Morning Report for April 11, 2000

                       Headquarters Daily Report

                         APRIL 11, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I            X                                      
REGION II                              X                   
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION I  APRIL 11, 2000

Licensee/Facility:                     Notification:

Maine Yankee Atomic Power Co.          MR Number: 1-00-0006
Maine Yankee 1                         Date: 04/11/00
Wiscasset,Maine                                                           
Dockets: 50-309
PWR/CE                                

Subject: STEEL BEAM KNOCKED OFF GANTRY CRANE DURING STEAM GENERATOR      
         MOVE AT MAINE YANKEE                                            


Discussion:

On April 7, 2000, at approximately 6:30 p.m., a top beam on a gantry     
crane was knocked off during the movement of one of the steam generators 
that was being removed from the Maine Yankee containment building.  The  
steam generator had been successfully lifted with the polar crane and    
lowered to a horizontal position through the equipment hatch opening.    
Once horizontal, a gantry crane outside containment was connected to the 
lower end of the steam generator and raised to allow a special           
multi-wheel transporter to be positioned under the steam generator.  The 
steel top beam of the gantry crane is supported by two hydraulic gantry  
towers on either side of the transporter.  As the transporter was pulling
the steam generator out through the equipment hatch and proceeding under 
the gantry crane, the transition region of the steam generator (the      
larger diameter, upper portion) struck the connecting element on the     
underside of the steel beam of the gantry crane.  The large beam was     
knocked off the towers with one end landing on the ground and the other  
end landing on the steam generator.  No personnel were injured.  The     
contamination-control coating placed on the exterior surface of the steam
generator was abraded in several areas, but health physics personnel     
confirmed no radiological contamination was released and the abraded     
areas were re-coated.   The steam generator was moved to its temporary   
storage area.  Maine Yankee suspended further lifting activities until a 
root cause evaluation was completed and corrective actions were          
developed.                                                               

Regional Action:

NRC staff will review licensee corrective actions before the remaining   
two steam generators are moved.                                          

Contact:  Mark Roberts               (610)337-5094
          Ronald R. Bellamy          (610)337-5200