Morning Report for January 22, 2001

                       Headquarters Daily Report

                         JANUARY 22, 2001

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II                              X                   
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS JANUARY 22, 2001

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-01-0003
Indian Point 3/Westinghouse            Date: 01/22/01
                                                                          

Subject: Part 21 - Horizontal capacitor mounting may render              
         safety-related inverter inoperable                              


Discussion:

VENDOR: Indian Pt 3/Westinghouse        PT21 FILE NO: m1-02-0            
                                                                         
DATE OF DOCUMENT: 12/15/00              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 37602               REVIEWER: REXB, V. Hodge         
                                                                         
                                                                         
The Indian Point 3 licensee reported a potential defect in a             
safety-related static inverter supplied by Westinghouse. The licensee    
dedication program did not identify a mounting restriction for           
replacement capacitors in the inverter. The licensee procured the        
capacitors from Mallory, Inc. but learned from Westinghouse that a       
Mallory design change to the capacitor imposed the mounting restriction. 
Horizontal mounting of the capacitors could result in a short circuit and
render the inverter and associated instrumentation inoperable. On        
October 26, 2000, the licensee shut down the plant to replace the        
capacitors. Westinghouse has discontinued use of this model Mallory      
capacitor, Mallory part number CGS432T200X4C, Westinghouse part number   
454A8391110.                                                             
                                                                         
The NRC will post ensuing reports on this subject on its Web site at     
http://www.nrc.gov/NRC/PUBLIC/PART21/2001.                               
_
HEADQUARTERS      MORNING REPORT     PAGE  2          JANUARY 22, 2001

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-01-0004
General Electric                       Date: 01/22/01
                                                                          

Subject: Part 21 - Revision of seismic qualification for electrically    
         operated GE Type AK-15/25 circuit breakers                      


Discussion:

VENDOR: General Electric                PT21 FILE NO: m1-03-0            
                                                                         
DATE OF DOCUMENT: 12/18/00              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT:                        REVIEWER: REXB, R. Benedict      
                                                                         
                                                                         
General Electric (GE), the vendor for GE Type AK-15/25 low voltage       
circuit breakers, reported that electrically operated breakers of this   
type may not have the same seismic qualification as manually operated    
breakers of this type because of different relay schemes in the closing  
circuits. The IEEE 344-1975 zero period acceleration of manually operated
breakers given as 2.08g remains unchanged. The revised zero period       
acceleration of electrically operated breakers is 1.4g if an undervoltage
device is installed, 2.4g if not. The vendor informed the affected       
nuclear power plants. Electrically operated breakers are supplied to     
several nuclear power plants under the following part numbers:           
                                                                         
DD265A1305P005-P007, P013, P018, P022-P023, P026-P029, P032, P037, P038  
                                                                         
DD213A6963P001, P002, P005, P008, P009, P010                             
                                                                         
DD213A9686P002, P006-P008, P010, P012, P013                              
                                                                         
The NRC will post ensuing reports on this subject on its Web site at     
http://www.nrc.gov/NRC/PUBLIC/PART21/2001.                               
_
HEADQUARTERS      MORNING REPORT     PAGE  3          JANUARY 22, 2001

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-01-0005
Holtec                                 Date: 01/22/01
                                                                          

Subject: Part 21 - Weights found in removed spent fuel storage racks     
         exceed those used in design analyses                            


Discussion:

VENDOR: Holtec                          PT21 FILE NO: m1-04-0            
                                                                         
DATE OF DOCUMENT: 01/04/01              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 37646               REVIEWER: REXB, V. Hodge         
                                                                         
                                                                         
Holtec International, a vendor of ancillary components for spent nuclear 
fuel racks, reported that weights found in such racks removed from the   
Byron station exceeded those used in the design analyses for the racks   
and associated lifting equipment. The vendor states that the             
discrepancies, 3700-4800 kg (8200-10500 lb), are found in analyses for   
seismic loading, bearing pad design, spent fuel pool liner fatigue, and  
possibly others. The racks were manufactured by Joseph Oat Corporation.  
Similarly designed racks by the same manufacturer installed at the       
Braidwood station are scheduled for removal by the end of April 2001. The
vendor accounted for the potential overweight condition with the         
Braidwood racks by incorporating an appropriately higher weight into the 
design of the lifting equipment and notified the licensee for the Byron  
and Braidwood stations.                                                  
                                                                         
The NRC will post ensuing reports on this subject on its Web site at     
http://www.nrc.gov/NRC/PUBLIC/PART21/2001.                               
                                                                         
_