"Table 3 Estimated Models for New Construction ",,,,, Variable,Hypothesis,Logit,,Mixed logit, ,,Coefficient,z,Coefficient,z Length of the link (Lij),–S,–5.91E-01,–1.35,1.84E–01,0.27 Capacity of the parallel link (Cp),–S,–3.31E–01*,–1.86,–4.87E–01*,–1.67 Length of the parallel link (Lp),+S,4.93E–01*,1.58,1.42E+00*,1.97 Congestion on parallel link (Qp /Cp),+S,–1.96E–05,–1.25,–5.23E–05*,–1.87 Access (A),+S,4.24E–05*,4.70,1.92E–04*,2.71 Time period of construction (T),–S,7.31E–01*,2.24,3.00E+00*,3.27 Cost of construction (Eij),–S,–2.82E–01*,–2.48,–8.97E–01*,–3.36 Budget (B),+S,5.68E–06*,3.06,7.78E–06*,3.96 Distance from downtown (X),+S,–1.21E–01*,–5.69,–3.08E–01*,–6.62 Node density (D),–S,–6.32E–04,–0.18,–1.27E–02*,–1.73 Constant,,–6.09E+00*,–6.02,–1.24E+02*,–2.92 Triangular deviation,,,,, Constant,,—,—,4.72E+01*,2.36 Number of observations,,"89,031",,"89,031", Log likelihood,,–473.19,,–459.68, * Significant at 90% confidence interval.,,,,,