Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
99 |
|
CROSS FLOW DATA ACQUISITION IN PROGRESS. |
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
GENERATOR VOLTAGE REGULATOR IN MANUAL |
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
345 KV LINE MAINTENANCE TO BE PERFORMED ON DAY SHIFT ONLY FOR THE NEXT SEVERAL DAYS. |
|
|
Millstone 3 |
100 |
|
345 KV LINE MAINTENANCE TO BE PERFORMED ON DAY SHIFT ONLY FOR THE NEXT SEVERAL DAYS. |
|
|
Nine Mile Point 1 |
100 |
|
|
* |
|
Nine Mile Point 2 |
85 |
|
RETURNING TO FULL POWER FOLLOWING RESTORATION OF MOISTURE SEPARATOR REHEATERS |
* |
|
Oyster Creek |
100 |
|
4 RECIRC LOOP OPERATION, 'C' RECIRC PUMP SEAL FAILURE. |
|
|
Peach Bottom 2 |
100 |
|
STARTUP SOURCE 343 OOS |
|
|
Peach Bottom 3 |
100 |
|
STARTUP SOURCE 343 OOS |
|
|
Pilgrim 1 |
100 |
|
TRANSMISSION SYSTEM WORK IN VICINITY OF PLANT |
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
345 KV LINE (363) MAINTENANCE ONGOING.
POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY |
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
100 |
|
|
|
|