[Code of Federal Regulations]

[Title 30, Volume 1]

[Revised as of July 1, 2006]

From the U.S. Government Printing Office via GPO Access

[CITE: 30CFR35.7]



[Page 171]

 

                       TITLE 30--MINERAL RESOURCES

 

  CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR

 

PART 35_FIRE-RESISTANT HYDRAULIC FLUIDS--Table of Contents

 

                      Subpart A_General Provisions

 

Sec.  35.7  Date for conducting tests.



    The date of acceptance of an application will determine the order of 

precedence for testing when more than one application is pending, and 

the applicant will be notified of the date on which tests will begin. 

However, not more than two fluids will be tested consecutively for one 

applicant provided other applications are pending. If a fluid fails to 

meet any of the requirements, it shall lose its order of precedence. If 

an application is submitted to resume testing after correction of the 

course of failure, it will be treated as a new application and the order 

of precedence for testing will be so determined.