Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Dataweb

Central California Area
   
Projects
Summary
Click for More Information 1. Folsom Dam Safety and Flood Damage Reduction EIS/EIR************************************************** 2. Folsom Dam Safety and Flood Damage Reduction Supplemental Environmental assessment/Initial Study 1. Reclamation seeks to improve public safety downstream of Folsom Dam by modifying the dam and its ...
Click for More Information American River Division Long Term Contract Renewal EIS Cumulative impacts...
Click for More Information Auburn State Recreational Area Resource Management Plan/General Plan EIS/EIR Auburn State Recreation Area, managed by California Department of Parks and Recreation (DPR), is loc...
Click for More Information El Dorado County Water Agency Proposed Water Service Contract EIS/EIR The proposed project consists of a water supply contract for the El Dorado County Water Agency under...
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Ditch rights and Weber Reservoir The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ...
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Project 184 The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ...
Click for More Information El Dorado Irrigation District's Pump Station Temperature Control Device Environmental Assessment Reclamation and EID plan to install a TCD on EID's existing water supply intake in Folsom Reservoir ...
Click for More Information Folsom Lake State Recreation Area General Plan/Resource Management Plan EIS/EIR Purpose is to guide long-term management of Folsom Lake State Recreation Area. Major issues are imp...
Click for More Information New Melones Resource Management Plan/Environmental Impact Statement (RMP/EIS) The purpose of the RMP is to develop a framework for long-term management of recreation facilities a...
Click for More Information North Fork Trail Project EA/IS Placer County is proposing to construct a multiple-use trail with adequate parking and staging faci...
Click for More Information Old Camp 9 Bridge Removal EA Reclamation proposes to demolish and remove the Old Camp Nine Bridge and approaches to eliminate a p...
Click for More Information Peoria Wildlife Management Area EA Assessment of Peoria Wildlife Management Area at New Melones Lake, based on the Interim Shell Road P...
Click for More Information Proposed Motocross Track Repair in Mammoth Bar Off-Highway Vehicle Area EA The Finding of No Significant Impact (FONSI) was signed June 18, 2007. The purpose of this project ...
Click for More Information Sacramento Suburban Water District Warren Act Contract EA Purpose is to convey up to 29,000 acre-feet of Placer County Water Agency water per year to Sacramen...
Click for More Information Summary of Recent Categorical Exclusion Checklists Attached in the Documents section are the titles of Categorcal Exclusion Checklists for the Central ...
Click for More Information Visitor Services Plan for the Lake Berryessa Resource Area EIS Develop a Visitor Services Plan for the Lake Berryessa Resource Area. This will identify the type an...