
|
|
NORTH ANNA 1 |
70 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
* |
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
100 |
|
|
|
|
SEQUOYAH 1 |
0 |
02/23/2000 |
REFUELING OUTAGE - FUEL RELOAD IN PROGRESS |
* |
|
SEQUOYAH 2 |
100 |
|
|
|
|
SUMMER 1 |
90 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED FEEDWATER PUMP MAINTENANCE |
|
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
100 |
|
|
|
|
TURKEY POINT 3 |
0 |
02/27/2000 |
REFUELING OUTAGE |
|
|
TURKEY POINT 4 |
100 |
|
|
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
75 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
100 |
|
|
|
|
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
100 |
|
|
|
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
80 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM MOISTURE SEPARATOR REHEATER MAINTENANCE |
* |
|
FERMI 2 |
97 |
|
|
|
|
KEWAUNEE 1 |
97 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
25 |
|
INCREASING TO 28% POWER TO PERFORM A CHEMISTRY HOLD AFTER EXITING A MAINTENANCE OUTAGE |
* |
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
80 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING |
* |
|
QUAD CITIES 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
ARKANSAS NUCLEAR 1 |
0 |
02/05/2000 |
MAINTENANCE OUTAGE |
|
|
ARKANSAS NUCLEAR 2 |
100 |
|
|
|
|
CALLAWAY 1 |
100 |
|
|
|
|
COMANCHE PEAK 1 |
100 |
|
|
|
|
COMANCHE PEAK 2 |
100 |
|
|
|
|
COOPER 1 |
0 |
03/04/2000 |
ENTERING REFUELING OUTAGE |
|
|
DIABLO CANYON 1 |
100 |
|
|
|
|
DIABLO CANYON 2 |
100 |
|
|
|
|
FT CALHOUN 1 |
100 |
|
|
|
|
GRAND GULF 1 |
93 |
|
INCREASING POWER AFTER DECREASING TO APPROXIMATELY 60% TO PERFORM A ROD SEQUENCE EXCHANGE |
* |
|
PALO VERDE 1 |
100 |
|
|
|
|
PALO VERDE 2 |
100 |
|
|
|
|
PALO VERDE 3 |
100 |
|
|
|
|
RIVER BEND 1 |
0 |
03/04/2000 |
ENTERING REFUELING OUTAGE |
* |
|
SAN ONOFRE 2 |
100 |
|
|
|
|
SAN ONOFRE 3 |
100 |
|
|
|
|
SOUTH TEXAS 1 |
0 |
03/01/2000 |
REFUELING OUTAGE - REACTOR VESSEL HEAD REMOVED |
* |
|
SOUTH TEXAS 2 |
100 |
|
|
|
|
WATERFORD 3 |
100 |
|
|
|
|
WNP-2 |
100 |
|
|
|
|
WOLF CREEK 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|