Table 5 Results of Intervention Analyses for the Five Series,,,,, Time series,# obs. after 8/1/2001,AO (Sept.),TC (Oct.),LS (Nov.),Rs-squared Late arrivals,6,14.28,–3.11,–5.52,0.404 ,,(0.0000),(0.3334),(0.0431), ,14,13.91,–4.64,–4.94,0.402 ,,(0.0000),(0.1264),(0.0648), Cancellations,6,18.12,–0.06,–1.56,0.947 ,,(0.0000),(0.8978),(0.0001), ,14,18.00,0.72,–1.80,0.947 ,,(0.0000),(0.2450),(0.0009), Enplanements,4,–17.42,–11.99,–2.25,0.813 ,,(0.0000),(0.0000),(0.0082), ,10,–17.31,–11.18,–2.75,0.798 ,,(0.0000),(0.0000),(0.0017), Air revenue passenger-miles,4,–13.94,–10.02,–1.60,0.800 ,,(0.0000),(0.0000),(0.0245), ,10,–13.82,–9.33,–2.08,0.787 ,,(0.0000),(0.0000),(0.0036), Rail revenue passenger-miles,4,–9.97,–0.18,3.38,0.564 ,,(0.0002),(0.9460),(0.1335), ,11,–9.71,1.71,1.46,0.554 ,,(0.0002),(0.4480),(0.3801), Note: The first two rows for each series provide the estimated coefficients and their p-values based on the first analysis; the next two rows provide the same information for the second analysis.,,,,,