Power Reactor Status Report for November 8, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
0 |
11/05/2007 |
FEED PUMP MAINTENANCE |
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
0 |
10/13/2007 |
REFUELING OUTAGE |
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) |
|
|
Millstone 3 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) |
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
0 |
11/03/2007 |
MAINTENANCE OUTAGE, DRYWELL HEAD OFF |
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
STARTUP SOURCE 343 OOS FOR TEST |
|
|
Peach Bottom 3 |
100 |
|
STARTUP SOURCE 343 OOS FOR TEST |
|
|
Pilgrim 1 |
100 |
|
LINE 342 AT PARTIAL CAPACITY - IF OTHER 345KV LINE IS LOST ISO WILL REQUEST REDUCTION TO 400MWE |
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY |
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
0 |
10/21/2007 |
REFUELING OUTAGE |
|
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
11/03/2007 |
MAINTENANCE OUTAGE FOR NOBLE METALS - 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS - COMPENSATION XFMR "B" AND COOLING TOWER XFMR #2 OOS - EXPECT RESTORATION WITHIN 24-48 HRS |
|
|
Browns Ferry 2 |
100 |
|
1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS - COMPENSATION XFMR "B" AND COOLING TOWER XFMR #2 OOS - EXPECT RESTORATION WITHIN 24-48 HRS |
|
|
Browns Ferry 3 |
100 |
|
1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS - COMPENSATION XFMR "B" AND COOLING TOWER XFMR #2 OOS - EXPECT RESTORATION WITHIN 24-48 HRS |
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
WHITEVILLE LINE IS BEING INSPECTED THIS MORNING FOR DAMAGE FOLLOWING A BRUSH FIRE NEAR THE TRANSMISSION LINE. IN THE EVENT THE LINE IS REMOVED FROM SERVICE, THE UNIT WILL DOWNPOWER TO 680 MWE |
* |
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
0 |
09/14/2007 |
REFUELING OUTAGE |
|
|
Crystal River 3 |
0 |
11/02/2007 |
REFUELING OUTAGE |
* |
|
Farley 1 |
0 |
09/28/2007 |
REFUELING OUTAGE |
* |
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
0 |
10/26/2007 |
DEFUELED |
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
0 |
09/30/2007 |
DEFUELED |
|
|
Sequoyah 1 |
0 |
10/03/2007 |
REFUELING OUTAGE |
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
0 |
10/20/2007 |
DEFUELED |
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
98 |
|
REDUCED POWER TO RESOLVE CALORIMETRIC ISSUE |
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Vogtle 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
92 |
|
INCREASING POWER |
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
48 |
|
INCREASING POWER |
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
0 |
10/28/2007 |
REFUELING OUTAGE |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Fermi 2 |
0 |
09/29/2007 |
REFUELING OUTAGE |
* |
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
98 |
|
TESTING IN PROGRESS |
* |
|
Prairie Island 1 |
100 |
|
345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK |
|
|
Prairie Island 2 |
100 |
|
345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK |
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
0 |
09/29/2007 |
DEFUELED |
|
|
River Bend 1 |
0 |
11/07/2007 |
MANUAL REACTOR SCRAM DUE TO LOSS OF ONE OF TWO 13.8 KV BUS. SEE EVENT 43773 FOR DETAILS |
* |
1 |
San Onofre 2 |
98 |
|
S/G LIMITATIONS |
* |
|
San Onofre 3 |
0 |
10/09/2007 |
PROGRESSING TOWARDS STARTUP |
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|