Skip to Search Skip to Left Navigation U.S. Department of Transportation (US DOT) Research and Innovative Technology Administration (RITA) Bureau of Transportation Statistics (BTS)Bureau of Transportation Statistics (BTS) - Research and Innovative Technology Administration (RITA) - United States Department of Transportation (USDOT, US DOT or DOT)
  ABOUT RITA | CONTACT US | PRESS ROOM | CAREERS | SITE MAP
Bureau of Transportation Statistics
Data and Statistics
Bookstore
Programs
About BTS
Upcoming Press Releases
External Links
Intelligent Transportation Systems
National Transportation Library
Research, Development and Technology
Transportation Safety Institute
University Transportation Centers
Volpe National Transportation Systems Center
Printable Version

Table 1-67: Amtrak On-Time Performance Trends and Hours of Delay by Cause

Excel | CSV

  1980 1985 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
On-time performance, total percent (weighted) 69% 81% 76% 77% 77% 72% 72% 76% 71% 74% 79% 79% 78% 75% 76% 74% 71% 70% 68%
Short distance (<400 miles), percent 71% 82% 82% 82% 82% 79% 78% 81% 76% 79% 81% 80% (R) 82% 79% 80% 77% 75% 74% 73%
Long distance (>=400 miles), percent 64% 78% 53% 59% 61% 47% 49% 57% 49% 53% 59% 55% (R) 55% 52% 52% 53% 41% 40% 30%
Hours of delay by cause, totala N N 12,126 21,084 22,847 32,991 34,729 25,248 25,056 25,825 27,289 29,252 (R) 70,396 83,837 85,932 88,413 95,162 95,259 101,522
Amtrak,b N N 3,565 5,915 6,433 8,488 8,538 5,527 5,193 5,310 4,796 4,891 (R) 23,337 27,822 26,575 25,711 28,328 25,549 23,968
Host railroadc N N 4,244 7,743 8,229 12,827 14,319 11,224 11,438 12,904 14,202 16,158 (R) 43,881 52,273 55,090 57,346 61,256 64,097 71,387
Otherd N N 4,316 7,426 8,185 11,675 11,871 8,497 8,425 7,611 8,291 8,203 (R) 3,176 3,741 4,266 5,355 5,577 5,613 6,166

KEY: N = data do not exist; R = revised.

a Amtrak changed its method for reporting delays in 2000. Therefore, the data for 2000 and following years are not comparable with prior years.

b Includes all delays that occur when operating on Amtrak owned tracks and all delays for equipment or engine failure, passenger handling, holding for connections, train servicing, and mail/baggage handling when on tracks of a host railroad.

c Includes all operating delays not attributable to Amtrak when operating on tracks of a host railroad, such as track and signal related delays, power failures, freight and commuter train interference, routing delays, etc.

d Includes delays not attributable to Amtrak or other host railroads, such as customs and immigrations, law enforcement action, weather, or waiting for scheduled departure time.

NOTES

Host railroad is a freight or commuter railroad over which Amtrak trains operate for all or part of their trip.

Numbers may not add to totals due to rounding.

All percentages are based on Amtrak's fiscal year (October 1–September 30).

Amtrak trips are considered delayed based on the following chart:

Trip length (miles) Delayed departure time (minutes)
0-250 10
251-350 15
351-450 20
451-550 25
>551 30

SOURCES:

1980: Amtrak, National Railroad Passenger Corporation Annual Report (Washington, DC: 1981).

1985–99: Ibid., Amtrak Annual Report, Statistical Appendix (Washington, DC: Annual issues).

2000–03: Amtrak, personal communication, October 2003.

2004-06: Amtrak Annnual Report.