Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Lewiston Orchards Project 
 Water Data

Lewiston Orchards Project  -  Main Page

Project Water Supply

Normal

12.43 in  

Maximum  -  1971

15.44 in  

Minimum   -  1974

8.52 in  

Lewiston, Idaho 1961-1990

 

      Temperature

Mean Annual

52.3 °F  

Daily Maximum  -  08/04/1961

115 °F  

Daily Minimum   -  01/31/1950

-22 °F  

Lewiston, Idaho 1948-1996

 

Growing Season

213 days  

Elevation of irrigable area

1,000 - 1,700 ft  

      Sweetwater and Webb Creeks1

Drainage area at Lewiston

52 mi2  

Estimated average annual discharge:

16,500 acre-ft  

    1 No USGS gaging station is available on these creeks.

Project Water Quality

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links