Realty |
Office of Real Estate Services - Project Development Guide
Federal regulations for the property management function are found in 23 CFR Part 710D. These regulations prescribe FHWA policies and procedures for the management of real property acquired in connection with Federal-aid highway projects. These policies apply to all State and political subdivisions that manage real property acquired for any highway or highway related project in which Federal funds will participate in any part of the right-of-way costs of the project. The Federal Highway Administration's participation in property management is set out in 23 CFR Part 710.203(b)(4). The FHWA may participate in net costs incurred in leasing, rental, maintenance, disposal of improvements, protection, rodent control, and clearance of real property. Clearly the key is flexibility in managing or removing structures from the highway rights-of-way.
The acquiring agency responsible for property management must handle such activities in a manner consistent with Federal and State requirements. Its policies and procedures should be designed to reflect the maximum long range public benefit. Just as any privately operated property management firm, the acquiring agency is responsible for the preservation of improvements and for reasonable safety measures relative to the preservation of the acquired property and protection of lawful occupants when it has acquired ownership and possession of property. 12.1. PROPERTY MANAGEMENT DURING THE ACQUISITION PHASE There are several areas in which the property management section should be involved during the acquisition phase of the project, i.e., before the project is ready to be built. The most basic function of property management during this phase of a project is the clearance of the acquired right-of-way. This not only infers the vacation of structures, but also the removal of pests, and structures and other improvements (utilities, wells, etc.), and hazardous wastes, that are in the way of constructing the project. Clearance of the right-of-way may include "clearing and grubbing" which is the removal of all vegetation and the preparation for grading. The scope of property management during the acquisition phase of a project may vary from project to project and will be governed by State procedures and policies. 12.1.1. ACQUISITION PHASE PROJECT CLEARANCE CONTRACTS Disposing of acquired improvements under a clearing contract may be considered a right-of-way item when the clearing is performed separately from the contract for physical construction. On some projects, it will be more expedient to contract for right-of-way clearance separately from the construction contract because of the size of the project, the large number of improvements to be removed, and the length of time between the acquisition of the improvements and the beginning of construction of the project. Contracts for demolition that are billed as a right-of-way item are handled much the same as a construction contract. The major difference between billing as a right-of-way item and demolition as part of the construction contract is that if handled as a right-of-way item, the contract does not have to be authorized separately as does a construction contract. See Section 4 for contracting requirements. Additionally, such contracts must conform to the provisions of 49 CFR 18.36 as dictated by the FHWA Labor Compliance Manual for the requirement of wage determinations. 12.1.2. ACQUISITION PHASE INVENTORIES Planning for property management can begin with the receipt of appraisals of the property to be acquired or even earlier. An inventory of the property acquired for the project is required by Federal regulations, the format of which is an acquiring agency responsibility. Also, the inventory must be kept up-to-date. Procedures established to develop and maintain an inventory are essential to any effective property management program. Computer application in this area is recommended. 12.1.3. ACQUISITION PHASE RODENT CONTROL Rodent control is an area where early involvement by the acquiring agency can make an impact on the success or failure of the activity. Implementation of an effective plan should start not later than the relocation of the first occupant on the project. To be effective in controlling pests and rodents means that you must be ready to begin treatment as soon as the occupant vacates the structure. Before demolition or removal of acquired improvements is undertaken, rodent control measures must be initiated, if necessary. Rodent control measures are necessary if evidence exists of rodent infestation of the acquired improvements. The need for rodent control measures must be documented by periodic inspection of the improvements to determine if it is necessary to provide for rodent control. If the acquiring agency does not have the expertise to conduct a qualified inspection, a private firm or other State or local agency that is qualified to conduct such inspections should be used. Each inspection must be documented in the parcel's files. Rodent control measures should be coordinated with interested agencies such as State and local health agencies. If procedures call for staff personnel to do the job, the appropriate materials and know how to effectively utilize them must be on hand. Often, to be effective, treatment must go beyond the right-of-way limits. This requires working with adjacent property owners and the local jurisdiction to effectively control the rodents. Using contracts for rodent control is an appropriate property management expense. Contracts can be by parcel or project. When use of a contractor is anticipated, provision should be made prior to the first occupant leaving the project. For such a contract to be timely, advertising 3 to 4 weeks into the acquisition stage of the project may be necessary. Provisions for adding or deleting parcels to the contract may be necessary if it is a project contract or an area wide contract. If a project is large or a district is very active, another method of contracting for this service might be on an annual basis. Reimbursement provisions should be established ahead of time to provide for adding parcels or canceling the contract if performance is not satisfactory. The contract should contain equal opportunity provisions. The cost of doing the work, when necessary, should also have performance bonds to assure that the work is completed. Utilization of local government inspectors and health teams is another option. This may require an inter-agency agreement and involve reimbursement of costs to the agency providing the service. This option may be less expensive than hiring a contractor but less service may be available. 12.1.4. ACQUISITION PHASE IMPROVEMENT SECURITY
12.1.5. ACQUISITION PHASE RENTAL PROCESS
12.1.5.1. ACQUISITION PHASE ESTABLISHMENT OF RENTAL RATES Basically, there are two types of tenants who rent property acquired for highway purposes. The first type is the short term occupier and usually involves the renting back of the acquired property to the original occupant. The short term occupier is accommodated in Section 301(6) of the Act, as amended which states that the rent charged to the short term occupier shall not exceed fair rental value. In these cases, the rent will normally be less than the current fair market rent. The period of free occupancy and the rental rate to the short term occupier is negotiable. If the property is not needed for a few months before the construction bids are advertised, then it is normally advantageous to the agency to have the property occupied in order to prevent vandalism and to prevent an unsightly appearance of the community. Coordination with the appraisal section to determine the fair market rental amount to be charged may be necessary. A rent to be collected that is less than the fair market rent should be explained. Extended free occupancy or a reduced rent may be considered an administrative settlement which would require justification as described in Section 11.1 of this Guide. There may be political considerations, timing of the project, individual hardship and the like which may influence the free occupancy period and/or the amount of rent to be collected. There can however, be problems with relocation when property is rented back to the original occupant. The displaced occupants have a right to receive a relocation housing payment based on DSS housing at the time they are given notice to move. As a result, payments must be re-computed at the time of the notice to vacate. Sometimes a relocation problem is affected by the length of time the property is rented to the original occupant. It is usually preferable that the original occupant is expeditiously relocated after acquisition of the property. The second type of rental is to the subsequent long term occupant. These rentals should be based on the current fair market rental value. We suggest that the property manager inspect these properties at least annually and evaluate the FMV rent as the lease term dictates. Often this type of tenant occupies state owned property that was acquired far in advance of the actual construction date or is on projects that have been postponed or canceled. The current fair market rent to be charged to the long term occupant can be determined by an analysis of the rental rates on similar properties in the area. Coordination with the appraiser/review appraiser or relocation agent may be helpful because he or she may have sufficient data already available. As properties that are occupied by residential tenants are acquired for the project, the agent computes a rental assistance payment for them, thus developing useful rental information. Use of the multiple listing service, prior highway projects in the area and trends in the industry may also be helpful. 12.1.5.2. ACQUISITION PHASE TENANT SELECTION An important consideration concerning the rental process is the selection of the tenant. If you are dealing with the original occupant, there is little choice. However, should a short term occupier other than the original occupant lease the property, as much information as necessary to determine whether or not they have the ability and the character to abide by the terms of the lease should be obtained. When analyzing the available information on a tenant applicant, the property manager needs to be a good judge of people. Even though the rent may be nominal for the short term lease applicant, the agency receives a benefit by keeping the property occupied which is a protection for the acquired property. It is essential that any short term occupant understand the terms and conditions of the occupancy. 12.1.5.3. ACQUISITION PHASE LEASE AGREEMENTS
12.1.5.4. ACQUISITION PHASE MAINTENANCE AGREEMENTS Maintenance agreements are either contracts or written agreements between the owner of the property (in this instance the State or acquiring agency) and a person or firm who agrees to maintain the property. The scope of maintenance to be performed spans the entire spectrum of levels of maintenance. To a large extent, the level of maintenance will be based on four primary considerations:
There are four ways to maintain property:
12.1.5.5. ACQUISITION PHASE OWNER RETENTION One of the easiest methods of disposing of improvements located on lands necessary for highway purposes is through owner retention. In order for this to be a viable means of improvement removal, the property manager needs to know the number of potential improvements which can be moved on the project. To accomplish this, an inventory of these structures should be conducted based on information contained in the appraisal reports of the properties. Also the property manager should be knowledgeable of local codes and whether it is possible to move any of the inventoried improvements over public streets. If possible, then he or she should know which streets would be allowed to be used. The property manager should, early in the project, determine if there is or will be available remainder lands or other available lots which could be purchased for the placement of these structures. This is important since availability of lots may determine the feasibility of making the offer of retention to the owner. The acquisition agent and a property management agent need to communicate with each other to assure that the owner of improvements is made aware of his option for retaining improvements. The acquisition brochure may be one place where this information can be included for the benefit of the property owner. Owner retention may be for all the improvements on a parcel or it may be for only some of the improvements. When retention and movement of a structure is possible and is in the public interest, lower project costs should be expected when the owner retains the structure rather than if it is demolished. A good inventory will keep acquisition agents advised and knowledgeable. The inventory may also aid in determining a retention value, and assist in deciding when to make the retention offer. When it is known that the greatest return is from the sale of the entire improvement, it may be advantageous to offer the retention option early in the negotiations process. One thing the acquiring agent should always do is to advise or make sure that the owner is aware of what the State is acquiring (what the property owner is conveying to the State or acquiring agency) and that when possession is given to the acquiring agency, all items are expected to be turned over in as good condition as when the offer was made less normal wear and tear. Remember that the Uniform Act requires fairness to both the State and to the property owner. The basis for retention values should be documented in the parcel file as to where the retention values originated, i.e., public sale, sales by other agencies, private sales in the community, trade publications, etc. Owner retention can result in good public relations as an example of the acquiring agency's willingness to work with the owner and the community through which the highway is passing. It may also be an option which will assist in furthering an amicable settlement of the acquisition. A good computerized inventory of previous State salvage property sales will be a good starting place in determining the retention value to be offered. Close contact with the house moving industry or demolition industry will also provide information upon which the agency may make informed offers. 12.1.5.6. ACQUISITION PHASE SALE OF IMPROVEMENTS A second option for disposing of improvements is to hold a public sale or auction. The sale or auction should return to the government the greatest net proceeds and they should be open and competitive. The objective of an open and competitive public sale or auction is to provide the greatest net return to the government. Sales should be advertised as soon as it is known that the occupant will be vacating the premises. Advertisements should indicate that there may still be an occupant on the premises. The right to cancel should also be reserved if the occupant is still in occupancy. Coordination with relocation personnel and possibly the occupant should resolve any potential conflicts. If the expected advertisement date for the project allows adequate time for the sale and removal of improvements, coordination with project engineers or highway construction contract specifications personnel is advisable because the improvements to be sold and removed must then be eliminated from the clearing and grubbing contract improvement list or the portion of the construction contract which lists improvements to be removed by the contractor. It is also important to require a performance bond from the purchaser of the improvement to pay for removal should he or she fail to remove it from the project area. 12.1.5.7. ACQUISITION PHASE DEMOLITION The third option for disposition of improvements is through demolition. Demolition may be through either a demolition-only contract, or as an item in the roadway construction contract. If it is to be carried out as separate demolition contract, contract provisions and administration should be coordinated with the construction section to assure that necessary provisions are included, such as prevailing wage rate requirements (Davis-Bacon for Federal-aid projects), subcontracting limitations, and civil rights provisions. Finally, it is important to ensure that the appropriate owner and/or tenant vacation notices have been given and the contractor not be given notice to proceed until proper possession is secured. 12.2. POST-CONSTRUCTION PROPERTY MANAGEMENT Post construction property management is similar to pre-construction property management except that in this phase of the project the owning agency has the opportunity to function as a profit-making private enterprise. The highway right-of-way, or as it is generally known, highway airspace, is a capital asset which belongs to the taxpayers. The State or owning agency has a fiduciary responsibility to conserve and protect this asset, and to obtain the highest return possible for the taxpayers. There are many locations where the owning agency has land or airspace excess to the needs of the highway facility. The determination of property as excess is usually made by a combination of offices within the owning agency. Although the property management section is typically found within the right-of-way office and it coordinates the requests for disposal of excess lands, it is usually the engineering department that must make the determination as to its necessity to the highway facility. There are also legal and fiscal functions to be processed when excess land is disposed of. It will usually be a right-of-way responsibility to market highway airspace for utilization by the private sector. When resources are scarce and needs are greater, any activity which has the potential to generate revenue or income should be exploited to its fullest, while at the same time protected from the slightest chance of fraud, waste, abuse, or mismanagement. Property management is an area in right-of-way that has the potential to return some of the investment made by the taxpayer. 12.2.1. POST-CONSTRUCTION DISPOSALS In general terms, a disposal is the releasing of a previously acquired property interest which at the time of acquisition was needed for the maintenance, construction, or operation of the highway. A disposal of property may include excess property that is outside the finally developed right-of-way; excess surface areas outside the right-of-way; surface areas within existing right-of-way; and highway airspace beneath or above a highway structure or the area over a highway. Federal regulations require the disposal of properties purchased with Federal assistance, but not directly needed for program purposes, as soon as practical. Therefore, the acquiring agency must, to the extent it is able, predetermine in the project agreement which properties will become excess upon project completion and will require disposal. The STDs ROW operations manual should set forth the disposition processes being used. To obtain FHWA approval to dispose of highway right-of-way, the first step is to determine the project's status as it relates to acceptance of the project by FHWA. One way to determine the status of the project is to obtain the final construction inspection report by the engineers on the construction project and the date set by FHWA as to the completion of a right-of-way project. The request must include an explanation of why the right-of-way is no longer needed for highway purposes and the request must include a plan which identifies the right-of-way to be disposed of, including access control in relation to the construction features and the remaining right-of-way. It must be emphasized that the release of access control is a disposal of a property right and must be treated accordingly. The State should, as a part of its application to FHWA, indicate the status of the parcel of land as it relates to availability or desirability for parks, recreation, highway aesthetics and other environmental purposes. Disposals of small, low value remainders and uneconomic remnants sometimes cost more to dispose of than they are worth and retention of these parcels causes a property management problem. In April 1985, the FHWA issued a policy memorandum addressing the problems being encountered by States in disposing of these nuisance parcels. This policy says in part:
This policy promotes disposals and reduces the paper work involved. State property management procedures may include provisions for disposal of parcels up to $1,000 value lying outside the right-of-way with no credit to Federal funds and no FHWA participation in the costs of disposal. This policy applies only to property lying outside the right-of-way. The disposal of right-of-way generally requires concurrence by the FHWA and notification of intent to dispose of the right-of-way to other State agencies. See 23 CFR Part 620 and Part 710, Subpart D for Federal requirements when disposing of right-of-way. Federal involvement comes into play only when portions of the highway right-of-way are no longer needed for highway purposes. This includes changes in the control of access to the highway from adjacent properties which are not relinquishment situations, i.e., to another governmental agency for highway related purposes. FHWA approval is necessary for Interstate routes. The ROW operations manual and STD/FHWA stewardship agreement address the extent of other FHWA actions. Acquiring agencies shall charge current fair market value or rent for the use or disposal of real property interests, including access control, if those real property interests were purchased as a part of an FHWA-funded project. Since this property was acquired with public funding, the principle guiding disposal would normally be to sell the property at fair market value and use the funds for transportation purposes. The term fair market value as used for acquisition and disposal purposes is as defined by State statute and/or State court decisions. Exceptions to the general requirement for charging fair market value are set forth in 23 CFR 710.403(d). There are several ways to carry out this disposition at fair market value. For example, it could be disposed of at public sale based upon the appraised value; public auction or solicitation of bids utilizing several advertisements over a reasonable span of time and market area; or through good faith negotiations with a purchaser on the basis of current appraised fair market value. An appraisal will typically mean a before and after value appraisal of that which is being disposed, which will identify any increase in value caused by the disposal of rights-of-way. Parcels which were acquired as uneconomic remnants and incorporated into the right-of-way are treated, at the time of disposal, as any other right-of-way being disposed of in terms of FHWA approval and credit requirements. If the land was not incorporated into the right-of-way, FHWA approval to dispose of the property is not required. Any payment received for the disposal is to be used for other Title 23 U.S.C. eligible project expenses, as with other post-construction property management income. Setting access control lines that exclude potential excess parcels results in the elimination of the FHWA from the disposal process. 12.2.2. POST-CONSTRUCTION RELINQUISHMENTS
12.2.3.1. HIGHWAY AIRSPACE MARKETING The marketing of highway airspace is similar to the marketing of other commodities. Supply and demand are the economic factors controlling the feasibility of successfully marketing highway airspace. There are many questions that should be asked. Does a market exist which would potentially find the airspace desirable? When would the airspace be more effectively marketed, as spring, summer, or fall? Is the marketing of airspace to take place prior to or after its development? If it is going to be marketed prior to development, then marketing would normally be directed to developers and/or investors. If it will be marketed after it is developed, then marketing would most likely be to users. What will be the scope of airspace development? Will all uses be encouraged, limited only by Federal and/or State regulations or will the scope be limited to a particular use such as parking or storage? The scope may also be limited by outside influences such as zoning and or local land use ordinances. To what extent is private participation in the marketing of the airspace encouraged? Will private investors supply the funds to a private marketer to develop the advertising plan to lease the development to private users? The development of a model marketing plan, a model lease contract and a model sales contract to protect the State's interests is encouraged prior to actively initiating the marketing of the airspace. Advertising the airspace site or improvement is necessary for a successful marketing plan. When advertising the site or improvement, will there be an emphasis on advertising if the target market is the general public? Marketing techniques exist which aid in the successful leasing of highway airspace. The state-of-the-art marketing techniques applicable to highway airspace include but are not limited to:
12.2.3.2. HIGHWAY AIRSPACE DEVELOPMENT The development of highway airspace is no different from developing any other property except that the development will occur on public right-of-way. This exception adds a significant dimension to a development project since Federal and State regulations concerning highway facility safety, and certain dimensional and engineering limitations (height, width, clearances configuration, pier placement, etc.) need to be taken into account.
12.2.3.3. HIGHWAY AIRSPACE MANAGEMENT
12.2.4. MANAGEMENT OF JOINT DEVELOPMENT AND MULTIPLE USE HIGHWAY AIRSPACE The terms "joint development" and "multiple use" connotate the creative use of highway right-of-way to provide benefits to communities and to assist in blending highways into the environments they traverse. More specifically, joint development is a coordinated planning process carried on by highway agencies and other agencies or organizations, within the corridor of a proposed highway. Joint development is the coordinated multiple use (i.e. land uses and transportation systems) development of public transportation facilities. The development often involves a mixture of public funds with institutional/nonprofit funds and/or private sector investment. See Section 14.4 for more information on joint development and multiple use. 12.2.5. CONTROLLED ACCESS FACILITIES Controlled access facilities have special features which require an awarness of their operation and the additional rights acquired from adjacent property owners. These rights are what must be effectively managed to ensure the operational integrity of the facility. 12.2.5.1. NEW ACCESS POINTS Consider the following items when a new access point is proposed:
12.2.5.2. ACCESS CHANGES (INCLUDING ACCESS CONTROL LINE MOVE) All improvements on the right-of-way created by a modification of access control lines MUST be of value to the travelling public as opposed to the special interest or benefit to the person or persons proposing to alter the established access. When an access point is changed along a controlled access facility, or when the controlled access line is moved from one location to another, the following may apply:
Reasons such as the change will improve local economic conditions by providing more jobs, more services, maintain the local business environment, increase the tax base, provide low income housing, protect and preserve the environment, mitigate local or other state agency requirements in order to develop the property adjacent to the highway, etc. are not acceptable as meeting a highway purpose. Access control is a valuable PUBLIC asset and a movement of the access line and/or providing a new access point must be evaluated both in terms of (1) the effect upon the highway system (2) the effect upon the adjacent or nearby property (3) the perception of the highway facility to be gained by the public and others who use the highway facility. In terms of item 1 above, operational factors should be noted, future expansion or future modification of the highway facility or the unit to be placed thereon as well as alternatives to the use must be carefully scrutinized. Does the use restrict future use of the right-of-way for a highway purpose? In terms of item 2 above, the effect upon the adjacent or nearby property is usually the reason for the request for modification of the access control. Exposure to the traffic for its advertising value is a plus factor for business and might well be a negative factor for other persons living and/or working adjacent thereto. In terms of item 3 above, the granting of a new access or the movement of the access control line gives those using the highway facility and those who just observe it a different perspective. Landscaping, natural growth of trees, wetlands and the view from both on and off the highway may change. The change may be good or bad but it should be evaluated. Chapter 11 | Contents | Chapter 13
|