APPENDIX B

ACRONYMS

-A-

ABL Allocated Baseline

ACSN Advanced Change Study Notice

ADP Automated Data Processing

AIS Automated Information System

APB Acquisition Project Baseline

-B-

BPR Business Process Reengineering

-C-

CASE Computer-Aided Software Engineering

CBA Cost-Benefit Analysis

CD-ROM Compact Disk-Read Only Memory

CI Configuration Item

CM Configuration Management

CMM Capability Maturity Model

COCOMO Constructive Cost Model

CONOPS Concept of Operations

COTR Contracting Officers' Technical Representative

COTS Commercial Off-The-Shelf

CRUD Create, Read, Update, Delete

CSA Configuration Status Accounting

CSCI Computer Software Configuration Items

CWBS Contract Work Breakdown Structure

-D-

DBA Database Administrator

DBMS Database Management System

DOJ Department of Justice

-E-

ECP Engineering Change Proposal

-F-

FAR Federal Acquisition Regulations

FASA Federal Acquisition Streamlining Act

FBL Functional Baseline

FCA Functional Configuration Audit

FIPS Federal Information Processing Standards

FOIA/PA Freedom of Information Act/Privacy Act

FRD Functional Requirements Document

-G-

GAO General Accounting Office

GPRA Government Performance and Results Act

GUI Graphical User Interface

-H-

HCI Hardware Configuration Items

-I-

ICD Interface Control Document

IEEE/EIA Institute of Electrical and Electronics Engineers/Electronic Industries Assoc.

IMSS Information Management and Security Staff

IPT Integrated Product Team

IRM Information Resources Management

ISO International Standard Organization

IT Information Technology

ITA Information Technology Architecture

ITIB Information Technology Investment Board

-J-

JCL Job Control Language

JMD Justice Management Division

-L-

LAN Local Area Network

-O-

OBDB Offices, Boards, Divisions and Bureaus

OMB Office of Management and Budget

-P-

PBL Product Baseline

PCA Physical Configuration Audit

PERT Program Evaluation Review Technique

PRRA Paperwork Reduction Reauthorization Act

-Q-

QA Quality Assurance

QAR Quality Action Report

-R-

RM Risk Management

RTM Requirements Traceability Matrix

-S-

SBD System Boundary Document

SBU Sensitive-but-Unclassified

SCR System Change Request

SDLC Systems Development Life Cycle

SEI Software Engineering Institute

SEMP Systems Engineering Management Plan

SLIM Software Life Cycle Management

SOW Statement of Work

SPM Systems Program Manager

ST&E Security Test and Evaluation

-T-

TAAD Test Analysis Approval Determination

T&E Test and Evaluation

TIM Technical Interchange Meetings

TPM Technical Performance Measurement

TRM Technical Reference Model

-V-

VDD Version Description Document

V&V Verification and Validation

-W-

WBS Work Breakdown Structure