Morning Report for February 26, 2001

                       Headquarters Daily Report

                         FEBRUARY 26, 2001

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I            X                                      
REGION II           X                                      
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS FEB. 26, 2001

MR Number: H-01-0013

                           NRR DAILY REPORT ITEM
                           GENERIC COMMUNICATIONS



Subject: Issuance of Regulatory Issue Summary 2001-06

NRC Regulatory Issue Summary 2001-07: 10 CFR 50.75(f)(1) Reports on the  
Status of Decommissioning Funds (due MARCH 31, 2001), dated              
February 23,2001                                                         
                                                                         
The U. S. Nuclear Regulatory Commission is issuing this regulatory issue 
summary (RIS) to clarify the reporting requirements of 10 CFR 50.75(f)(1)
regarding the status of decommissioning funding.                         
                                                                         
Contact:  Michael A. Dusaniwskyj, NRR                                    
          301-415-1260                                                   
          E-mail: mad1@nrc.gov                                           
                                                                         
Accession No. ML010300068                                                
                                                                         
_
REGION I  MORNING REPORT     PAGE  2          FEBRUARY 26, 2001

Licensee/Facility:                     Notification:

Peco Energy Company.                   MR Number: 1-01-0003
Limerick 2                             Date: 02/26/01
Philadelphia,Pennsylvania              SRI                                
Dockets: 50-353
BWR/GE-4                              

Subject: TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO SAFETY RELIEF  
         VALVE ACTUATION                                                 

Reportable Event Number: 37778                         

Discussion:

At 9:19 p.m. on Friday February 23, 2001, shortly after operators began a
planned shutdown to repair a safety relief valve (SRV), the SRV          
unexpectedly opened and remained open until reactor pressure decreased to
130 psig.  Operators performed a rapid plant shutdown in accordance with 
station procedures, implemented applicable emergency operating           
procedures, and by early Saturday morning placed the unit in cold        
shutdown.  The licensee is continuing its investigation of the cause of  
the unexpected SRV opening.                                              
                                                                         
During replacement of the affected SRV, the licensee found that some of  
the studs and nuts used in the flange to connect the SRV tailpipe to the 
SRV had fallen off and some stud/nut combinations in the flange had      
as-found torque values that were less than the specified torque value of 
230 ft-lbs.  There was no evidence that the flange joint failed while the
valve was open and the licensee concluded that the as-found flange       
configuration was sufficient to maintain operability.  The licensee      
inspected the SRV tailpipe to SRV flange on all Unit-2 SRVs and found    
some additional examples of stud/nut torque valves less than the         
specified value.  The licensee preliminarily determined that the torque  
value was insufficient to prevent relaxation of the bolting pre-load,    
increased the specified torque value to 300 ft-lbs, and re-tightened all 
stud/nut combinations to the higher torque value.                        

Regional Action:

The resident staff continues to follow the licensee's actions in response
to this event.                                                           

Contact:  Cowgill, C                 (610)337-5233
          Burritt, A                 (610)327-1344
_
REGION II  MORNING REPORT     PAGE  3          FEBRUARY 26, 2001

Licensee/Facility:                     Notification:

Duke Power Co.                         MR Number: 2-01-0002
Oconee 1 2 3                           Date: 02/26/01
Seneca,South Carolina                                                     
Dockets: 50-269,50-270,50-287
PWR/B&W-L-LP,PWR/B&W-L-LP,PWR/B&W-L-LP

Subject: MANAGEMENT CHANGES                                              

Discussion:

Effective February 21, 2001, Mr. Mano Nazar assumed the responsibilities 
of Oconee's Station Manager following the resignation of the former      
Station Manager (Mr. Jeff Forbes) from Duke Energy Corporation.          
Mr. Nazar will also continue to serve in his previous position as        
Oconee's Engineering Manager until a selection is made for that position.

Contact:  ROBERT CARROLL             (404)562-4511