Science and Technology Program
Research Proposal and Performance Contract Management (PropC) System
FY2008 Portfolio of Interdisciplinary R&D Projects
- S&T Program FY2008 Funding Overview
- S&T Program Proposal Submission, Review, and Funding Process
- How are Science and Technology Program R&D Funding Decisions Made to Ensure Quality, Relevance, and Performance?
- S&T Program Steering Team Overview
- S&T Program Roadmap (PDF 39KB)
- Discover the benefits of our On-line PropC Proposal System
S&T Project and Submitter |
Benefiting |
Output Area |
Proposal |
Start Year |
Testing and Improving Distributed Runoff Models for Flood Forecasting as part of NWS DMIP2 John England, Technical Service Center, 86-68530, 303-445-2541, jengland@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
DS1 | 9376 | 2006 |
Long-Term Water-Supply and Drought Prediction with Uncertainty John England, Technical Service Center, 86-68530, 303-445-2541, jengland@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
DS1 | 7325 | 2008 |
New US National Flood Frequency Guidelines John England, Technical Service Center, 86-68530, 303-445-2541, jengland@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
DS1 | 1295 | 2008 |
Investigating alternate methods to automate irrigated and natural vegetation classifications for water accounting. Ronald Miller, Remote Sensing and Geographic Information Group, 86-68260, 303.445.2279, rmiller@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC |
DS2 | 6676 | 2005 |
Developing and evaluating remote sensing based direct ET models to improve water accounting efficiency Ronald Miller, Remote Sensing and Geographic Information Group, 86-68260, 303.445.2279, rmiller@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC |
DS2 | 282 | 2008 |
Modeling and Field Experimentation to Determine the Effects of Terracing and Small Reservoirs on Water Supplies in the Republican River Basin above Hardy, Nebraska Scott Guenthner, Water Resources/GPRegion, GPO-4600, 406-247-7736, SGUENTHNER@gp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP |
DS3 | 9517 | 2005 |
Enhancing Project Performance: Integrating Risk, Uncertainty and Risk-Cost-Benefit (RUCB) Procedures into Project Operation and Planning Analyses James (Kip) Gjerde, Resource Services, GP-4600, 406-247-7750, jgjerde@gp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
DS3 | 9616 | 2008 |
Integrated Information Management System (IIMS) - an Information and Data Management System for Science Based River Management Andreas Krause, Bureau of Reclamation, NC-157B, 530-623-1800, akrause@mp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
DS4 | 165 | 2006 |
Integration of HydroGeoSphere and Groundwater Modeling System. Lorri Peltz-Lewis, Division of Water Resources Management, MP-400, 916-978-5271, LPELTZLEWIS@mp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
DS4 | 3279 | 2008 |
Data Fusion of Remote Sensing and Real Time Field Data in Support of Enhanced River Basin Operations Kurt Wille, Bureau of Reclamation, D-8260, 303-445-2285, kwille@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC |
DS4 | 5307 | 2008 |
Development of WARMF model capability to support San Joaquin River restoration planning and real-time water quality management William Rohwer, Bureau of Reclamation, MP-700, 916-978-5082, wrohwer@mp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP LC |
DS4 | 7341 | 2007 |
USBR Biological Resources Data Management: Developing an Enterprise Approach Douglas Clark, Bureau of Reclamation, 86-68260, 303.445.2271, drclark@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
DS4 | 1713 | 2008 |
Geo-Library Reference Database [Area Office Library materials accessible through an ArcIMS interface Jeremy Dandron, LC Region, PXAO-9100, 602-216-3920, jdandron@lc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE LC |
DS4 | 7751 | 2006 |
Flow Deflectors - Proven Technology Leslie Hanna, WRRL, 86-68560, 303.445.2146, lhanna@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN |
IR1 | 1531 | 2006 |
Improved Methods for Air Demand Analysis and Air Vent Sizing for Hydraulic Structures Joseph Kubitschek, Water Resources Research Laboratory, 86-68560, 303.445.2148, jkubitschek@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR1 | 6418 | 2008 |
Hydraulic Modeling with abrupt changes in Reynold's no. Leslie Hanna, WRRL, 86-68560, 303.445.2146, lhanna@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR1 | 9750 | 2006 |
Flow deflectors for preventing Type II and Type III stilling basin abrasion damage (widespread application) Leslie Hanna, WRRL, 86-68560, 303.445.2146, lhanna@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE GP PN |
IR2 | 81 | 2004 |
Evaluation of Protective Coatings by Electrochemical Impedance Spectroscopy (EIS) to Predict Coating Service Life Allen Skaja, Bureau of Reclamation, 86-68180, 303-445-2396, askaja@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR2 | 7553 | 2006 |
Carbon Fiber Rehabilitation of Prestressed Concrete Pipe Allen Skaja, Bureau of Reclamation, 86-68180, 303-445-2396, askaja@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR2 | 7344 | 2006 |
Very Thin Concrete Repairs in Spillway Tunnels Michael Petronis, Reclamation, MT-432, 406-247-7312, mpetronis@gp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR2 | 8791 | 2008 |
Final development and field demonstration of an innovative outlet works valve Joseph Kubitschek, Water Resources Research Laboratory, 86-68560, 303.445.2148, jkubitschek@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
IR2 | 9532 | 2008 |
pH cell mitigation and field trial of new coatings. Daryl Little, Bureau, 86-68180, 303-445-2384, dlittle@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR2 | 7292 | 2007 |
Wide span stilling basin deflectors (width greater than 30 ft) Leslie Hanna, WRRL, 86-68560, 303.445.2146, lhanna@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE PN GP |
IR2 | 5564 | 2006 |
Development of Performance Criteria for Surface Preparation of Concrete Substrates Pior to Repair and Overlay Kurt VonFay, Technical Service Center, 86-68180, 303-445-2399, kvonfay@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR2 | 1137 | 2007 |
Terrestrial Photogrammetry: Development of Capabilities and Exploring Applications for 3 D Measuring from photographs Pete Shaffner, Technical Service Center, 86-68320, 303.445.3152, pshaffner@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR3 | 5014 | 2005 |
Cooperative Research on Field Capabilities Test/Demonstration for FEMA Indirect Means of Assessing Conditions within Earth Embankment Dams (IMACED) Project. Rich Markiewicz, TSC, 86-68330, 303-445-3167, rmarkiewicz@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR3 | 2538 | 2008 |
Effects of Iron Bacteria on Subsurface Tile Drains: Influence on Hydraulic Efficiency and Nutrient Transport Allen Schlag, BOR, DK-600, 701-250-4242x3617, ASCHLAG@gp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP |
IR3 | 4883 | 2008 |
Reduced Cost Hydroelectric Maintenance Jim DeHaan, Hydroelectric Research and Technical Services Group, 86-68450, 303.445.2305, jdehaan@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
IR5 | 582 | 2003 |
Power System Stability Improvement J Agee, Bureau of Reclamation, 86-68450, 303-445-2309, jagee@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
IR5 | 661 | 2004 |
Power System Diagnostics Eric Eastment, Hydroelectric Research Group, 86-68450, 303.445.2324, eeastment@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
IR5 | 701 | 2004 |
Enhancement of Hydroturbine Operational Flexibility for Powerplant Cost Optimization Ted Bechtel, Technical Service Center, 86-68450, 303-445-2319, tbechtel@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
IR5 | 8301 | 2005 |
Power System Stability Enhancement in the Digitally-Controlled Power System J Agee, Bureau of Reclamation, 86-68450, 303-445-2309, jagee@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
IR5 | 1411 | 2005 |
Rock Ramp Interstitial Flow and Design Guidelines Kent Collins, Bureau of Reclamation, 86-68540, 303-445-2549, kcollins@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN GP |
WD1 | 2253 | 2007 |
Developing Design Guidelines for Low Head Fish Friendly Diversion Dams Brent Mefford, Water Resources Research Laboratory, 86-68560, 303.445.2149, bmefford@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD1 | 6066 | 2006 |
River Spanning Rock Structures Research and Design Guidelines Elaina Holburn, Bureau of Reclamation, 86-68540, 303-445-2550, eholburn@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD1 | 6388 | 2008 |
Cathodic Protection Systems and effects on fisheries near Reclamation Projects Raymond Bark, Fisheries Applications and Research, 86-68290, 303.445.2204, rbark@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN |
WD1 | 3427 | 2006 |
Fish Passage and Entrainment Workshop Steve Hiebert, Technical Service Center, 86-68290, 303-445-2206, shiebert@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD1 | 4803 | 2008 |
Emplacement and Efficacy Testing of Pulsed Direct Current Electrical Barrier Juddson Sechrist, Technical Service Center, 86-68290, 303-445-2198, jsechrist@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN GP |
WD1 | 2503 | 2006 |
Saving Water and Insuring Delivery: Flow Prescription and the Discharge to Habitat Relationship for a Listed Anadromous Salmonid Mark Bowen, Fisheries Applications Research Group, 86-68290, 303.445.2222, mbowen@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP PN |
WD2 | 7899 | 2007 |
Bacteria, Geochemistry, and Hydrology: An Investigation of the Mechanisms of Clogging to Determine How Best to Address Them in Wells and Drains for Improved Operation and Maintenance. Denise Hosler, Technical Service Center, 86-68220, 303-445-2195, dhosler@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD2 | 9999 | 2005 |
Predation on listed fishes at Reclamation facilities and ways to reduce its impact Cathy Karp, Technical Service Center, 86-68290, 303.445.2226, ckarp@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WD2 | 7432 | 2008 |
Small, Terrestrial Mammal Communities within Native and Non-native Dominated Riparian Vegetation along the San Pedro and Gila Rivers in Central Arizona Nicole Olsker, Bureau of Reclamation, PXAO-1500, 623-773-6258, NMOLSKER@lc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE LC |
WD2 | 1705 | 2008 |
Fish-holding-associated stress in slavaged fishes at Reclamation Facilities Don Portz, Bureau of Reclamation, 86-68290, 303-445-2220, dportz@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
WD2 | 2301 | 2008 |
Literature Review of Large Woody Debris (LWD) Guidelines and Implementation Strategies Elaina Holburn, Bureau of Reclamation, 86-68540, 303-445-2550, eholburn@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD2 | 3987 | 2008 |
Quantitatively Monitoring the Effects of the Biocontrol Agent Diorhabda elongata deserticola on Saltcedar Resprouts to Determine the Efficacy of Long-term Biocontrol at Various Reclamation Release Sites in the Western U.S. Denise Hosler, Technical Service Center, 86-68220, 303-445-2195, dhosler@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP LC |
WD3 | 481 | 2005 |
Integrated Control of Invasive Aquatic Weeds for Preventing Blockage of Water Delivery Channels, Conserving Water, and Reducing Operating Costs Scott OMeara, Technical Service Center, 86-68220, 303-445-2216, someara@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD3 | 1001 | 2003 |
Integrating biological control agents (insects) with herbicides for supression of saltcedar (Tamarix spp.): Develpment of cost-effective tools for saving water by controling an invasive phreatophyte Scott OMeara, Technical Service Center, 86-68220, 303-445-2216, someara@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE LC UC |
WD3 | 8946 | 2007 |
Water Conservation and Habitat Improvement in Riparian Floodplains: Evaluation of Integrated Management Methods for Multiple-Species, Multiple-Growth Form Invasive Plants. Scott OMeara, Technical Service Center, 86-68220, 303-445-2216, someara@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP UC |
WD3 | 3430 | 2008 |
Impact of Quagga and Zebra Mussels on Reclamation Fish and Habitat Restoration Activities Cathy Karp, Technical Service Center, 86-68290, 303.445.2226, ckarp@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WD3 | 5123 | 2008 |
Management of Quagga and Zebra Mussels for Preventing Blockage of Water in Delivery Systems and Protecting Infrastructure Fred Nibling, Technical Service Center, 86-68220, 303-445-2202, fnibling@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD3 | 3582 | 2008 |
Assessing Spatially Distributed Temperatures for Water Suitability and Habitat Yong Lai, Technical Service Center, 86-68540, 303-445-2560, ylai@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN MP |
WD4 | 7872 | 2008 |
Evaluation and development of NASA Experimental Advanced Airborne Research LiDAR (EAARL) for accurate representation of high resolution channel bathymetry for hydraulic modeling and aquatic habitat mapping applications. Sharon Parkinson, Bureau of Reclamation, PN-6217, 208.378.5053, sparkinson@pn.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD4 | 9251 | 2008 |
Passive Selenium Bioreactor -- Pilot-scale Testing Michael Baker, Western Colorado Area Office, WCG-MBaker, 970.248.0637, mbaker@uc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC |
WD4 | 4414 | 2008 |
Prediction of River Meandering and Habitat Formation Blair Greimann, Sedimentation and River Hydraulics Group, 86-68540, 303.445.2563, bgreimann@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP LC |
WD5 | 92 | 2006 |
Decision Framework for Resource Managers, Permitting Agencies, and Stakeholders to Determine Potential Sediment Impacts and Analyses for Reservoir Sediment Sluicing and Dam Decommissioning Jennifer Bountry, Bureau of Reclamation, 86-68540, 303-445-3614, jbountry@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 8462 | 2008 |
Advanced Photogrammetry Techniques as a Tool for Evaluating Sediment Gradations Elaina Holburn, Bureau of Reclamation, 86-68540, 303-445-2550, eholburn@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 5066 | 2008 |
Development of a continuous bedload transport measurement technique Robert Hilldale, Technical Service Center, 86-68240, 303-445-3135, rhilldale@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 6499 | 2008 |
Design Methods and Guidelines for New Technology, Low Cost Bank Stabilization Features Also Used For River Restoration. Drew Baird, Technical Service Center, 86-68540, 303-445-2564, dbaird@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 8819 | 2008 |
Surrogate Sediment Measurement Technologies - Federal Interagency Sedimentation Project Robert Hilldale, Technical Service Center, 86-68240, 303-445-3135, rhilldale@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 6435 | 2008 |
Assessing and Reducing the Uncertainty of Predictions From Hydraulic and Hydrologic Models Blair Greimann, Sedimentation and River Hydraulics Group, 86-68540, 303.445.2563, bgreimann@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 8128 | 2007 |
Investigating alternate methods for extracting hydraulic model output measurements. Alan Bell, Technical Service Center, 86-68260, 303-445-2208, abell@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WD5 | 5783 | 2005 |
Demonstration of Field Scale Applications to Control Waterlogging and Salinization Roger Burnett, Ground Water and Drainage, 86-68550, 303.445.2508, rburnett@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP |
WS1 | 2193 | 2005 |
Testing of the subtiming and subgridding algorithms incorporated into HydroGeoSphere to handle intensive computational demand George Matanga, Division of Planning, MP-740, 916-978-5084, gmatanga@mp.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
WS1 | 762 | 2004 |
Cellulose Acetate (CA) Membrane Study Andrew Murphy, Technical Service Center, 86-68230, 303.445.2259, amurphy@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WS2 | 107 | 2005 |
Investigating the Opportunity for Wind-Powered Desalination in Arizona Tom Poulson, Program Development Division, PXAO-7000, 602-216-3836, tpoulson@lc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS2 | 2326 | 2008 |
Comparative Analysis of Inovative Concentrate Management Systems Tom Poulson, Program Development Division, PXAO-7000, 602-216-3836, tpoulson@lc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS2 | 3699 | 2008 |
Optimization of Energy Recovery Seawater Reverse Osmosis Desalination Systems Steve Dundorf, Water Treatment ENgineering and Research Group, 86-68120, 303.445.2263, sdundorf@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS2 | 9081 | 2005 |
Boron Removal from Seawater Kevin Kelly, Ecological Research and Investigations, 86-68220, 303.445.2017, kkelly@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WS2 | 9566 | 2006 |
Development of coatings for polymeric membranes to minimize biofouling Katherine Benko, Bureau of Reclamation, 86-68230, 303-445-2013, kbenko@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WS2 | 9549 | 2005 |
Treatment of Produced Water for Beneficial Use in the Western US Katherine Benko, Bureau of Reclamation, 86-68230, 303-445-2013, kbenko@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE LC GP |
WS2 | 3180 | 2007 |
Demonstration of radio telemetered flow monitoring and canal control technologies Tom Gill, Water Resources Research Laboratory, 86-68560, 303.445.2201, tgill@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP LC |
WS3 | 393 | 2006 |
Developing Low-Head Coanda-Effect Screens Tony Wahl, Water Resources Research Laboratory, 86-68460, 303.445.2155, twahl@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS3 | 7147 | 2005 |
Flow Measurement with Canal Radial Gates Tony Wahl, Water Resources Research Laboratory, 86-68460, 303.445.2155, twahl@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS3 | 1281 | 2004 |
Development and Testing of an Overshot Gate Design that Irrigation Districts can Self-Construct and Maintain Tom Gill, Water Resources Research Laboratory, 86-68560, 303.445.2201, tgill@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
BOR-WIDE |
WS3 | 6890 | 2008 |
Software for Custom Flume and Weir Staff Gages Tony Wahl, Water Resources Research Laboratory, 86-68460, 303.445.2155, twahl@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS3 | 152 | 2006 |
Programmable Logic Control of Automated Surface Irrigation Systems for Improved Water Use Efficiency Mark Niblack, Reclamation, YA)-7300, 928-343-8253, mniblack@lc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS3 | 3877 | 2008 |
"Living Laboratory" for Canal Modernization Technologies Tom Gill, Water Resources Research Laboratory, 86-68560, 303.445.2201, tgill@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE GP |
WS3 | 7316 | 2007 |
Flow Measurement with a Venturi Flume Under Submerged or Unsubmerged Conditions Tom Gill, Water Resources Research Laboratory, 86-68560, 303.445.2201, tgill@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE LC GP |
WS3 | 495 | 2006 |
Development of a coupled hydrologic and economic-trading model to evaluate water trading and water markets in southern Idaho. G. Allyn Meuleman, USBR, SRA-1206, 208-383-2258, ameuleman@pn.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN PN |
WS4 | 5330 | 2006 |
Research and Development of a Comprehensive Guide of Tools for Management of Diverging Science in Reclamation Water Allocation Decisions. Douglas Clark, Bureau of Reclamation, 86-68260, 303.445.2271, drclark@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS4 | 7515 | 2008 |
Development of Improved Evapotranspiration Estimates for Predominant Marsh Plant Communities and Open-Water Evaporation Estimates in the Upper Klamath River Basin Mark Spears, TSC, 86-68520, 303-445-2514, MSPEARS@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE MP |
WS4 | 6485 | 2008 |
Examining the Use of Adaptive Management Workshops to Foster Collaboration Douglas Clark, Bureau of Reclamation, 86-68260, 303.445.2271, drclark@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC |
WS4 | 9132 | 2008 |
Development of a multi-aquifer hydrologic modeling package to support Reclamation water use planning in rural/urban landscapes. Jennifer Johnson_1, Bureau of Reclamation, PN-6216, 208-378-5225, jmjohnson@pn.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE PN |
WS4 | 60 | 2008 |
Western Water Institutional Solutions: Identification, Development, and Application of Institutional Solutions for Western Water Problems Douglas Clark, Bureau of Reclamation, 86-68260, 303.445.2271, drclark@do.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC PN |
WS4 | 147 | 2006 |
Evaluation of Residential Irrigation Controller with On-Site Weather Station for Reduction of Water Use, Deep Percolation and Salt & Selenium Loading in Arid Landscapes Michael Baker, Western Colorado Area Office, WCG-MBaker, 970.248.0637, mbaker@uc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE |
WS5 | 8607 | 2007 |
Reclamation's Major Urban Conservation Opportunity--Efficient Turf Irrigation Fred Liljegren, UC Regional Office, , 801-524-3765, fliljegren@uc.usbr.gov Research Question Team Members Statement of the Problem |
BOR-WIDE UC GP |
WS5 | 6976 | 2007 |
Scoping investigation of the causes for significant snow cover losses in western interior watersheds Thomas Perry, Reclamation, 86-68520, 303-445-2567, tperry@do.usbr.gov Research Question Team Members Statement of the Problem |
GP MP UC |
DS2 | 7350 | 2008 |
Development and Comparison of Long-Term Planning Hydrologies using Alternate Climate Information Sets Levi Brekke, Technical Service Center, 86-68520, 303-445-2494, LBREKKE@do.usbr.gov Research Question Team Members Statement of the Problem |
GP UC |
DS3 | 6395 | 2008 |
Investigating a Modern Method for Improving the Management and Protection of Heritage Assets In Threshing Machine Canyon, Kansas Using Light Detection and Ranging (LiDAR) Technology Thomas Lincoln, Reclamation, 84-53000, 303-445-3311, tlincoln@do.usbr.gov Research Question Team Members Statement of the Problem |
GP |
IR1 | 7686 | 2008 |
Status, distribution and management of aquatic herpetofauna as related to Reclamation projects within the Middle Rio Grande and Missouri River basins. David Moore, Technical Service Center, 86-68210, 303-445-2242, dmoore@do.usbr.gov Research Question Team Members Statement of the Problem |
GP UC |
WD2 | 7650 | 2007 |
Use of High Definition Imaging Sonar as a Methodology for Evaluating Native Fish Spawning Behavior and Habitat Preference in Areas Impacted by Reclamation Structures and Operations. Eric Best, Technical Service Center, 86-68290, 303-445-2179, ebest@do.usbr.gov Research Question Team Members Statement of the Problem |
GP LC PN |
WD2 | 1559 | 2005 |
Early Warning Detection of Zebra Mussel Kevin Kelly, Ecological Research and Investigations, 86-68220, 303.445.2017, kkelly@do.usbr.gov Research Question Team Members Statement of the Problem |
GP LC MP |
WD3 | 8487 | 2007 |
Determining the Rate of Mortality for Saltcedar by Size and Age Class Resulting From Repeated Defoliation by the Biocontrol Agent Diorhabda elongata deserticola in Order to Increase Water Salvage Along Western Rivers. Denise Hosler, Technical Service Center, 86-68220, 303-445-2195, dhosler@do.usbr.gov Research Question Team Members Statement of the Problem |
GP UC LC |
WD3 | 9561 | 2005 |
Managing for Algal Toxins in Reclamation's Project Reservoirs Davine Lieberman, Technical Service Center, 86-68220, 303-445-2223, dlieberman@do.usbr.gov Research Question Team Members Statement of the Problem |
GP UC |
WD4 | 4939 | 2006 |
Using Satellite Imagery to Locate Arundo John Carlson, Technical Service Center, 86-68260, 303-445-2270, jcarlson@do.usbr.gov Research Question Team Members Statement of the Problem |
GP LC |
WS6 | 7602 | 2008 |
Hydroclimatic Index in Drought Forecasting and Climate Scenario Building for the Colorado River Basin Mitchell Haws, Lower Colorado Region, PXAO-8021, 602-216-3937, mhaws@lc.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
LC UC MP |
DS2 | 8836 | 2007 |
Groundwater Modeling Decision Support System Mitchell Haws, Lower Colorado Region, PXAO-8021, 602-216-3937, mhaws@lc.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
LC |
DS2 | 4296 | 2008 |
Invertebrate communities used as indicators of river restoration Mark Nelson, Technical Service Center, 86-68220, 303-445-2225, msnelson@do.usbr.gov Research Question Team Members Statement of the Problem |
LC PN |
WD5 | 1196 | 2006 |
Using remote sensing technology to facilitate detection of river system changes. Ronald Miller, Remote Sensing and Geographic Information Group, 86-68260, 303.445.2279, rmiller@do.usbr.gov Research Question Team Members Statement of the Problem |
LC |
WD5 | 1296 | 2003 |
Slowsand Filtration for Reducing Costs of Desalting Surface Waters Chuck Moody, , 86-68700, 303.445.2258, cmoody@do.usbr.gov Research Question Team Members Statement of the Problem |
LC |
WS2 | 361 | 2004 |
Developing the Next Generation Chlorine Resistant, High Flux, and High Salt Rejection Polyamide Desalting Membrane to Increase Water Suppy Andrew Murphy, Technical Service Center, 86-68230, 303.445.2259, amurphy@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
LC |
WS2 | 526 | 2004 |
Long-term testing near Tucson, Arizona of concentrate management using halophyte irrigation; uses slowsand filtration (SSF) and reverse osmosis (RO) treatment to produce the needed concentrate. Eric Holler, Program Development Division - Tucson, PXAO-7005, 520.670.4825, eholler@lc.usbr.gov Research Question Team Members Statement of the Problem |
LC UC GP |
WS2 | 6551 | 2005 |
Foward Osmosis Water Purification Chuck Moody, , 86-68700, 303.445.2258, cmoody@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
LC |
WS2 | 1289 | 2004 |
Monitoring and Evaluation of the Potential Impacts of the Red Bluff Diversion Dam on Green Sturgeon Richard Corwin, Bureau of Reclamation, NC-342, 530-528-0512, rcorwin@mp.usbr.gov Research Question Team Members Statement of the Problem |
MP PN |
WD1 | 1887 | 2008 |
Reducing Risk of Water Conflicts Related to Operational Impacts to Salmon. John Hannon, Regional Environmental Office, MP-150, 916-978-5524, jhannon@mp.usbr.gov Research Question Team Members Statement of the Problem |
MP PN |
WD2 | 2759 | 2006 |
Developing Ultrasound Imaging as a Fish Research and Management Tool at Reclamation Fish Facilities Susan Broderick, Technical Service Center, 86-68210, 303-445-2235, sbroderick@do.usbr.gov Research Question Team Members Statement of the Problem |
MP PN MP |
WD2 | 4067 | 2008 |
Chemical Treatment Technology for Removal of Selenium Katherine Benko, Bureau of Reclamation, 86-68230, 303-445-2013, kbenko@do.usbr.gov Research Question Team Members Statement of the Problem |
MP UC |
WS2 | 9030 | 2007 |
Past Climate Change and GW Pumping Influences on Historic Streamflow Traces and the Consequences of Using Historic Streamflow Traces in Operations Planning Leslie Stillwater, River and Reservoir Operations, Pacific Northwest Region, PN-6213, 208.378.5202, lstillwater@pn.usbr.gov Research Question Team Members Statement of the Problem |
PN |
DS2 | 8404 | 2008 |
Establishment of Native Shrubs and Trees in Reservoir Drawdown Zones for Restoration of Endangered Bull Trout (Salvelinus confluentus) Habitat Ken Lair, Ecological Research and Investigations, 86-68220, 303.445.2005, klair@do.usbr.gov Research Question Team Members Statement of the Problem |
PN |
WD2 | 1265 | 2004 |
Inhibition of Biofilm Formation Kevin Kelly, Ecological Research and Investigations, 86-68220, 303.445.2017, kkelly@do.usbr.gov Research Question Team Members Statement of the Problem |
PN MP GP |
WD2 | 3326 | 2005 |
Inventory of Reclamation facilities where lamprey species exist, issues confronting lamprey, and how to aid fishways for passage and monitoring. Raymond Bark, Fisheries Applications and Research, 86-68290, 303.445.2204, rbark@do.usbr.gov Research Question Team Members Statement of the Problem |
PN MP |
WD2 | 3732 | 2005 |
Habitat modeling field validation for various salmonid life stages in Middle Fork John Day River, Oregon Chelsie Morris, Reclamation, 86-68290, 303-445-2237, cgmorris@do.usbr.gov Research Question Team Members Statement of the Problem |
PN MP GP |
WD2 | 69 | 2008 |
Automated fish separator, imaging,and data recording system for use on existing fish traps and monitoring systems Steve Hiebert, Technical Service Center, 86-68290, 303-445-2206, shiebert@do.usbr.gov Research Question Team Members Sorry, this proposal contains potential intellectual property. Please contact the submitter. |
PN MP GP |
WD2 | 6668 | 2007 |
Developing Low-cost, Effective Methods for Evaluating Aquatic Ecosystems Mark Nelson, Technical Service Center, 86-68220, 303-445-2225, msnelson@do.usbr.gov Research Question Team Members Statement of the Problem |
PN MP LC |
WD4 | 101 | 2003 |
Evaluation of alternative legal, institutional, economic, and hydrologic approaches for ground-water banking to facilitate water transfers among uses and users in the Snake River basin. Jennifer Johnson_1, Bureau of Reclamation, PN-6216, 208-378-5225, jmjohnson@pn.usbr.gov Research Question Team Members Statement of the Problem |
PN |
WS1 | 901 | 2004 |
Evaluation of potential and development of a real time river basin operations tool Roger Hansen, Provo Area Office, Upper Colorado Region, PRO-713, 801-379-1170, rhansen@uc.usbr.gov Research Question Team Members Statement of the Problem |
UC |
DS3 | 7200 | 2008 |
Developing operational criteria information for temperature control device installation at Reclamation facilities through the use of real-time integrated entrainment monitoring systems to improve reliability of water and power delivery. Juddson Sechrist, Technical Service Center, 86-68290, 303-445-2198, jsechrist@do.usbr.gov Research Question Team Members Statement of the Problem |
UC LC |
WD1 | 4149 | 2007 |
Assessment of Pelagic Fish Entrainment at Glen Canyon Dam Using Experimental Fyke-type Netting Systems Juddson Sechrist, Technical Service Center, 86-68290, 303-445-2198, jsechrist@do.usbr.gov Research Question Team Members Statement of the Problem |
UC |
WD2 | 4017 | 2008 |
Investigation of Updates Aquatic Herbicides and Newer Technologies for controlling aquatic pest in water conveyance systems in the 17 western states David Sisneros, Technical Service Center, 86-68220, 303-445-2228, dsisneros@do.usbr.gov Research Question Team Members Statement of the Problem |
UC GP |
WD3 | 4871 | 2008 |