Morning Report for October 19, 1999

                       Headquarters Daily Report

                         OCTOBER 19, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS OCTOBER 19, 1999

MR Number: H-99-0090

                           NRR DAILY REPORT ITEM
                           GENERIC COMMUNICATIONS



Subject: Issuance of Regulatory Issue Summary (RIS) 99-03

NRC Regulatory Issue Summary 99-03 "Resolution of Generic Issue 145,     
Actions to Reduce Common-Cause Failures" Dated October 13, 1999          
                                                                         
INTENT                                                                   
                                                                         
The U.S. Nuclear Regulatory Commission issued this regulatory issue      
summary to notify nuclear power reactor licensees about the staff's      
resolution of Generic Issue 145, "Actions to Reduce Common-Cause         
Failures," and to communicate the broad insights that have been developed
from the staff's review of the common-cause failure events identified in 
licensee event reports during the 15-year period between 1980 and 1995.  
                                                                         
Technical Contacts: Dale Rasmuson, RES                                   
                    301-415-7571                                         
                    E-mail: dmr@nrc.gov                                  
                                                                         
                    Ronald Emrit, RES                                    
                    301-415-6447                                         
                    E-mail: rce@nrc.gov                                  
                                                                         
_
REGION III  MORNING REPORT     PAGE  2          OCTOBER 19, 1999

Licensee/Facility:                     Notification:

Consumers Power Co.                    MR Number: 3-99-0085
Palisades 1                            Date: 10/18/99
Covert,Michigan                        SRI Via Telecon                    
Dockets: 50-255
PWR/CE                                

Subject: PALISADES SHUTDOWN FOR PLANNED REFUELING OUTAGE                 

Discussion:

The Palisades Nuclear Plant was taken off-line on October 15, 1999, at   
11:24 p.m., for the scheduled 1999 refueling outage. In addition to the  
refueling activities, other major maintenance activities that were       
scheduled include: 1) Primary Coolant Pump P- 50D motor replacement; 2)  
Primary Coolant Pump P-50A pump casing leak repairs and pump rebuild; 3) 
replace shaft seals on three primary coolant pumps; and 4) replace both  
low pressure turbine rotors on the main turbine generator.               

Regional Action:

Resident inspectors observed portions of the reactor and plant shutdown  
activities and will inspect various outage activities.                   

Contact:  Anton Vegel                (630)829-9620
_