Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Dataweb

Central California Area
   
Projects
Summary
Click for More Information 1. Folsom Dam Safety and Flood Damage Reduction EIS/EIR************************************************** 2. Folsom Dam Safety and Flood Damage Reduction Supplemental Environmental assessment/Initial Study 1. Reclamation seeks to improve public safety downstream of Folsom Dam by modifying the dam and its ...
Click for More Information American River Division Long Term Contract Renewal EIS Cumulative impacts...
Click for More Information Auburn State Recreational Area Resource Management Plan/General Plan EIS/EIR Auburn State Recreation Area, managed by California Department of Parks and Recreation (DPR), is loc...
Click for More Information El Dorado County Water Agency Proposed Water Service Contract EIS/EIR The proposed project consists of a water supply contract for the El Dorado County Water Agency under...
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Ditch rights and Weber Reservoir The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ...
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Project 184 The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ...
Click for More Information El Dorado Irrigation District's Pump Station Temperature Control Device Environmental Assessment Reclamation and EID plan to install a TCD on EID's existing water supply intake in Folsom Reservoir ...
Click for More Information Folsom Lake State Recreation Area General Plan/Resource Management Plan EIS/EIR Purpose is to guide long-term management of Folsom Lake State Recreation Area. Major issues are imp...
Click for More Information New Melones Resource Management Plan/Environmental Impact Statement (RMP/EIS) The purpose of the RMP is to develop a framework for long-term management of recreation facilities a...
Click for More Information North Fork Trail Project EA/IS Placer County is proposing to construct a multiple-use trail with adequate parking and staging faci...
Click for More Information Old Camp 9 Bridge Removal EA Reclamation proposes to demolish and remove the Old Camp Nine Bridge and approaches to eliminate a p...
Click for More Information Peoria Wildlife Management Area EA Assessment of Peoria Wildlife Management Area at New Melones Lake, based on the Interim Shell Road P...
Click for More Information Proposed Motocross Track Repair in Mammoth Bar Off-Highway Vehicle Area EA The Finding of No Significant Impact (FONSI) was signed June 18, 2007. The purpose of this project ...
Click for More Information Sacramento Suburban Water District Warren Act Contract EA Purpose is to convey up to 29,000 acre-feet of Placer County Water Agency water per year to Sacramen...
Click for More Information Summary of Recent Categorical Exclusion Checklists Attached in the Documents section are the titles of Categorcal Exclusion Checklists for the Central ...
Click for More Information Visitor Services Plan for the Lake Berryessa Resource Area EIS Develop a Visitor Services Plan for the Lake Berryessa Resource Area. This will identify the type an...

Klamath Basin Area
   
Projects
Summary
Click for More Information Klamath Project Long-term Operations Plan EIS The proposed action, its purpose and need, and the scope of the EIS redefined in response to issues ...
Click for More Information Summary of recent categorical checklists Attached in the Documents section are the titles for any recent Categorcal Exclusion Checklists for ...
Click for More Information Upper Klamath Lake Fish Screen Program Draft Environmental Assessment Reclamation proposes to provide funding to Oregon Department of Fish and Wildlife to install fish sc...

Lahontan Basin Area
   
Projects
Summary
Click for More Information Below Derby Dam Low Flow Channel EA The project to be analyzed is augmenting the fishway at Derby Dam, Truckee River, east of Reno, Neva...
Click for More Information Conveyance of the Newlands Project Headquarters and Maintenance Yard Facility Environmental Assessment The purpose of the proposed action is to transfer the Newlands Project Headquarters and Maintenance ...
Click for More Information Fallon Naval Air Station Effluent Discharge Environmental Assessment The Naval Air Station is discharging treated sewage effluent into Reclamation's Newlands Project dra...
Click for More Information Newlands Project Resource Management Plan (RMP) Reclamation will be preparing an environmental document for the purpose of evaluating options for ma...
Click for More Information Pyramid Lake Paiute Tribe Fisheries Improvement Environmental Assessment This project is funded under the Reclamation's Desert Terminal Lakes (DTL) Program created under Pub...
Click for More Information Summary of Categorical Exclusion Checklists for Fiscal Year 2007 Attached in the Documents section are the titles of recent Categorical Exclusion Checklists for the ...
Click for More Information TC1 Canal Crossing Environmental Assessment The City of Fernley is proposing to construct a water treatment plant for City water supplies to mee...
Click for More Information Truckee River Operating Agreement EIS/EIR The action considered is implementation of the Truckee River Operating Agreement (TROA) in accordanc...
Click for More Information Truckee River Restoration Environmental Assessment Reclamation is co-lead with BLM for this NEPS project for the restoration of three sites on the lowe...
Click for More Information Truckee-Carson Irrigation District Headquarters Conveyance EA The conveyance is authorized under Public Law 109-265, dated August 3, 2006. The Truckee-Carson Irr...
Click for More Information Walker Reservation Fallowing Environmental Assessment Reclamation and Bureau of Indian Affairs are co-leads on this EA. This project is funded under the ...
Click for More Information Walker River Basin Acquisition Program EIS The Walker River Basin Acquisition is funded under the Bureau of Reclamations Desert Terminal Lakes...

Northern California Area
   
Projects
Summary
Click for More Information Anderson-Cottonwood Irrigation District Long-Term Water Transfer to the City of Shasta Lake EA Reclamation proposes to approve a lon-term water transfer of up to 140 acre-feet per year from the A...
Click for More Information Anderson-Cottonwood Irrigation District Long-Term Water Transfer to the Shasta Community Services District The proposed action is the long-term transfer of up to 464 acre-feet of Central Valley Project water...
Click for More Information Coleman National Fish Hatchery Water Intakes Rehabilitation Project EA/IS Reclamation and the U.S. Fish and Wildlife Service (Service) propose to modify water intakes and con...
Click for More Information Drumheller Slough and White Mallard Dam and Associated Diversion Project IS/EA White Mallard Dam would be modified to enhance water management and fish passage. Subsequent phases...
Click for More Information East Park Reservoir Fire Management Plan EA Reclamation proposes to implement a Fire Management Plan (FMP) at East Park Reservoir in Colusa Coun...
Click for More Information Glenn-Colusa Irrigation District Short-Term Water Transfer to the San Luis & Delta-Mendota Water Authority EA The proposed action is a short-term one-year transfer of up to 85,000 acre-feet of Central Valley Pr...
Click for More Information Miscellaneous Small Environmental Assessments 1. NC-05-01 Addendum to the Environmental Assessment/FONSI for Lower Butte Creek-Sutter Bypass West ...
Click for More Information Orland Project - Construction of a Small Regulatory Reservoir Reclamation proposed to approve the Orland Unit Water Users'Association proposal to construct and us...
Click for More Information Red Bluff Diversion Dam Fish Passage Project EIS/EIR Objective is to improve fish passage, particularly for Spring-run Chinook, and improve the reliabili...
Click for More Information Renewal of Sacramento River Settlement Contract EIS Involves the entities and individuals asserting senior rights to divert water from the natural flow ...
Click for More Information Stony Gorge Reservoir Fire Management Plan 2007 Environmental Assessment The Fire Management Plan (FMP) was developed to guide a range of fire management activities permitte...
Click for More Information Summary of Recent Categorical Exclusion Checklists Attached in the Documents section are the titles of recent Categorcal Exclusion Checklists for the N...
Click for More Information Trinity River Restoration Program - Completion of Phase 1 Channel Rehabilitation Projects with Planned Phase 2 Channel Rehabilitation and Sediment Management Projects Master EA/EIR The Master EA/EIR will be site specific for the Remaining 8 Group of sites which is located between ...
Click for More Information Trinity River Restoration Program: Indian Creek Rehabilitation Site: Trinity River mile 93.7 to 96.5 EA/EIR The Project purpose and need is to provide increased juvenile salmonid rearing habitat on the mainst...
Click for More Information Trinity River Restoration Program: Lewiston-Dark Gulch Rehabilitation Project: Trinity River Mile 105.4 to 111.7; Notice of Preparation for an EA/EIR This mechanical channel rehabilitation project is one of those originally identified in the Interior...

Regional Office
   
Projects
Summary
Click for More Information American Basin Fish Screen and Habitat Improvement Project EIS/EIR. Project objectives include: Installing positive barrier fish screens to minimize the entrainment of ...
Click for More Information Antioch/Delta Diablo Sanitation District Recycled Water Project Environmental Assessment/Initial Study The City of Antioch proposes to extend the recycled water pipeline from the existing Recycled Water ...
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2007 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP)is to meet the needs, inc...
Click for More Information Contra Costa Canal Replacement Project Contra Costa Water District has requested that Reclamation approve thier request to replace the 3.97...
Click for More Information Contra Costa Water District Alternative Intake Project EIR/EIS Contra Costa Water District (CCWD) relies entirely upon the Sacramento-San Joaquin Delta for its sup...
Click for More Information Delta Mendota Canal (DMC) Recirculation Project The objective of the DMC Recirculation Feasibility Study is to determine whether recirculation of ex...
Click for More Information Delta-Mendota Canal/California Aqueduct Intertie EIS The proposed Delta-Mendota Canal/California Aqueduct Intertie (Intertie)project consists of construc...
Click for More Information Environmental Water Account EIS/EIR (Short-Term EWA) The Environmental Water Account was established in the CALFED Programmatic EIS/EIR. The purpose of E...
Click for More Information Glenn-Colusa Irrigation District Stony Creek Fan Aquifer Performance Testing Plan EA Glenn-Colusa Irrigation District (GCID) has been cooperating with neighboring water purveyors, the B...
Click for More Information Grassland Incremental Level 4 Groundwater Acquisition Pilot Project - Water Years 2008-2010 Environmental Assessment Under the proposed action, Reclamation would purchase up to approximately 10,000 acre-feet of water ...
Click for More Information Gray Lodge Wildlife Area, Agreement for the Reimbursement of Deep Well Pumping Costs between the United States and the State of California Bureau of Reclamation proposes to extend the performance period for the Agreement for the Reimbursem...
Click for More Information Kern National Wildlife Refuge, Annual Acquisition and Conveyance of up to 20,000 Acre-Feet of Water to Meet FWS Level 4 Water Supply Needs for Water Years 2007-2011. Environmental Assessment The proposed action is for Reclamation to enter into annual agreements with Kern-Tulare Water Distri...
Click for More Information Long-Term Environmental Water Account EIS/EIR The Environmental Water Account (EWA) was established in the CALFED Programmatic EIS/EIR. The purpo...
Click for More Information Los Vaqueros Expansion Studies EIS/EIR(LVES) The objectives of the Los Vaqueros Expansion Studies are to develop water supplies for environmental...
Click for More Information Lower American River Salmonid Spawning Gravel Augmentation and Side-Channel Habitat Establishment Program (American River Steelhead and Salmon Habitat Restoration) EA/IS Reclamation proposes to add spawning gravel to the lower American River at seven sites from Nimbus D...
Click for More Information Lower Yuba River Accord EIS/EIR The Yuba Accord includes three separate but interrelated agreements that would result in enhancement...
Click for More Information Madera Irrigation District Pilot Recharge and Recovery Project at Madera Ranch This project allows Madera Irrigation District to perform pilot recharge of surface water outside of...
Click for More Information Madera Irrigation District Transfer, Banking, and Exchange of Friant Central Valley Project Water to Westlands Water District as Facilitated by North Kern Water Storage District, Semitropic Water Storage District, and Kern County Water Agency Environmental Assessment The project allows Westlands Water District to purchase 25,000 acre-feet of Madera Irrigation Distri...
Click for More Information Mendota Wildlife Area - Conveyance of Refuge Water Supply South San Joaquin Valley Study Area EA/IS Purpose is to provide infrastructure (conveyance capacity) to transport water supplies to refuges. ...
Click for More Information Meridian Farms Fish Screen Project EA/IS Reclamation proposes to provide funds from the Anadromous Fish Screen Program to allow Meridian Farm...
Click for More Information Middle Rosewood Creek Restoration Project, Implementation Area F Environmental Assessment The proposed project represents continued efforts to stabilize a portion of a watershed that has bee...
Click for More Information North of the Delta EIS/EIR The purpose of North of the Delta Offstream Storage is to investigate surface storage north of the D...
Click for More Information North San Pablo Bay Restoration and Reuse Project EIS/EIR The Sonoma County Water Agency (SCWA) is planning the North Bay Water Reuse Program. The Title XVI ...
Click for More Information North Sonoma County Agricultural Reuse Project (Title XVI), EIR/EIS The proposed Project is located in Sonoma County, in the vicinity of Santa Rosa, California. The So...
Click for More Information Patterson ID Fish Scren EA/IS The primary purpose of the project is to provide a positive means of preventing entrainment of migra...
Click for More Information RD 2035 Fish Screen Diversion Project EA/IS Reclamation District 2035 proposes to construct a new 400 cfs pump station and flat plate-wedge-wire...
Click for More Information Riparian Hardwoods Restoration and Enhancement Burton Creek State Park, D.L. Bliss State Park, Ed Z'berg-Sugar Pine Point State Park, Ward Creek Unit, and Washoe Meadows State Park Environmental Assessment/Initial Study The California Department of Parks and Recreation and the Bureau of Reclamation and propose to rest...
Click for More Information Sacramento River Diversion Feasibility Study EIS/EIR (a.k.a. Sacramento River Water Reliability Study (SRWRS)) The purpose of the study is to develop a water supply plan that is consistent with the Water Forum o...
Click for More Information San Joaquin River Restoration Program Programmatic EIS/EIR Reclamation and the California Department of Water Resources (DWR) propose to prepare a PEIS/EIR for...
Click for More Information San Luis Reservoir Low Point EIS/EIR The Santa Clara Valley Water District (SCVWD) has proposed the San Luis Reservoir Low Point Improvem...
Click for More Information San Luis Unit Feature Reevaluation EIS Purpose is to evaluate proposed actions to provide long-term drainage service to the San Luis Unit (...
Click for More Information Shasta Lake Water Resources Investigation EIS Reclamation is conducting a feasibility study including preparation of a decision document and envir...
Click for More Information Short-term Sacramento Valley Water Management Program EIS/EIR. The Short-term phase of the SVWM Program resolves water quality and water rights issues arising from...
Click for More Information South Delta Improvements Program EIS/EIR The SDIP is a joint California Department of Water Resources (DWR) and Reclamation project that cont...
Click for More Information Stanislaus River Salmonid Spawning Gravel Addition 2007 The purpose of the action is to replenish spawning gravel at existing and new restoration sites in t...
Click for More Information Suisun Marsh Habitat Management, Preservation, and Restoration Plan Programmatic EIS/EIR Develop a regional plan for Suisun Marsh that balances implementation of the CALFED Program, the Sui...
Click for More Information Summary of Recent Categorical Exclusion Checklists Attached in the Documents section are the titles of recent Categorcal Exclusion Checklists for the R...
Click for More Information Upper San Joaquin River Basin Storage Project EIS/EIR The purpose of the study is to evaluate proposed actions to increase the storage of water from the S...
Click for More Information Upper Truckee River and Marsh Restoration Project EIS/EIS/EIR The Tahoe Regional Planning Agency, California Tahoe Conservance and Reclamation are proposing a joi...
Click for More Information Upper Truckee River Restoration Project Middle Reaches 3 and 4 EA/IS/IEC The City of South Lake Tahoe with grant funding from the California Tahoe Conservancy and Reclamatio...
Click for More Information Westlands Water District Transfer of Stored Water to Semitropic Water District in 2008 - Environmental Assessment Westlands Water District has been participating in groundwater banking at Semitropic Water Storage D...

South-Central California Area
   
Projects
Summary
Click for More Information 2008 Conditional One Year Pre-approval of Transfers and Exchanges Between Friant and Cross Valley Long-Term CVP Contractors and Non-CVP Contractors The Bureau of Reclamation proposes to programmatically pre-approve transfers and exchanges of up to ...
Click for More Information Acquisition of Land from John Hubbell, et al. (Hubbell Property), San Justo Reservoir Environmental Assessment Reclamation proposes to purchase a 41.56-acre parcel of land adjacent to San Justo Reservoir in San ...
Click for More Information Cachuma Lake Resource Management Plan EIS The purpose of the RMP is to establish management objectives, guidelines, and actions to be impleme...
Click for More Information Categorical Exclusion Checklist Summaries June 2008 Attached in the Documents section are the titles of recent Categorcal Exclusion Checklists for the S...
Click for More Information Chowchilla Water District - Annexation of Subordinate Lands Reclamation will approve the annexation of 3,393.62 acres of land to be included in Chowchilla Water...
Click for More Information Construction of Conveyor over the Delta-Mendota Canal at Mile Post 80.0, Merced County Environmental Assessment Reclamation proposes to approve a permit for construction of a conveyor over the Delta-Mendota Canal...
Click for More Information Delta Lands Reclamation District 770 Long-term Warren Act Contract and License Reclamation proposes the execution of two legal instruments with the Delta Lands Reclamation Distric...
Click for More Information Delta-Mendota Canal - 2007 Approval of One-year Temporary Warren Act Contracts for the Conveyance of Non-CVP Water EA-07-52 Reclamation proposes to issue one-year temporary Warren Act Contracts to requesting Central Valley P...
Click for More Information Delta-Mendota Canal 2008 Approval of One-Year Temporary Warren Act Contracts for the Conveyance of Non-CVP Water 2008 Reclamation proposes to issue one-year temporary Warren Act Contracts to requesting Central Valley ...
Click for More Information Fresno County Central Valley Project Service Area Boundary Change EA Reclamation proposes to approve the County of Fresnos Central Valley Project (CVP) service area bou...
Click for More Information Friant-Kern Canal/Cross Valley Canal Intertie Construction Project Environmental Assessment Reclamation proposes to issue a permit to the Friant Water Authority for construction of a turnout a...
Click for More Information Hilton Creek Check Dam EA Reclamation proposes to construct a small check dam at the downstream end of a pool below a cascade ...
Click for More Information Ivanhoe Irrigation District to Kaweah Delta Water Conservation District, Partial Assignment of CVP Contract and Associated water Supply Reclamation proposes to approve the partial assignment of 1,200 acre-feet per year (af/yr) of Class ...
Click for More Information Kern-Tulare Water District and Rag Gulch Water District Contract for Conveyance of Non-Central Valley Project Water 2008 Reclamation proposes to execute a one-year Warren Act Contract for 2008 to convey 20,000 acre-feet o...
Click for More Information Lake Casitas Resource Management Plan EIS Resource Management Plan for Federal lands associated with the Casitas Dam and Lake Casitas, Ventura...
Click for More Information Lindsay-Strathmore Irrigation District 2007 Warren Act Contract Environmental Assessment The Bureau of Reclamation proposes to approve a temporary Warren Act contract for one year with Lind...
Click for More Information Lindsay-Strathmore Irrigation District One-Year Warren Contract, Kaweah River (Wutchumna) Water Supply 2008 Only Reclamation proposes to enter into a temporary Warren Act Contract for one year with Lindsay-Strathm...
Click for More Information Long-term Contract Renewal for Pajaro Valley Water Management Agency, Santa Clara Valley Water District and Westlands Water District's portion of the Mercy Springs Water District Contract Assignment - EA In 1999, Reclamation approved a contract assignment for a portion of the Mercy Springs long-term con...
Click for More Information Long-term Renewal of CVP Contracts - Delta-Mendota Canal Unit EA Reclamation proposes to renew long-term water service contracts with the 20 Delta-Mendota Canal Uni...
Click for More Information Long-term Renewal of CVP Contracts - San Felipe Division EA EA is being developed to evaluate the effects of renewal of long-term CVP contracts for Zone 6 of Sa...
Click for More Information Madera Irrigation District One-Year Warren Act Contract and Additional Point of Delivery into Fresno County Water Works #18 2008 Only Reclmation proposes to execute a one-year Warren Act Contract with Madera Irrigation District (MID) ...
Click for More Information Madera Irrigation District Water Supply Enhancement Project EIS/EIR Madera Irrigation District (MID)proposes to construct a groundwater bank on the property known as Ma...
Click for More Information Meyers Farm Water Banking Project - 2007 Supplement EA The Proposed Action would allow the maximum annual extraction rate from the existing Meyers Farm Wat...
Click for More Information Millerton Lake Kiosk Replacement, Environmental Assessment Reclamation proposes to approve the replacement of the South Shore Entrance Kiosks. Replacement wil...
Click for More Information Millerton Lake Resource Management Plan and General Plan Programmatic EIS/EIR The plan will establish management objectives, guidelines and actions to protect water supply and qu...
Click for More Information North Kern Water Storage District Permit for the Temporary Bridge Crossing of the Friant-Kern Canal at Shellabarger Road EA Reclamation proposes to issue a Transportation and Utility Systems and Facilities on Federal Lands p...
Click for More Information Renewal of Interim Water Service Contracts through February 28, 2010 Reclamation proposes to renew 15 interim water service contracts for a two-year period from March 1,...
Click for More Information Restroom Replacement and Trail Construction - San Luis Reservoir State Recreation Area The purpose of this project is to improve the restroom facilities at Basalt and San Luis Creek Campg...
Click for More Information San Joaquin River Exchange Contractors Water Authority, 25-Year Water Transfer Project, Environmental Assessment/Initial Study The EA/IS evaluates the transfer of up to 20,000 acre-feet of substitute water from the Exchange Con...
Click for More Information San Luis & Delta-Mendota Water Authority and San Joaquin River Exchange Contractors Water Authority Substitute Water Exchange EA The Bureau of Reclamation proposes to approve an exchange between the San Joaquin River Exchange Con...
Click for More Information San Luis Reservoir and Los Banos Creek State Recreation Area Joint General Plan and Resource Management Plan Programmatic EIS/EIR Purpose is to establish management objectives, guidelines, and actions to be implemented to protect ...
Click for More Information San Luis Unit Long Term Contract Renewal EIS EIS evaluating the effects of the renewal of 9 San Luis Unit Contractors long-term CVP water contrac...
Click for More Information San Luis Unit Water Service Interim Renewal Contracts 2008 - 2011 The purpose of the proposed action is to execute seven San Luis Unit interim renewal contracts for u...
Click for More Information Santa Clara Valley Water District Access Road Repair - Calaveras Fault Crossing Environmental Assessment Reclamation proposes to repair three slope failures on the north side of the Santa Clara Conduit acc...
Click for More Information Santa Clara Valley Water District Pipeline Maintenance Program for the Pacheco and Santa Clara Conduits and Tunnels The Santa Clara Valley Water District is proposing a Pipeline Maintenance Program (PMP) for their 14...
Click for More Information South Coast Conduit Upper Reach Reliability Project EIS/EIR Reclamation and the Cachuma Operations and Maintenance Board propose to construct a redundant pipeli...
Click for More Information Tulare Irrigation District In-Basin Exchange with Consolidated Peoples Ditch Company and Farmers Ditch Company Reclamation proposes to approve a long-term exchange of up to 40,000 AF/y of Tulare Irrigation Distr...
Click for More Information Union Island Salinity Monitoring Station Reconstruction Environmental Assessment Reclamation proposes to repair the Union Island Salinity Monitoring Station by replacing the entire ...
Click for More Information Vista Verde 5-Year Transfer of Settlement Contract Water to Vista Verde-Owned Lands in Westland Water District Environmental Assessment Reclamation proposes to approve a series of temporary annual water transfers. Vista Verde would tra...
Click for More Information Westands Water District Storage and Return of CVP Water in Semitropic Water Storage District Westlands Water District (WWD) would bank up to 50,000 acre-feet of their 2008 allocated Central Val...
Click for More Information Wind Warning Light Upgrade at San Luis Reservoir State Recreation Area Environmental Assessment Reclamation proposes to retrofit four existing wind warning lights (WWL) and to install a new WWL at...