Jump to main content.


Post Construction Completion

You will need Adobe Acrobat Reader, available as a free download, to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

The goal of Post Construction Completion activities is to ensure that Superfund response actions provide for the long-term protection of human health and the environment. EPA's Post Construction Completion activities also involve optimizing remedies to increase effectiveness and/or reduce cost without sacrificing long-term protection of human health and the environment.

"National Strategy to Manage Post Construction Completion Activities at Superfund Sites" (October 2005) (PDF)
OSWER 9355.0-105 (15 pp, 270K)

"Post Construction Completion Considerations in Superfund State Contracts" (August 2008) (PDF)
OSWER 9242.2-19 (9 pp, 2.3MB)

Fact Sheets

"Superfund Post Construction Completion: An Overview" (June 2001) (PDF)
OSWER 9355.0-79FS, EPA 540-F-01-009. (15 pp, 117K)

"Superfund Post Construction Completion Activities" (June 2001) (PDF)
OSWER 9355.0-80FS, EPA 540-F-01-010. (1 pg, 22K)

Post Construction Completion Topics

Other Related Links

"Closeout Procedures for National Priorities List Sites" (January 2000)
OSWER 9320.2-09A-P, EPA 540-R-98-016

Remedial Design/Remedial Action Handbook

Institutional Controls Bibliography: Institutional Control, Remedy Selection, and Post-Construction Completion Guidance and Policy, OSWER 9355.0-110, December 2005 (PDF) (9 pp, 109K)

Transmittal of Institutional Controls Bibliography (PDF) (2 pp, 137K)

 

Superfund Help: Acronyms | Topics | Frequent Questions | Publications | Sitemap

OSWER Home | Superfund Home | Innovative Technologies Home


Local Navigation


Jump to main content.