"Table 7 Estimated Probabilities ",,,,,, Motorway group elasticity,Baseline,10% increase in speed on alternative road,10% increase in heavy vehicles on alternative road,10% increase in section length,Tourism dummy = 0, Low ,0.522,0.410,0.574,0.500,0.121, Middle-low,0.415,0.484,0.377,0.430,0.498, Middle-high,0.060,0.100,0.047,0.067,0.323, High,0.003,0.006,0.002,0.003,0.058, Note: The baseline values taken by the explanatory variables are: speed = 88.9 km/hr; percentage of heavy vehicles = 24.9%; section length = 23.4 km; and tourism dummy = 1.,,,,,,