Date |
Description |
12/12/2001 |
Meeting with Rochester Gas & Electric
to discuss technical evaluation regarding potential circumferential
cracking of the reactor vessel head penetration nozzles.
|
11/28/2001 |
Meeting with Davis Besse Nuclear Power
Station to discuss NRC Bulletin 2001-01 inspection schedule.
|
11/20/2001 |
Meeting with Indiana Michigan Power
Company to discuss D. C. Cook Power Station response to NRC Bulletin
2001-01.
|
11/15/2001 |
Teleconference with Davis Besse Nuclear
Power Station to discuss NRC Bulletin 2001-01 response.
|
11/14/2001 |
Meeting with Davis Besse Nuclear Power
Station to discuss NRC Bulletin 2001-01 response.
|
11/13/2001 |
Meeting with Rochester Gas & Electric
to discuss status of RG&E technical evaluation regarding circumferential
cracking of the reactor vessel head penetration nozzles.
|
11/09/2001 |
Teleconference with Davis Besse Nuclear
Power Station to discuss NRC Bulletin 2001-01 response.
|
11/08/2001 |
Meeting with NEI, MRP
and Pressurized Water Reactor Licensees to discuss Alloy 600 Control
Rod Drive Mechanism Nozzle Cracking
|
11/08/2001 |
Meeting with Davis Besse Nuclear Power
Station to discuss NRC Bulletin 2001-01 response.
|
10/24/2001 |
Meeting with Carolina Power &
Light Electric Company regarding Robinson's response to the NRC
Bulletin 2001-01
|
10/22/2001 |
Conference call with Palo Verde Nuclear
Power Station to discuss implementation of NRC Bulletin 2001-01
|
10/12/2001 |
Conference call with Surry Power Station
Units 1 and 2, and North Anna Power Station Units 1 and 2 over
response to NRC Bulletin 2001-01
|
10/11/2001 |
Conference call with Donald C. Cook
Nuclear Plant Units 1 and 2 over response to NRC Bulletin 2001-01
|
10/11/2001 |
Conference call with St. Lucie Plant
Units 1 and 2 over response to NRC Bulletin 2001-01
|
10/05/2001 |
Conference call with Millstone Nuclear
Power Station Unit 2 over response to NRC Bulletin 2001-01
|
10/05/2001 |
Conference call with R. E. Ginna Nuclear
Power Plant over response to NRC Bulletin 2001-01
|
09/21/2001 |
Conference call with Virginia Electric
and Power Company to discuss implementation of NRC Bulletin 2001-01
at North Anna Power Station Unit 1
|
09/07/2001 |
Meeting with Duke Energy Corporation
to discuss the Oconee Nuclear Station response to Bulletin 2001-01,
Circumferential Cracking of Reactor Pressure Vessel Head Penetration
Nozzles.
|
08/15/2001 |
Meeting with the Nuclear
Energy Institute and Operating Pressurized Water Reactor Licensee's
|
07/11/2001 |
Meeting with the Advisory Committee
on Reactor safeguards regarding circumferential cracking of reactor
vessel head penetration nozzles.
|
07/10/2001 |
Meeting with the Advisory Committee
on Reactor Safeguards, Materials & Metallurgy and Plant Operations
Subcommittees regarding circumferential cracking of reactor vessel
head penetration nozzles.
|
07/03/2001 |
Meeting with the Nuclear
Energy Institute and the EPRI Material Reliability Program regarding
MRP-44
Part 2 Report, CRDM nozzle cracking
|
06/07/2001 |
Meeting with the Nuclear Energy Institute
and the EPRI Material Reliability Program regarding MRP-44
Part 2 Report, CRDM nozzle cracking.
|
04/12/2001 |
Meeting with the Nuclear Energy Institute
and the EPRI Material Reliability Program regarding CRDM nozzle
cracking
|