FY 2008 Request for Proposals for the Pollution Prevention Grant Program

RFP Supplement

Supplement to P2 Grant RFP - Q&As on the Requirement to Provide Estimates of Outcomes for Proposed Grant and Cooperative Agreement Projects and To Track Progress

Sponsoring Agency and Office: Environmental Protection Agency, Office of Prevention, Pesticides and Toxic Substances, Office of Pollution Prevention and Toxics

Funding Opportunity Title: FY 2008 Request for Proposals, Pollution Prevention Grant Program

Announcement Type: Initial Announcement for Fiscal Year 2008

Catalog of Federal Domestic Assistance (CFDA) Number: 66.708

Funding Opportunity Number: EPA-HQ-OPPT-08-006

Submission Date: Proposals must be received by Wednesday, April 16, 2008. Proposals received after this date will not be considered (Refer to Section IV for additional submission information).

OVERVIEW

The Pollution Prevention Grant Program supports State and Tribal technical assistance programs which help businesses identify better environmental strategies and solutions for reducing or eliminating waste at the source. EPA anticipates it will award approximately $4.1 million in total program funding during Fiscal Year (FY) 2008. Grants will be awarded and managed by each of EPA's ten Regional Pollution Prevention Program Offices. Grant amounts awarded are dependent on the Congressional appropriations for this program and the quality of proposals received.

Eligible Applicants: Eligible applicants include the 50 States, the District of Columbia, the U.S. Virgin Islands, the Commonwealth of Puerto Rico, any territory of or possession of the U.S., any agency or instrumentality of a State including State colleges or universities, Federally-recognized Tribes that meet the requirements for treatment in a manner similar to a State in 40 CFR 35.663, and Intertribal Consortia that meet the requirements in 40 CFR 35.504. Local governments, private universities, private nonprofit organizations, private businesses, and individuals are not eligible for funding.

This Request for Proposal includes the following information:

Section I. Funding Opportunity Description
Section II. Award Information
Section III. Eligibility Information
Section IV. Proposal Submission Information
Section V. Proposal Review Information
Section VI. Award Administration Information
Section VII. Agency Contacts

Attachment A Instructions for Grants.gov
Attachment B Sample Cover Page
Attachment C Guidance for Submitting Expected P2 Outcome Information
Attachment D Project Timeline Samples
Attachment E Sample Budget Detail Guidance and Example

FULL TEXT OF ANNOUNCEMENT

I. Funding Opportunity Description: EPA is announcing the availability of Pollution Prevention (P2) Grants. Under the authority of the Pollution Prevention Act of 1990 (PPA), EPA anticipates that approximately $4.1 million will be available to support P2 Grants to States, State entities, i.e., State agencies, State colleges or universities, Federally-recognized Tribes, and Intertribal Consortia in FY 2008 for prevention activities during FY 2008 - 2009. P2 Grant dollars are targeted at State and Tribal technical assistance programs that address the reduction or elimination of pollution by businesses across all environmental media: air, water and land.

A. Introduction: This announcement describes the process by which EPA will award the grants under the P2 Grant Program (Section 6605 of the PPA, Public Law 101-508, 42 U.S.C. 13104, 40 CFR 35.340; 35.660). Applicants should carefully read through this announcement as it provides important information on the requirements and goals of the program, the evaluation criteria used to review proposals, proposal submission requirements, and award selection.

B. Program History: Since its inception in 1989, the P2 Grant Program (previously named Pollution Prevention Incentives for the States - PPIS) has awarded over $94 million to States, State entities, Federally-recognized Tribes and Intertribal Consortia. EPA launched the P2 Grant Program with the philosophy that States and Tribes should play a primary role in encouraging and assisting industry, small and medium-sized businesses, local governments, and the public to shift priorities from pollution control to P2. Since States, State entities and Federally-recognized Tribes work directly with businesses and are more aware of the needs and problems that reside within their communities, they are well positioned to provide P2 technical assistance. As a result, State and Federally-recognized Tribal-based environmental programs play an important role in the national effort to promote the use of source reduction techniques by businesses.

EPA set the following goals at the outset of the program:

C. Grant Program Requirements: This section summarizes applicable grant policies
and requirements that apply to proposals submitted under this competitive announcement. Many of these requirements are also discussed in other sections of this announcement including Sections III, IV and V.

  1. Eligible Applicants: Section 6605 of the PPA and applicable parts of 40 CFR Part 35, Subparts A and B (40 CFR 35.340; 35.660) authorize EPA to award grants to States, State entities, i.e. any agency or instrumentality of a State including State colleges and universities, Federally-recognized Tribes and Intertribal Consortia for projects that promote the use of P2/source reduction techniques by businesses.

    More specifically, eligible applicants to compete under this announcement include the 50 States, the District of Columbia, the U.S. Virgin Islands, the Commonwealth of Puerto Rico, any territory of or possession of the U.S., any agency or instrumentality of a State, including State colleges/universities, and Federally-recognized Tribes and Intertribal Consortia that meet the requirements for treatment in a manner similar to a State in 40 CFR 35.663.

    Local governments, private universities, private nonprofit, private businesses, and individuals are not eligible for funding under this announcement.

  2. Definition of Pollution Prevention/Source Reduction: For purposes of this grant announcement, proposed project activities must meet the following definition of P2/source reduction in order to be eligible for funding:

    • Reduce the amount of any hazardous substance, pollutant, or contaminant entering any waste stream or otherwise released into the environment (including fugitive emissions) prior to recycling, treatment or disposal;
    • Reduce the hazards to public health and the environment associated with the release of such substances, pollutants, or contaminants; or
    • Reduce or eliminate the creation of pollutants through:
      • (i) increased efficiency in the use of raw materials, energy, water, or other resources; or
      • (ii) protection of natural resources by conservation.

    P2/source reduction does not include any practice which alters the physical, chemical, or biological characteristics or the volume of a hazardous substance, pollutant, or contaminant through a process or activity which itself is not integral to and necessary for the production of a product or the providing of a service (refer to PPA Section 6603 and 40 CFR Sections 35.343 and 35.662). Prevention includes what is commonly called "in-process recycling," but not "out-of-process recycling". Although recycling activities share many of the advantages of prevention (e.g., reducing the need for end-of-pipe treatment and promoting energy and resource conservation), they are a distinct and separate category of activity under EPA's Solid Waste Management Hierarchy and not eligible for funding. For more information on the Solid Waste Management Hierarchy, please go to http://www.epa.gov/epaoswer/non-hw/muncpl/faq.htm#1.

  3. Regulatory Criteria for P2 Grants: Proposals for grants under Section 6605 of the PPA and the applicable regulations in 40 CFR Part 35 Subparts A and B (refer to 40 CFR Sections 35.342 and 35.661) must address, and will be evaluated based on (See Section V for the complete list of evaluation factors that apply to proposals), whether they:
    • Make specific technical assistance available to businesses seeking information about source reduction opportunities, including funding for experts to provide on-site technical advice to businesses seeking assistance and to assist in the development of source reduction plans;
    • Target assistance to businesses for whom lack of information is an impediment to source reduction; and
    • Provide training in source reduction techniques.

    Examples of P2/source reduction projects or activities include: equipment or technology modifications, process or procedure modifications, reformulation or redesign of products, substitution of raw materials, and improvements in housekeeping, maintenance, training, or inventory control.

    For additional information about allowable grant activities, EPA provides a listing of past P2 grant summaries at http://www.epa.gov/p2/pubs/grants/ppis/ppis.htm.

  4. Programmatic Capability: Applicants are required to describe their ability to successfully complete and achieve the goals of the proposed project(s). To do so, the applicant must address these topics:

    • Experience Achieving Project Objectives: Describe how the applicant's organizational experience and resources support the successful completion of the proposed project. Also, describe if and how the applicant participates in the National Pollution Prevention Results Data System. The System collects P2 measures on a national basis and reflects the applicant's overall ability to measure and demonstrate P2 achievements. For more information visit: http://www.p2rx.org/services/measurement.cfm Exit EPA Disclaimer; and,
    • Staff Qualifications: Describe how the applicant's staff has the qualifications and knowledge to successfully accomplish the proposed project.

  5. Cost Sharing and Matching Requirements: P2 Grant recipients, as required under Section 6605 of the PPA, must provide at least a 50 percent match of the total allowable project cost by the time of award to be considered eligible to receive funding –the Federal government will provide half of the total allowable cost of the project and the recipient will provide the other half. Cost sharing and matching contributions may include dollars, in-kind goods and services (such as volunteered time, photocopying and printing services, etc.) and/or third party contributions consistent with 40 CFR 31.24. In the detailed budget, the use of the matching funds must be documented.

    Please note: Insular area applicants in the Commonwealth of Puerto Rico, the U.S. Virgin Islands, American Samoa, Guam and the Northern Mariana Islands are advised to contact the applicable Regional P2 contact in EPA Region 2 or 9 to determine if cost share requirements will be waived in all or in part, as authorized by the Omnibus Territories Act of 1977, as amended, 48 U.S.C. Section 1469a. Refer to Section VII to locate the applicable Regional P2 contact.

  6. Funding Period: EPA will reject proposals that include projects of more than three years.

  7. Alignment with EPA's Statutory Measurement Provisions and the Environmental Results Policy: To comply with the provisions of the PPA and EPA's Environmental Results Policy, grant applicants and recipients are required to estimate and report on the results of their project activities. As authorized under the PPA, (Section 6605 of the PPA, Public Law 101-508, 42 U.S.C. 13104) the Agency "shall establish appropriate means for measuring the effectiveness of the P2 Grant Program by promoting the use of source reduction techniques by businesses." In addition, EPA's Environmental Results Policy (EPA Policy Order No. 5700.7) requires applicants to provide qualitative and quantitative estimates of expected outcomes and outputs of project activities in their proposals and a plan for measuring and tracking their progress towards achieving the expected outputs and outcomes.
    1. P2 Outcome Measures: The term "outcome," as defined by the Agency, refers to the result, effect or consequence that will occur from carrying out an environmental program or activity that is related to an environmental or programmatic goal or objective. Outcomes may be environmental, behavioral, health-related or programmatic in nature, and must be quantified.

      Examples of outcome measures expected to be achieved under assistance agreements awarded through this announcement include, but are not limited to:

      • Pounds of hazardous materials reduced;
      • British Thermal Units (BTUs) of energy conserved;
      • Gallons of water saved; and,
      • Dollars saved through P2 efforts.

      Please Note: EPA may in the future require reporting of metric tons of carbon equivalent reduced in place of BTUs of energy conserved. In this event, further guidance on how to convert BTUs of energy to metric tons of carbon equivalent reduced will be provided by the Agency. In addition, further guidance on how to quantify additional sources of metric tons of carbon equivalent, beyond BTUs reduced, will be provided by the Agency.

    2. P2 Output Measures: The term "output," as defined by the Agency, refers to an environmental activity or effort and associated work product related to an environmental goal or objective that will be produced or provided over a period of time or by a specified date. Outputs may be quantitative or qualitative, but must be measurable during the assistance agreement funding period.

      Examples of output measures expected to be achieved under the assistance agreements awarded through this announcement include, but are not limited to:

      • Number of stakeholder groups involved in the process;
      • Number of assistance visits;
      • Number of workshops, trainings and courses conducted; and,
      • Number of fact sheets developed or distributed.
  8. Work Plan Measurement Elements: To ensure that an environmental measurement strategy is fully incorporated into the proposal, applicants will need to submit a Work Plan that includes the following elements (for a description of the applicant's Work Plan refer to Section IV.D.3.b):

    1. Numeric estimates of expected P2 results per project;
    2. A description of the relevant data collection methods (e.g., surveys, pre/post tests, participant reporting arrangements);
    3. A description of the equations, factors and assumptions used to calculate the estimated pollution prevention results;
    4. An itemized budget that reflects the resources needed to pay for measurement and reporting activities. In some cases this may require 10-20% of the proposed budget; and,
    5. A project timeline that includes data collection and evaluation activities supporting environmental outcome measures.
  9. Alignment with EPA's Strategic Plan: The EPA established a five-year Strategic Plan with long-term goals that project activities must commit to and work towards. The P2 program goals within the Agency's 2006-2011Strategic Plan are located in Goal 5: Objective 5.2: Improve Environmental Performance Through Pollution Prevention and Other Stewardship Practices, Sub-Objective 5.2.2: Promote Improved Environmental Performance Through Business and Community Innovation:
  10. "Through 2011, improve environmental performance with sustainable outcomes through sector-based approaches, performance-based programs, and assistance to small business."

    To realize its long-term P2 goal, the Strategic Plan established the following four Strategic Targets:

    To comply with the EPA's Strategic Plan, grant proposals must adhere to the environmental measurement requirements described in Section I.C.7. By reporting on the P2 outcome measures, the project activities will directly support one or more of the four Strategic Targets listed above.

    For more information on EPA's Strategic Plan for P2, go to http://www.epa.gov/ocfo/plan/2006/goal_5.pdf and scroll down to page 133 to Objective 5.2.2.

  11. Past Performance: Applicants are required to describe their past performance regarding grant management/performance and compliance with reporting requirements. To do so, the applicant must submit a list of Federally-funded agreements (assistance agreements include Federal grants and cooperative agreements, but not Federal contracts) similar in size, scope and relevance to the proposed project that they performed within the last three years (no more than 5 agreements, and preferably EPA agreements), and address the three items listed below for each such agreement.
  12. Please note: Applicants with no relevant or available past performance or reporting history will receive a neutral score for these factors in accordance with the evaluation process in Section V.

D. National Requirements of the FY 2008 P2 Grant Program: The national requirements provide broad overarching goals covering the ten EPA Regions. Under this grant program, pollution prevention is a critical tool used to address major national and regional environmental issues (e.g., climate change, the reduction of greenhouse gases, energy and water conservation, and renewable energy) to achieve environmental, social and economic benefits. The national program requirements below provide the framework for addressing these issues through P2 Grant activities.

Please note: Proposals must address all three national requirements (Refer also to Section III.A):

  1. Promote Multimedia Pollution Prevention: Applicants must explain how the project will encourage and assist source reduction to actively prevent pollution across environmental media: air, water and land. Projects must support P2 activities including, but not limited to:
    • Providing technical assistance and outreach activities to businesses;
    • Initiating activities that provide technical assistance to test and support innovative pollution prevention approaches and methodologies;
    • Identifying and addressing regulatory and non-regulatory barriers and incentives to P2; and/or
    • Developing P2 measures that assist businesses in determining their progress toward preventing pollution at the source.
  2. Commit to Working Towards State and Tribal P2 Program Goals: Applicants must commit to supporting the State or Tribal government strategic planning goals for P2. By developing proposals that support the environmental goals of the State or Tribal government, applicants can help ensure that States and Tribes achieve objectives through a cost-effective preventive approach. EPA would like to ensure that grant funds provide a service that supports the State's or Federally-recognized Tribe's strategic plan.
  3. Promote Partnerships: For the past 11 years, EPA has required P2 Grant applicants to identify major environmental assistance providers in their States and to work with these organizations to educate businesses on P2. EPA believes that applicants who develop strong relationships with other environmental assistance providers can greatly maximize their opportunity for securing State and Federal resources in the future by dedicating time to developing partnerships.

    EPA continues to seek more cooperation among applicants and environmental and business assistance providers at the State level. These can include university-based technical assistance and cooperative extension programs, and other assistance programs offered within the State. Partnerships are also encouraged within regional and national programs such as the Pollution Prevention Resource Exchange (P2Rx) Centers, EPA's Office of Enforcement and Compliance Assurance (OECA) Compliance Assistance Centers, EPA's Small Business Environmental Assistance Programs (SBEAPs), National Institute of Standards and Technology (NIST) programs, Department of Energy's (DOE) Industrial Assessment Centers, etc.

    By developing such partnerships applicants can leverage outside expertise. These partnerships also reduce the need for other environmental assistance providers to develop their own P2 expertise, which would otherwise result in duplication of effort. Applicants are thus strongly encouraged to establish partnerships with business and other environmental assistance providers to seamlessly deliver P2 assistance.

E. Regional EPA Priorities: The following Regional P2 priorities are provided to highlight specific environmental issues/projects/programs that are focal points within each EPA Regional P2 program. The priorities align with the three overarching national requirements provided above.

Please note: Applicants must submit proposals to the EPA Region where the project will take place (refer to Section IV) and those proposals must address at least one of the priorities for that region. For a list of the States and/or territories represented by each EPA Region, please refer to Section VII.

Region 1

Region 2

Region 3

Region 4

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

II. Award Information: The Agency anticipates that in FY 2008 approximately $4.1 million will be available for P2 Grants to eligible applicants (see Section III.A) for prevention activities during FY 2008-2009. As in previous years, individual grant awards are expected to be in the range of $20,000-$180,000. In total, EPA receives approximately 200 grant proposals and issues approximately 60 awards each year. Grant amounts awarded are dependent on the Congressional appropriations for this program and the quality of proposals received. EPA reserves the right to reject all proposals and issue no awards under this announcement, or issue fewer awards than anticipated. All awards must be consistent with the applicable EPA regulations and grant policies.

A. Partial Funding: In appropriate circumstances, EPA reserves the right to partially fund proposals/applications by funding discrete portions or phases of proposed projects. If EPA decides to partially fund a proposal/application, it will do so in a manner that does not prejudice any applicants or affect the basis upon which the proposal/application, or portion thereof, was evaluated and selected for award, and therefore maintains the integrity of the competition and selection process.

Please note: In order to be considered for partial funding, the applicant's Work Plan must have clearly delineated activities or phases that include separate budget estimates for each activity/phase of the project. The completed proposal package thus must include a budget that estimates the costs for labor (by labor category), fringe benefits, travel, equipment, supplies, contractors, and for other direct costs and indirect costs. The budget must itemize these costs under each task identified in the Work Plan as well as for the entire proposed project, and must identify the activities (and corresponding estimated costs) covered by the match of 50 percent or more of the total allowable project cost.

B. Funding Restrictions: P2 Grant funds may only be used for the purposes set forth in the grant agreement and must be consistent with the statutory authority (Section 6605 of the PPA, Public Law 101-508, 42 U.S.C. 13104, 40 CFR 35.340; 35.660) of the P2 Grant Program (refer to Section I). Grant funds may not be used for matching funds for other Federal grants, lobbying, or intervention in Federal regulatory or adjudicatory proceedings. In addition, Federal funds may not be used to sue the Federal government or any other government entity. All costs identified in the budget must conform to applicable Federal cost principles contained in OMB Circular A-87; A-122; and A-21, as appropriate. EPA will subtract proposed ineligible costs from the final approved budget if a grant is awarded.

C. Type of Assistance Instrument to be Awarded: The funding for selected proposals will be in the form of a grant or cooperative agreement awarded under the PPA, Section 6605. EPA will award cooperative agreements for those projects in which it expects to have substantial technical interaction with the recipient throughout the performance of the project. For such projects, EPA may review and approve project phases, review and approve proposed subgrants and contracts, collaborate with the recipient on the scope of work and mode of operation of the project, closely monitor the recipient's performance, approve any proposed changes to the Work Plan and/or budget, approve qualifications of key personnel, and review and comment on reports prepared under the assistance agreement.

D. Proper use of P2 Grant Funds: To ensure the proper use of grant funds, the following requirements must be followed:

III. Eligibility Information: Eligible applicants are identified in the paragraph below and must meet the threshold eligibility requirements described in Sections III.A and B below in order to receive funding consideration. States and Tribes that intend to include P2 grant funds in Performance Partnership Grants (PPGs) should read the Special Eligibility Requirements described in Section III.D.

Eligible applicants include the 50 States, the District of Columbia, the U.S. Virgin Islands, the Commonwealth of Puerto Rico, any territory of or possession of the U.S., any agency or instrumentality of a State including State colleges or universities, Federally-recognized Tribes that meet the requirements for treatment in a manner similar to a State in 40 CFR 35.663, and Intertribal Consortia that meet the requirements in 40 CFR 35.504. Local governments, private universities, private nonprofit organizations, private businesses, and individuals are not eligible for funding.

A. Threshold Program Requirements: Proposals from eligible applicants must demonstrate how they meet the Threshold Program Requirements identified below in order to receive funding consideration. Proposals that fail to meet all of these requirements will be rejected. Applicants deemed ineligible based on this section will be notified within 15 calendar days of the ineligibility decision:

B. Threshold Submission Requirements:

  1. Proposals must substantially comply with the proposal submission instructions and requirements set forth in Section IV of this announcement or else they will be rejected. However, where a page limit is expressed in Section IV with respect to the Narrative Proposal (9 pages), pages in excess of the page limitation will not be reviewed.
  2. In addition, proposals must be received by the EPA Regional contact or received through www.grants.gov, as specified in Section IV of this announcement, on or before the proposal submission deadline provided in Section IV.A of this announcement. Applicants are responsible for ensuring that their proposal reaches the designated person/office specified in Section VII of the announcement by the submission deadline.
  3. Proposals received after the submission deadline will be considered late and returned to the sender without further consideration, unless the applicant can clearly demonstrate that it was late due to EPA mishandling.

    Please note: For hard copy submissions only – where Section IV requires proposal receipt by a specific person/office by the submission deadline, receipt by the Agency mailroom is not sufficient. Applicants should confirm receipt of their proposal with the EPA Regional contact identified in Section VII as soon as possible after the submission deadline – failure to do so may result in your proposal not being reviewed.

C. Cost Sharing and Matching Requirements: P2 Grant recipients, as required under Section 6605 of the PPA, must provide at least a 50 percent match of the total allowable project cost by the time of award to be considered eligible to receive funding –the Federal government will provide half of the total allowable cost of the project and the recipient will provide the other half. Cost sharing and matching contributions may include dollars, in-kind goods and services (such as volunteered time, photocopying and printing services, etc.) and/or third party contributions consistent with 40 CFR 31.24. In the detailed budget, the use of the matching funds must be documented.

Please note: Insular area applicants in the Commonwealth of Puerto Rico, the U.S. Virgin Islands, American Samoa, Guam and the Northern Mariana Islands are advised to contact the applicable Regional P2 contact in EPA Region 2 or 9 to determine if cost share requirements will be waived in all or in part, as authorized by the Omnibus Territories Act of 1977, as amended, 48 U.S.C. Section 1469a. Refer to Section VII to locate the applicable Regional P2 contact.

D. Special Requirements for States and Tribes (with Performance Partnership Grants) and Insular Area Applicants: Due to their special status, applicants from States, Tribes and Insular Areas that intend to include P2 grant funds into a PPG should address the following requirements:

  1. P2 Grant Funds Included in State PPG: P2 Grant funds may be included in a PPG. State agencies that wish to include the funds from a competitive P2 Grant as part of their PPG must also include the Work Plan commitments of the P2 Grant in their PPG Work Plan. Refer to 40 CFR 35.138.
  2. Tribal Performance Partnership Grant: With respect to Tribal applicants, if a Tribe or Intertribal Consortium is selected for a P2 Grant and the Tribe includes the funds in a PPG awarded under 40 CFR Part 35, Subpart B, consultation with the Office of Pollution Prevention and Toxics is required if the Tribe proposes a PPG Work Plan that differs significantly from the P2 Work Plan selected for funding (refer to 40 CFR 35.535(b)). In addition, the required Tribal match for the P2 portion of the PPG will be reduced to 5 percent of the allowable P2 project cost for the first two years of the PPG grant.

    After the first two years in which a Tribe or Intertribal Consortium receives a PPG, the Regional Administrator must determine through objective assessment whether the Tribe or the members of an Intertribal Consortium meet socio‑economic indicators that demonstrate the ability of the Tribe or the Intertribal Consortium to provide a cost share greater than five percent. If the Regional Administrator determines that the Tribe or the members of Intertribal Consortium meet such indicators, then the Regional Administrator shall increase the required cost share up to a maximum of 10 percent of the allowable cost of the proposal budget for each program with a cost share greater than five percent.

    Further, the Regional Administrator may waive the cost share required for a PPG upon request of the Tribe or Intertribal Consortium, if, based on an objective assessment of socio‑economic indicators, the Regional Administrator determines that meeting the cost share would impose undue hardship (refer to 40 CFR 35.536(d)).

IV. Proposal Submission Information: The grant application process is a two-step process involving a grant proposal, followed by a full application package. First, applicants submit proposal packages that include a Cover Page, Narrative Proposal, SF 424 form, Letters of Support, and Key Contact information as described in more detail in Section D below – those proposals from eligible applicants that meet the threshold requirements described in Section III will then be evaluated based on the criteria in Section V. Second, eligible proposals that merit further consideration for funding, based on the evaluation criteria provided in Section V, will advance to the second step of the application process, and those applicants will be contacted by the applicable Regional P2 program office and asked to prepare and submit a full application. Only those applicants who are asked to complete a full application will be considered for an award. Full applications include additional Federal forms and documentation. A full application should not be submitted at this time. The following section describes how to submit a grant proposal, including submission dates, proposal submission methods, and proposal content. Applicants are advised to carefully read through these instructions.

A. Submission Date: Proposals must be received by Wednesday, April 16, 2008. Applicants must submit their proposals electronically through grants.gov or by hard copy to the appropriate Regional P2 program office as described below. EPA anticipates that final funding decisions will be made 180 days after the post date of this announcement.

B. Proposal Submission Methods: Applicants may choose to submit proposals in one of two ways. If applying with a hard copy submission, please follow the instructions under "Hard Copy Submission" (refer to Section IV.E below). If applying electronically via Grants.gov, please follow the appropriate instructions under "Electronic Submission" (refer to Section IV.F below). EPA encourages applicants to submit their proposal materials electronically through http://www.grants.gov. EPA will no longer consider proposals sent by e-mail.

C. Proposal Length and Format: Narrative Proposals as described in D.3 below must be no more than 9 single spaced pages (i.e., a page equals one side). Proposals longer than 9 pages will only be reviewed up to the page limit. Applicants must use no less than 11 point font on 8.5 x 11 inch paper. The SF 424 form, the cover page, Letters of Support, and key contacts information do not count toward the page limit requirement. Proposals must be readable in PDF, MS Word or Word Perfect WP6/7/8 for Windows in English.

D. Proposal Package Content: The grant proposal package consists of the following elements: Cover Page, Federal Assistance Form (SF-424), Narrative Proposal, Letters of Support, and Key Contact information. The page limit applies to the Narrative Proposal only.

  1. Cover Page: The Cover Page contains the following items:

    1. Grant Program title;
    2. Funding opportunity number of this announcement;
    3. Title of proposal;
    4. Short description of the proposal;
    5. The total funding amount of the project and the requested funding amount; and,
    6. The applicant's contact information (i.e., name of applicant, name of organization, mailing address, phone number, fax number, and e-mail address).

    Attachment B provides a sample cover page. The Cover Page does not count toward the page limit requirement.

  2. Application for Federal Assistance (SF-424): To download the form go to http://www.epa.gov/ogd/AppKit/form/SF424.pdf.(6 pp, 183K, About PDF) When filling out form SF-424, applicants are required to provide a Dun and Bradstreet (D&B) Data Universal Numbering System (DUNS) number. Applicants may obtain a DUNS number by calling the toll-free DUNS number request line at 1-866-705-5711. Alternatively, applicants may also request a DUNS number online by going to http://fedgov.dnb.com/webform Exit EPA Disclaimer and following the instructions for a grant.
  3. Narrative Proposal: The Narrative Proposal includes parts a and b below. The Narrative Proposal is subject to the proposal page limit described above.
    1. Project Narrative: The Project Narrative must address how the proposal meets the Threshold Program Requirements described in Section III.A, and must also include information addressing Programmatic Capability (Section I.C.4)and Past Performance requirements (Section I.C.10) in order to receive an evaluation score as described in Section V.
    2. Work Plan: The Work Plan addresses the strategy, environmental measures, financial aspects, and time frame of the proposed project(s) as described below:
      1. Project Strategy: Describe the following issues for the proposed project(s):

        1. The environmental and health issues(s) that the project addresses;
        2. The project's purpose and goals;
        3. The project's key tasks and deliverables;
        4. The project's use of partnerships; and,
        5. How the project addresses the three regulatory criteria described in Section I.C.3.
      2. Environmental Measures: The following measurement information must be provided to describe the environmental results of the proposed project(s):
        1. Applicants will need to provide qualitative and quantitative estimates of expected outcomes and outputs of project activities in their Work Plan. (Refer to I.C.7 for examples of outcomes and outputs);
        2. A description of the relevant data collection methods (e.g., surveys, pre/post tests, participant reporting arrangements);
        3. Numeric estimates of expected pollution prevention results per project;
        4. A description of the equations, factors and assumptions used to calculate the estimated pollution prevention results; and,
        5. A plan for tracking the applicants progress towards achieving the expected project outcomes and outputs (I.C.7).

        For proposals that include more than one project, the above measurement information must be provided for one or more of the proposed projects. Refer to Pre-proposal Assistance on Environmental Measurement (Section IV. I) for general guidance on measurement and to Attachment C for guidance on P2 outcome measurement and an acceptable format for providing estimates of environmental outcomes.

      3. Budget Detail: The budget must comply with the 50% Cost Sharing and Matching Requirements (Section I.C.5). The budget must also reflect the resources needed to pay for measurement and reporting activities. In some cases this may require 10- 20% of the proposed budget. For an example of a detailed budget, refer to Attachment E.
        1. Management Fees: When formulating a budget applicants may not include management fees or similar charges in excess of the direct costs and indirect costs at the rate approved by their audit agency, or at the rate provided for in the terms of the assistance agreement negotiated with EPA. The term "management fees or similar charges" refers to expenses added to the direct costs in order to accumulate and reserve funds for ongoing business expenses, unforeseen liabilities, or for other similar costs that are not allowable under EPA grants or cooperative agreements. Management fees or similar charges may not be used to improve or expand the project funded under the grant or cooperative agreement, except to the extent authorized as a direct cost of carrying out the Work Plan.
        2. Compensation for Consultants: The use of EPA financial assistance compensation for consultants is limited to the daily equivalent of the rate paid to Federal employees at the ES-IV level (see 40 CFR Sections 30.27 B (b) and 31.36 (j)).
      4. Project Timeline: A project timeline of no longer than three years (Section I.C.6) should reflect key project tasks and deliverables as well as the data collection activities that capture environmental results (Section I.C.7). For an example of a Project Timeline, refer to Attachment D.

        Please note: The applicant must also make sure the narrative proposal addresses all of the evaluation criteria identified in Section V to the extent they are not otherwise addressed above.

  4. Letters of Support: Please include Letters of Support as part of the grant proposal. Letters of Support do not count toward the page limit requirement.
  5. EPA Form 5700-54, Key Contacts Form: To download the form go to http://www.epa.gov/ogd/forms/word/5700-54.doc (1 pg, 28K). You are asked to identify the key personnel who will lead and fund the Work Plan. The form does not count toward the page limit requirement.

E. Hard Copy Submission: Applicants choosing to submit their proposal package by hard copy must send two complete copies of it to the appropriate Regional P2 program office listed in Section VII. EPA strongly recommends that applicants use overnight delivery service or courier service as regular mail may be subject to unforeseeable delays. Proposals received after the submission date as noted in Section IV.A will not be evaluated or considered for funding. Proposals must be prepared in accordance with Section IV.C and D.

For hard copy proposals only: Applicants are encouraged to e-mail their EPA Regional
P2 Coordinator (listed in Section VII) to notify them that a hard copy proposal has been submitted.

F. Electronic Submission: Applicants choosing to submit their proposal electronically must do so through http://www.grants.gov. Proposals must be prepared as described in Section IV.C and D.

The electronic submission of your proposal package must be made by an official
representative of your institution who is registered with Grants.gov and is authorized to sign applications for Federal assistance. For more information, go to http://www.grants.gov and click on "Get Registered" on the left-hand side of the web page and then "Authorized Organization Representative (AOR)." Note that the registration process may take a week or longer to complete. If your organization is not currently registered with Grants.gov, please encourage your office to designate an AOR and ask that individual to begin the registration process as soon as possible.

After the registration process is complete, your institution may begin the application
process to submit a P2 Grant proposal. Proposal materials submitted through grants.gov will be time/date stamped electronically.

To submit a proposal through Grants.gov, please refer to the instructions provided in
Attachment A. If you experience technical difficulties while applying electronically, please call 1-800-518-4726 or email at support@grants.gov or contact the regional employee listed in Section VII of this announcement.

G. Other Submission Requirements:

  1. Confidential Business Information: In accordance with 40 CFR 2.203, applicants may claim all or a portion of their proposal/application as confidential business information. EPA will evaluate confidentiality claims in accordance with 40 CFR Part 2. Applicants must clearly mark proposals/applications or portions thereof they claim as confidential. If no claim of confidentiality is made, EPA is not required to make the inquiry to the applicant otherwise required by 40 CFR 2.204(c)(2) prior to disclosure.
  2. Federal Requirements: If an applicant's proposal is preliminarily selected for potential Federal funding during the initial review process, the applicant will be contacted by the Regional P2 program and instructed to submit required application forms. All application forms must be filled out in their entirety, prior to being considered for an award (see 40 CFR 30.12 and 31.10). In addition, successful applicants will be required to certify that they have not been debarred or suspended from participation in Federal assistance awards in accordance with 2 CFR Part 108.
  3. Intergovernmental Review: This grant program is eligible for coverage under E.O. 12372, "Intergovernmental Review of Federal Programs" and 40 CFR Part 29. An applicant should consult the office or official designated as the single point of contact in his or her State for more information on the process the State requires to be followed in applying for assistance, if the State has selected the program for review. If the State has not selected the program for review or the State does not have a single point of contact, applicants must coordinate directly with affected State, area-wide, regional, and local entities. If the applicant does not know who their single point of contact is, they are advised to call the EPA Headquarters Grant Policy Information and Training Branch at 202-564-5325 or refer to the State Single Point of Contact web site at www.whitehouse.gov/omb/grants/spoc.html. Federally-recognized Tribal governments are not required to comply with this procedure.

H. Pre-proposal/Application Assistance and Proper Communication with Applicants: In accordance with EPA's Assistance Agreement Competition Policy (EPA Order 5700.5A1), EPA staff will not meet with individual applicants to discuss draft proposals, provide informal comments on draft proposals, or provide advice to applicants on how to respond to ranking criteria. Applicants are responsible for the contents of their proposals and applications. However, consistent with the provisions in the announcement, EPA will respond to questions from applicants regarding threshold eligibility criteria, administrative issues related to the submission of the proposal, and requests for clarification about the announcement.

I. Pre-proposal Assistance on Environmental Measurement: EPA has prepared a set of written questions and answers on environmental measurement to help applicants understand why preparing, documenting and reporting environmental measurement data (outcomes and outputs) is important to their work; what things to measure; how to measure; and how EPA will evaluate measurement work. The questions and answers may also be used to augment Attachment C - Guidance for Submitting Expected P2 Outcome Information.

Applicants are strongly encouraged to use the questions and answers as a resource when preparing their proposals. To view, please go to Q&As on the Requirement to Provide Estimates of Outcomes for Proposed Grant and Cooperative Agreement Projects and To Track Progress.

J. Consideration of an Applicant's Proposed Subawardees/Subgrantees and/or Contractors During the Evaluation Process: Section V of the announcement describes the evaluation criteria and evaluation process that will be used by EPA to make selections under this announcement. During this evaluation, except for those criteria that relate to the applicant's own qualifications (i.e., past performance and reporting history), the review panel will consider, as appropriate and relevant, the qualifications, expertise, and experience of:

  1. An applicant's named subawardees/subgrantees identified in the proposal/application if the applicant demonstrates in the proposal/application that if it receives an award that the subaward/subgrant will be properly awarded consistent with the applicable regulations in 40 CFR Parts 30 or 31. For example, applicants must not use subawards/subgrants to obtain commercial services or products from for profit firms or individual consultant; and
  2. An applicant's named contractor(s), including consultants, identified in the proposal/application if the applicant demonstrates in its proposal/application that the contractor(s) was selected in compliance with the competitive Procurement Standards in 40 CFR Part 30 or 40 CFR 31.36 as appropriate. For example, an applicant must demonstrate that it selected the contractor(s) competitively or that a proper non-competitive sole-source award consistent with the regulations will be made to the contractor(s), that efforts were made to provide small and disadvantaged businesses with opportunities to compete, and that some form of cost or price analysis was conducted. EPA may not accept sole source justifications for contracts for services or products that are otherwise readily available in the commercial marketplace.

    Please note: EPA will not consider the qualifications, experience, and expertise of named subawardees/subgrantees and/or named contractor(s) during the proposal/application evaluation process unless the applicant complies with these requirements.

V. Proposal Review Information: This section describes the process and criteria for evaluating proposals that pass the threshold eligibility reviews described in Section III. EPA will only evaluate proposals from eligible applicants that meet the Threshold Program Requirements and Submission Requirements in Sections III.A and B.

A. Evaluation Criteria: Proposals will be evaluated based on the criteria below. Proposals can receive a maximum score of 100 as stated below. Each criterion includes a cross-reference to the section of this announcement that is relevant to that criterion:

  1. Programmatic Capability and Past Performance [20 points]
    1. Programmatic Capability (Section I.C.4): Proposals will be evaluated based on the extent and quality to which the applicant clearly describes their organizational experience and resources to perform and support the successful completion of the proposed project(s). This includes their experience achieving project objectives, degree of participation in the National Pollution Prevention Results Data System (Section I.C.4.a) and staff qualifications (Section I.C.4.b.) [10 points]
    2. Past Performance (Section I.C.10): Proposals will be evaluated based on the factors described in Section I.C.10 including the extent and quality to which the applicant demonstrates it has successfully performed and managed Federally-funded assistance agreements (Federal grants and cooperative agreements and not contracts) of similar size, scope and relevance to the proposed project within the last three years and complied with reporting requirements under these agreement including submission of acceptable final technical reports. Also, EPA will evaluate the applicant's experience managing grants and cooperative agreements and meeting reporting requirements, as well as their past performance in reporting on expected results as identified in Section I.C.10. [10 points].

      Please note: In evaluating applicants under this factor, EPA will consider the information provided by the applicant and may also consider relevant information from other sources including agency files and prior/current grantors (e.g., to verify and/or supplement the information supplied by the applicant). Applicants with no relevant or available past performance reporting history will receive a neutral score for this factor [5 points].

  2. Work Plan [80 points]
    1. Project Strategy (Section I.C.3): When evaluating proposals, in accordance with the regulatory criteria for P2 Grants as described in 40 CFR 35.342 and 35.661, EPA will evaluate whether the proposal will: (a) Make specific technical assistance available to businesses seeking information about source reduction opportunities, including funding for experts to provide on-site technical advice to businesses seeking assistance in the development of source reduction plans; (b) Target assistance to businesses for whom lack of information is an impediment to source reduction; and (c) Provide training in source reduction techniques. Such training may be provided through local engineering schools or other appropriate means. EPA will also consider the extent to which the Work Plan describes the environmental and health issues(s) that the project addresses. [EPA will award 10 points for each sub factor, 30 points in total]
    2. Environmental Measures (Section I.C.7 and 8): The extent and quality to which the Work Plan presents numeric estimates of expected pollution prevention results (outcomes and outputs) and describes a pragmatic effort to collect, calculate, and report pollution prevention measures. Also to be evaluated will be the Applicants plan for tracking and measuring its progress towards achieving the expected project outputs and outcomes. [20 points]
    3. Budget Detail (Section I.C.8.d): The extent to which the detailed budget presents estimated costs for each budget object class, broken down by project and funding source. Reviewers will also evaluate the detailed budget based on the extent to which the costs are reasonable and necessary. Note that the detailed budget must comply with cost share requirements (Section I.C.5) and must indicate the cost of environmental measurement activities (Section I.C.7). [10 points]
    4. Project Timeline: The extent to which the project timeline reflects key
      project tasks and deliverables as well as the data collection and evaluation activities supporting environmental outcome measures (Section I.C.7.a). Project schedules can be no longer than three years (Section I.C.6). [10 points]
    5. Partnerships (Section I.D.3): The extent to which the Work Plan demonstrates an effective use of partnerships and, wherever possible, leverages other organizations' resources and expertise. Partners must provide Letters of Support from an official within the organization, specifying and confirming their specific contributions to the project. [10 points]

B. Review and Selection Process:

  1. Review Process: Eligible proposals will be reviewed by the an EPA Regional review panel based upon the evaluation criteria and scoring provided above. Each of the ten EPA Regional P2 program offices will convene their own review panel to evaluate proposals submitted to their region. Each Region will use evaluation forms drafted by their Region to document and record the results. The highest ranked proposals from each Region that merit further consideration will proceed to the next phase and be asked to submit a full application package. After the Region determines a proposal merits further consideration, the applicant will be contacted by the Region P2 program office and instructed to submit a full grant application package.
  2. Selection Process: The highest ranked proposals from each Region will be recommended for funding and a listing of those proposals will be sent to the appropriate Regional Division Director or Senior Executive Service (SES) equivalent for review and for determining which applicants to request completed full applications from. EPA anticipates that requests for application packages will be made by July 2008.
  3. Selection Official: Complete application packages will be selected for funding by the Regional Division Director (or SES equivalent) in the Regional P2 program office. In making the selection decisions, the Regional Division Director (or SES equivalent) will consider the evaluation rankings and may consider geographic diversity. Selections will receive final concurrence by the Pollution Prevention Division Director in EPA Headquarters. EPA anticipates that final funding decisions will made by October 2008.

VI. Award Administration Information:

A. Award Announcements: After complete application packages have been reviewed and evaluated, applicants will be notified by the Regional P2 program office regarding the outcome of their submittal, usually 60 – 90 days from the date of submission.

B. Dispute Resolution Process: Assistance agreement competition-related disputes will be resolved in accordance with the dispute resolution procedures published in 70 FR (Federal Register) 3629, 3630 (January 26, 2005) which can be found at http://www.epa.gov/ogd/competition/resolution.htm. Copies of these procedures may be requested by contacting the appropriate Regional P2 program office listed in Section VII.

C. Administrative Requirements:

  1. Award Management: Awards issued in FY 2008 will be managed by the appropriate Regional P2 program office.
  2. Quality Assurance and Quality Control (QA/QC): Certain quality assurance and/or quality control (QA/QC) and peer review requirements are applicable to the collection of environmental data. Environmental data are any measurements or information that describe environmental processes, location, or condition; ecological or health effects and consequences; or the performance of environmental technology. Environmental data also include information collected directly from measurements, produced from models, and obtained from other sources such as data bases or published literature. Regulations pertaining to QA/QC requirements can be found in 40 CFR Parts 30.54 and 31.45. Additional guidance can be found at http://www.epa.gov/quality/qa_docs.html#noeparqt.

    Applicants should allow sufficient time and resources for this process in their proposed projects. If your organization does not have a Quality Management System in place, one must be developed. A project-specific Quality Assurance Project Plan (QAPP) or functional equivalent must be submitted and approved by EPA. All projects will require a QAPP or functional equivalent.

    Applicants for the FY 2008 Pollution Prevention Grant Program are not required to submit a QAPP as part of the application package, but may be required at time of award. Each grant award will contain a condition establishing a deadline for the grantee to submit acceptable quality assurance documentation to EPA.

  3. Audits:Periodic audits should be made as part of the recipient's system of financial management and internal control to meet the terms and conditions of grants and other assistance agreements. In accordance with the provisions of OMB Circular No. A‑133, State agencies that receive less than $500,000 within the State's fiscal year shall have an audit made in accordance with Federal laws and regulations governing the programs in which they participate.
  4. Records: Financial records, including all documents to support entries on accounting records to substantiate charges to each assistance agreement, must be kept available to personnel authorized to examine EPA assistance agreement accounts. All records must be maintained for three years from the date of submission of the annual financial status report. If questions still remain, such as those posed as a result of an audit, related records should be retained until the matter is completely resolved.
  5. Computers: Recipients who use grant funds to purchase desktop computers, or notebook computers must specify that such equipment be an Electronic Product Environmental Assessment Tool (EPEAT)-registered product with a rating of "bronze" or better. Information about EPEAT-rated products can be found at http://www.epeat.net/ Exit EPA Disclaimer. This specification requirement is consistent with EPA's role in the Federal Electronics Challenge; see
    http://www.federalelectronicschallenge.net Exit EPA Disclaimer.
  6. Other Applicable Regulations: State and Tribal applicants and recipients of P2 Grants are subject to the uniform administrative requirements provided in 40 CFR Parts 31, 34 and 35. The requirements cover pre-award, post-award, after-the- grant procedures and instructions for dispute resolution.

VII. Agency Contacts: For further information, please contact the appropriate EPA Regional P2 Program Coordinator.

State

EPA REGIONAL P2 PROGRAM COORDINATOR

Region 1

CT, MA, ME, NH, RI, VT

Robert Guillemin - Pollution Prevention Coordinator
1 Congress Street Suite 1100 (SPP)
Boston, MA 02114-2023
Phone: 617-918-1814
E-mail: guillemin.robert@epa.gov
Website: http://www.epa.gov/region1/assistance/p2/index.html

Region 2

NJ, NY, PR, VI

Alex Peck - Pollution Prevention Coordinator
290 Broadway, 25th Floor (PSPMMB)
New York, NY 10007-1866
Phone: 212-637-3758
E-mail address: peck.alex@epa.gov
Website: http://www.epa.gov/region02/p2/grants.htm

Region 3


DC, DE, MD, PA, VA, WV

Evelyn Velazquez - Pollution Prevention Coordinator
1650 Arch Street (3EA40)
Philadelphia, PA 19103-2029
Phone: 215-814-5412
E-mail: velazquez.evelyn@epa.gov
Website: http://www.epa.gov/region03/p2/grants.htm

Region 4

AL, FL, GA, KY, MS, NC, SC, TN

Pamela Swingle - Pollution Prevention Coordinator
61 Forsyth Street SW
Atlanta, GA 30303
Phone: 404-562-8482
E-mail: swingle.pamela@epa.gov
Website: http://wrrc.p2pays.org/P2GrantInfo.asp Exit EPA Disclaimer

Region 5

IL, IN, OH, MI, MN, WI

Phil Kaplan - Pollution Prevention Coordinator
77 West Jackson Boulevard (DW-8J)
Chicago, IL 60604-3590
Phone: 312-353-4669
E-mail: kaplan.phil@epa.gov
Website: http://www.epa.gov/region5/p2/grants.htm

Region 6

AR, LA, NM, OK, TX

David Bond - Pollution Prevention Coordinator
1445 Ross Avenue, Suite 1200 (6EN-XP)
Dallas, TX 75202
Phone: 214-665-6431
E-mail: bond.david@epa.gov
Website: http://www.epa.gov/region06/6en/xp/enxp2d.htm

Region 7

IA, KS, MO, NE

Gary Schlicht - Pollution Prevention Coordinator
901 N. 15th Street (ARTD/SWPP)
Kansas City, KS 66101
Phone: 913- 551-7097
E-mail: schlicht.gary@epa.gov
Website: http://www.epa.gov/region07/economics/r7_grant_opportunities.htm

Region 8

CO, MT, ND, SD, UT, WY

Linda Walters - Pollution Prevention Coordinator
1595 Wynkoop Street Attn: 8P-P3T
Denver, CO 80202
Phone: 303-312-6385
E-mail: walters.linda@epa.gov
Website: http://www.epa.gov/region8/grants

Region 9

AZ, CA, HI, NV, AS, GU

Jessica Counts - Pollution Prevention Coordinator
75 Hawthorne Street (WST-7)
San Francisco, CA 94105
Phone: 415-972-3288
E-mail: counts.jessica@epa.gov
Website: http://yosemite.epa.gov/r9/fsfc.nsf/58cc78776e
5e186b8825641b006a9bd8/bf4b9209205dcd008825641
c001004d4!OpenDocument

Region 10

AK, ID, OR, WA

Carolyn Gangmark - Pollution Prevention Coordinator
1200 Sixth Avenue Suite 900 (OEA-095)
Seattle, WA 98101
Phone: 206-553-4072
E-mail: gangmark.carolyn@epa.gov
Website: http://yosemite.epa.gov/R10/homepage.nsf/79794e
f74873b5d48825650f006b2193/d7b3b0464224c1e88825
661a0074635e?OpenDocument

ATTACHMENT A

Instructions for Submitting a Proposal through Grants.gov

The electronic submission of your proposal must be made by an official representative of your institution who is registered with Grants.gov and is authorized to sign applications for Federal assistance. For more information, go to http://www.grants.gov and click on "Get Registered" on the left side of the page.

Note that the registration process may take a week or longer to complete. If your organization is not currently registered with Grants.gov, please encourage your office to designate an AOR and ask that individual to begin the registration process as soon as possible.

To begin the proposal process, go to http://www.grants.gov and click on the "Apply for Grants" tab on the left side of the page. Then click on "Apply Step 1: Download a Grant Application Package" to download the compatible Adobe viewer and obtain the application package.

To apply through grants.gov you must use Adobe Reader applications and download the compatible Adobe Reader version (Adobe Reader applications are available to download for free on the Grants.gov website. For more information on Adobe Reader, please visit the Help section on grants.gov at http://www.grants.gov/help/help.jsp or http://www.grants.gov/aboutgrants/program_status.jsp).

Once you have downloaded the viewer, you may retrieve the application package by entering the Funding Opportunity Number, EPA HQ-OPPT-08-006, or the CFDA number that applies to this announcement (CFDA 66.708), in the appropriate field.

You may also access the proposal package by clicking on the "Application" button at the top right of the synopsis page of this announcement. To find the synopsis page, go to http://www.grants.gov and click on the "Find Grant Opportunities" button on the left side of the page and then go to "Search Opportunities" and use the "Browse by Agency" feature to find EPA opportunities.

Proposal Submission Deadline: Your organization's AOR must submit your complete proposal electronically to EPA through Grants.gov (http://www.grants.gov) no later than Wednesday, April 16, 2008. Please submit all proposal materials as described below and in Section IV.D of the announcement.

Proposal Materials: The proposal package is described in Section IV.D of the announcement. Proposals must be prepared as stated in Section IV of the announcement and include the following documents:

  1. Cover Page
  2. Application for Federal Assistance (SF-424)
  3. Narrative Proposal
  4. Letters of Support
  5. EPA Form 5700-54, Key Contacts Form

If additional pages are needed for Key Contacts, attach these additional pages to the electronic application package by using the "Other Attachments Form" in the "Optional Documents" box.

Proposals must contain items 1-5 listed above. The Narrative Proposal cannot exceed 9 single spaced pages – excess pages will not be reviewed. Instructions on what to include for items 1-5 are provided in Section IV.D of the announcement.

Proposal Preparation and Submission Instructions: Documents 1 - 5 listed above must be submitted as part of the proposal package. Documents 2 and 5 will appear in the Mandatory Document Box as will the Project Narrative Attachment Form. This form will need to be created for each document. To create the form, follow the instructions below.

  1. The fields that must be completed will be highlighted in yellow.
  2. Optional fields and completed fields will be displayed in white.
  3. If you enter an invalid response or incomplete information in a field, you will receive an error message.
  4. When you have finished filling out each form, click "Save."
  5. When you return to the electronic Grant Application Package page, click on the form you just completed, and then click on the box that says, "Move Form to Submission List."
  6. This action will move the document over to the box that says, "Mandatory Completed Documents for Submission."

For documents 1, 3, and 4 you will also need to attach electronic files. To attach the electronic files follow the instructions below.

  1. First, prepare your Narrative Proposal as described in Section IV. D.3 of the announcement and save the documents to your computer as an MS Word or WordPerfect file. (EPA prefers to receive documents in MS Word, but documents prepared in WordPerfect will also be accepted).
  2. When you are ready to attach the Narrative Proposal to the application package, click on "Project Narrative Attachment Form," and open the form.
  3. Click "Add Mandatory Project Narrative File," and then attach your Narrative Proposal (previously saved to your computer) using the browse window that appears.
  4. You may then click "View Mandatory Project Narrative File" to view it.
  5. Enter a brief descriptive title of your project in the space beside "Mandatory Project Narrative File Filename;" the filename should be no more than 40 characters long.
  6. To attach the Cover Page and Letters of Support click "Add Optional Project Narrative File" and proceed as before. Prepare your Cover Page as described in Section IV.D.1 of the announcement.
  7. When you have finished attaching the necessary documents, click "Close Form."
  8. When you return to the "Grant Application Package" page, select the "Project Narrative Attachment Form" and click "Move Form to Submission List."
  9. The form should now appear in the box that says, "Mandatory Completed Documents for Submission."

Saving Your Work: When you have finished filling out all of the forms and have attached the necessary files, they should appear in one of the "Completed Documents for Submission" boxes. For each document click the "Save" button that appears at the top of the web page. It is recommended that you save the document a second time, using a different name, since this will make it easier to submit an amended package later if necessary. Please use the following format when saving your file: "Applicant Name – FY08 – Assoc Prog Supp – 1st Submission" or "Applicant Name – FY 08 Assoc Prog Supp – Back-up Submission."

If it becomes necessary to submit an amended proposal, then the name of the 2nd submission should be changed to "Applicant Name – FY08 Assoc Prog Supp – 2nd Submission."
Once your proposal package has been completed and saved, send it to your AOR for submission to U.S. EPA through Grants.gov. Please advise your AOR to close all other software programs before attempting to submit the proposal package through Grants.gov.

In the "Application Filing Name" box, your AOR should enter your organization's name (abbreviate where possible), the fiscal year (e.g., FY 08), and the grant category (e.g., Assoc Prog Supp). The filing name should not exceed 40 characters. From the "Grant Application Package" page, your AOR may submit the proposal package by clicking the "Submit" button that appears at the top of the page. The AOR will then be asked to verify the agency and funding opportunity number for which the application package is being submitted.

If problems are encountered during the submission process, the AOR should reboot his/her computer before trying to resubmit the proposal package. It may be necessary to turn off the computer (not just restart it) before attempting to resubmit the package. If the AOR continues to experience submission problems, he/she may contact Grants.gov for assistance by phone at 1-800-518-4726 or email at support@grants.gov or contact the regional P2 contact listed in Section VII of this announcement.

Proposal packages submitted through grants.gov will be time/date stamped electronically.

Confirmation of Your Submission: If you have not received a confirmation of receipt from EPA (not from grants.gov) within 30 days of the proposal deadline, please contact the Regional P2 contact listed in Section VII. Failure to do so may result in your proposal not being reviewed. Please Note: Applicants are strongly advised to send an e-mail notification to their EPA Regional contact noting that a P2 Grant proposal was submitted through Grants.gov.

Instructions for Submitting a Complete Application Package through Grants.gov: Proposals which merit further consideration based on the evaluation criteria described in Section V of the announcement will be asked by the applicable Regional P2 program office to submit a grant application package to complete the submission process. Only those applicants who are asked to complete an application package will be considered for an award. Applicants who are contacted by the Region will receive an e-mail containing the application deadline and applicable instructions for submitting a complete application package through Grants.gov. Only complete application packages will be considered for funding.


ATTACHMENT B

Sample Cover Page

[Grant Program Title] FY08 Pollution Prevention Grant Program
[Funding Opportunity Number] EPA-HQ-OPPT-08-006

[Proposal Title] NH DES Pollution Prevention Program

[Short Project Description – fewer than 300 characters]
The proposed project will provide on-site technical assistance to the marina sector, manage an Environmental Leadership Program for small businesses, and develop tools and workshops to assist manufacturers "green" their supply chain.

arrow

Please Note: To fulfill its public reporting responsibility, EPA plans to use this short project description on its Grant Awards Database web page: http://www.epa.gov/ogd/.

Total Project Funding: $160,000
Requested Funding: $80,000

Mary Thomas
NH DES Grants Office
New Hampshire DES
29 Hazen Drive, P.O. Box 123
Concord, NH 03302
Tel: 603-712-7754
Fax: 603-712-7763
Email: mary.thomas@state.nh.us
John Doe
Pollution Prevention Program
New Hampshire DES
29 Hazen Drive, P.O. Box 95
Concord, NH 03302
Fax: 603-712-7765
Tel: 603-712-7755
Email: john.doe@state.nh.us

g


ATTACHMENT C

Guidance for Submitting Expected P2 Outcome Information

Sections I.C.7 and 8 of this announcement describe why and how applicants must provide quantitative estimates of expected outcomes and outputs of project activities in their proposals. To assist applicants with P2 measurement requirements, Section I of this guidance provides a description of what to include in the grant proposal and provides a sample explanation of how to present the information. Section II provides background information describing P2 outcome categories, data collection methods and a procedure for calculating expected P2 outcomes.

I. Description of Expected P2 Measurement Information

To meet measurement requirements, the proposal should include at least one P2 project that results in numeric P2 outcomes within the project's timeframe. The proposal should include the following measurement elements (items A-D listed below) for each P2 project that is expected to be measured for numeric outcome results.

Measurement Elements:

A. Project Overview: A short list of project characteristics which include the project's 1) Title, 2) Outputs, 3) Behavioral Measures, 4) Partners, and 5) Target Sector.
B. Data Collection: A description of the relevant data collection methods (e.g., surveys, pre/post tests, participant reporting arrangements, etc.)
C. Expected P2 Outcomes: Numeric estimates of expected pollution prevention outcomes per project.
D. Calculation of Expected Outcome Results: A description of the equations, factors and assumptions used to calculate the estimated pollution prevention results.

What follows is a sample explanation of how to present the information for the measurement elements.

A. Project Overview: The Project Overview section provides a "snap shot" of the proposed project by providing brief responses in the following five areas: 1) Project Title; 2) Outputs; 3) Behavioral Measures; 4) Partners;and, 5) Sectors. A sample explanation is provided below.

  1. Project Title: Green Hotels Program;
  2. Outputs: The project will organize 5 three-hour workshops followed by on-site environmental audits and technical assistance for up to 10 participating facilities;
  3. Behavioral Measures: Number of workshop attendees that join the Green Hotel Program;
  4. Partners: State Hotel and Motel Association and the State Visitors and Tourist Bureau; and,
  5. Sectors: Hotel and hospitality businesses.

B. Data Collection: By writing a short description of the data collection method, applicants take a proactive approach towards measurement by selecting the most appropriate data collection tool(s) and thinking through the logistics of the measurement process. As described in Section II.A, Background Information for Expected P2 Outcomes below, data collection tools include surveys (mail, fax, email, Internet, and phone) and observed data (on-site revisits, pre/post tests, and reviews of self-reported data).

Please note: The steps to institute measurement (i.e., measurement planning, data collection, data analysis and reporting) should also be reflected in the Budget Detail and the Project Timeline. A sample explanation is provided below.

Data Collection Description: The data collection effort for the Green Hotel Project will begin with a pre/post survey conduct at each of the projects five workshops. The survey will assess the change in the level of environmental awareness of workshop participants and collect baseline facility information. P2 outcome measures will be collected as part of a voluntary program in which participating hotels will receive technical assistance from P2 staff and, in return, provide self-reported data for pounds of pollution prevented, energy and water conserved, and dollars saved.

C. Expected P2 Outcomes: The following table is a sample showing how to present expected P2 outcome information in an acceptable format. As illustrated in the table, the "Green Hotels Project" expects to yield numeric P2 outcomes from the listed "P2 Efforts." The number of "Pounds of Pollutants Reduced" is totaled in column (g). The underlying calculation for each expected outcome is described below in Section D, "Calculation of Expected Outcome Results."

Please note: Refer to Section II.B for definitions of the outcome categories, including pounds of pollution prevented, millions of BTU (mBTUs) conserved, gallons of water conserved, and dollars saved.

Table 1 Estimated P2 Outcomes for the Green Hotels Project

Pounds of Pollutants Reduced

Resources Conserved
and Dollars Saved

(a)
P2 Efforts

(b) Haz.
Waste

(c)
Air
Poll.

(d)
Waste
Water

(e)
In
Product

(f)
In
Process

(g)
Total Lbs

(h)

mBTUs

(i)

Gallons

(j)

Dollars

1) Water conservation

50,000

$6,844

2) Green cleaning

500

500

3) Organic lawn care

200

200

4) Efficient Lighting

170

Total:

500

200

700

170

50,000

$6,844

D. Calculation of Expected Outcome Results: Calculations of expected outcome results include the underlying assumptions, factors and logic used to calculate the expected P2 grant outcomes. The sample explanations that follow cover the first two P2 efforts listed in Table 1 above (i.e., water conservation and green cleaning).

  1. Water Conservation: Four workshops will reach an expected audience of 50 hotels. Of these, 5 hotels, representing approximately 500 bed spaces, are expected to adopt water efficiency practices within two years. A typical U.S. hotel uses 100 gallons of water per day per occupied room (water used for toilet, bathing, hygiene and laundry). Assuming a 50 percent occupancy rate, the 5 participating hotels use approximately 9,125,000 gallons of water per year. New water-efficient shower and faucet fixtures combined with an "Eco Linen" program are expected to result in a savings of 15 percent or 1,368,750 gallons conserved per year. With water and sewer rates at approximately $5.00 per 1,000 gallons, the estimated cost savings are $6,844.
  2. Green Cleaning: It is expected that a total of five hotels will provide self-reported data on the amount of green cleaning products that are converted to environmentally preferable cleaners. It is estimated that, on average, each hotel room requires the use of two pounds of cleaning products per year for a total annual usage of 1,000 pounds for 500 rooms. It is expected that the participating hotels will convert half of their cleaning products to green cleaners within two years. Furthermore, assuming 50% occupancy rate, it is expected that a shift to green cleaner will result in 250 pounds of in-product source reduction per year.

II. Background Information for Expected P2 Outcomes

The following three sections describe P2 outcome categories and data collection methods, and provide a process for calculating expected P2 outcomes.

A. Description of Data Collection Methods

Pre/Post-Test: Before conducting the pollution prevention assistance activity (e.g., workshops, training sessions), consider testing attendee knowledge of the subject you plan to cover. At the end of the assistance activity, retest the participants to determine changes in understanding of the materials presented. Similarly, you can assess behavioral practices at the facility before a workshop and practices reported in a follow-up survey to identify changes made. Pre/post-tests can also help you improve your pollution prevention assistance materials by revealing areas where key messages did not come across.

Telephone Survey: A telephone survey is a standard set of questions asked to potential respondents over the telephone. These surveys, used alone or in combination with mail or online surveys allow you to ask follow-up or clarifying questions, potentially resulting in better data than a mailed survey. Telephone surveys work best if the list of potential respondents is a manageable number (e.g., less than 50 respondents). To reduce costs, some regions have hired college students to make the call-backs.

Mail/Email/Fax Survey: A mail, email, or fax survey is a set of questions sent to potential respondents with a request that they voluntarily respond. These surveys enable you to reach a large number of potential respondents, and may be the best option where there are more than 50 recipients. However, mail/email/fax surveys can provide ambiguous results, since it is not easy to immediately follow up and clarify unclear, conflicting, or unexpected responses. Similarly, a limited level of detail is obtained, as respondents will generally not spend the time to write long answers to open-ended questions.

Online Survey: An online survey is a set of questions posted on a Web site or list server. These surveys have the potential to reach a large number of respondents. For surveys on Web sites, you can reach users that might otherwise be unknown to you. Many respondents like online surveys because they can respond at their convenience and they do not need to worry about losing a survey or mailing it back. As with mail surveys, however, the online survey may provide only limited detail as respondents might not want to spend time typing in a longer response. In addition, without follow-up, there is potential for ambiguity or conflicting results, as with the mail survey.

Please note: Pre/post-tests, telephone surveys, mail/email/fax surveys, and online surveys are exempt from the Paperwork Reduction Act (PRA) if administered under a grant agreement. However, the PRA is applicable if administered as part of a cooperative agreement with EPA.

On-site Revisit: Onsite revisits involve returning to facilities that previously received an assistance visit. Revisiting facilities can provide excellent data since you can use direct observation to make assessments and because facilities are likely to spend the necessary time to answer questions while you are on site. In addition, the revisit itself might spur additional compliance assistance or pollution prevention activities.

Self-Reported Data: Facilities may provide self-reported data that sheds light on their environmental performance. This could include in-house data such as energy and water bills, material and waste management receipts, permits, and Toxic Release Inventory (TRI) forms. Facilities may also supply source reduction information as part of a voluntary environmental program, such as an annual pollution prevention awards program, an ongoing environmental recognition program, or other voluntary partnerships.

B. Description of the P2 Outcome Categories

Applicants are encouraged to use the reporting format (refer to Table 1 above) for expected P2 outcome measures. As outlined below, the use of this format clearly identifies the key measurement categories that meet EPA's measurement and reporting needs.

P2 Efforts: Column (a) lists the source reduction activities that are expected to yield P2 outcome results. For grants with multiple projects, at least one project must be included. In the example listed above, a "Green Hotels Program" conducts four P2 activities that exhibit expected outcome measures.

Pounds of Pollutants Reduced: The five categories that comprise "Pounds of Pollutants Reduced" are described below. Column (g) sums the total pounds of pollutants prevented. Reductions are achieved through source reduction efforts, including in-process recycling. Measurements are expressed in pounds/year.

  1. Hazardous Waste [column (b)]: "Hazardous Waste" is defined to include state and/or federally listed hazardous or toxic wastes or wastes meeting the criteria for ignitability, toxicity, corrosiveness or reactivity.
  2. Air Pollutants. [column (c)]: "Air Pollutants" are defined to include the release of any of the following: Toxic air emissions (includes CAA 112b hazardous air pollutant (HAP), TRI, and others), nitrogen oxides, sulfur oxides, particulate matter (PM) and Volatile Organic Compounds (VOC's).
  3. Waste Water [column (d)]: "Waste Water" is defined to include biochemical oxygen demand (BOD), chemical oxygen demand (COD), toxics, nutrients, non-filterable total suspended solids (TSS), contaminants in storm water and pathogens discharged to sewer systems, septic systems, injection wells, and ground water. Pounds of waste water are calculated by estimating the quantity of contaminant rather than the quantity of water.
  4. In Product [column (e)]: "In Product Source Reduction" is defined as the pollutants prevented through modification in product design. This category helps capture reductions that are not typically represented as hazardous waste, air pollutants, or waste water. For example, latex paint is not disposed of as a hazardous waste, but "green" product design eliminates toxic ingredients, such as fungicides.
  5. In Process [column (f)]: "In Process Source Reduction" is defined as the pollutants prevented through the modification of a manufacturing or business process. This category helps capture reductions that are not typically represented as hazardous waste, air pollutants, or waste water. For example, the adoption of organic lawn care practices eliminates the use of pesticides – an outcome that can't be described as a reduction in hazardous waste, air pollutants, or waste water.

mBTUs: Column (h) lists the mBTUs reduced, conserved, or offset through source reduction efforts.

Gallons: Column (i) lists the reduction in gallons of incoming raw water from outside sources through the implementation of P2 activity. Reductions can occur for operations, facility use and grounds maintenance.

Dollars: Column (j) lists the financial savings in dollars derived from the outcome of implementing a P2 activity (including materials, labor, energy, machinery, administrative, waste management, or other process costs).

C. Calculation of Pollution Prevention Outcomes

The following steps can be followed to estimate expected pollution prevention outcomes.

  1. Establish a Baseline: Baseline performance information represents the current status of the target audience or sector and provides a frame of reference for measuring the success of the intended pollution prevention project. Baseline information can be expressed in terms of the amount of pollution generated over a period of time (e.g., pounds of pollution per year); the amount of material, products, water, and/or energy used over a given time (e.g., kW hours consumed per year); and amount of dollars spent over a given time (e.g., dollars spent per year). Baseline information can be established by: 1) using relevant databases, records, reports, and studies; 2) surveying the facility or target audience; and, 3) using pre-existing baseline information.

    Here are some examples:

    • A manufacturer generates about 4,000 gallons/month of oil wastewater from washing operations used to clean machined, metal parts for a cost of $0.40/gallon.
    • On average, hospitals use between 250 and 400 gallons of water per day per bed.
  2. Determine the Efficiency of the P2 Effort: Identify the expected source reduction benefit of the P2 practice, product or technology. This benefit should be expressed in terms of pollution reduced, energy saved, water conserved, and costs avoided. This efficiency factor should come from reliable sources or sound analysis.

    Here are some examples:

    • High-solid auto body paints reduce VOC emissions by up to 75%.
    • Manufacturing one ton of office paper with 100% recycled contents can save nearly 3,000 kilowatt hours when compared to the manufacture of virgin paper.
    • ENERGY STAR qualified transformer can save $100-300 each year at an electricity rate of $0.075 cents per kWh.
    • Ergonomic high volume, low pressure (HVLP) guns result in paint savings of up to 50 percent over conventional air spray guns, and savings of 35 percent over conventional HVLP guns.
    • Ultrafiltration (UF) membrane technology can reduce the volume of oily wastewater by at least 80% by separating out clean water from the oily solution.
  3. Estimate the Degree of Impact: Estimate the degree to which the P2 objectives will be implemented by the target audience. First, gauge the percentage of expected participation. Second, determine the degree to which participants will adopt P2 suggestions.

    Here are some examples:

    • If representatives from 30 marinas attend a workshop, 10 marinas are expected to implement suggested P2 practices within a two year period. Of these, half are expected to install a high-efficiency spray gun for painting operations.
    • Six of the ten facilities participating in an EMS user-group are expected to complete their EMS by the end of the year.
    • By identifying the target audience's performance baseline, the expected efficiency of the P2 Effort, and the degree of impact, you will have all the elements to estimate expected P2 outcomes.

Project Timeline Samples

The following sample of timelines offer different approaches for documenting a schedule of major project activities and milestones. Please note that timelines also need to account for measurement tasks, including 1) measurement planning, 2) data collection efforts, and 3) data analysis and reporting (refer to Section I.C.9).

Sample 1

Timeline for Multiple Projects

Project

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Greening the Government

X

X

X

X

X

X

X

X

X

X

X

X

Partnership Activities

X

   

X

   

X

   

X

   

Mercury Collection

   

X

   

X

   

X

   

X

Pollution Reduction
Measurement

 

X

 

X

 

X

 

X

 

X

   

X

Prepare Reports

         

X

         

X

Measurement

X

X

       

X

   

X

X

X

Sample 2

Milestone Table

Task by Objective   Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Objective 1
Task 1
Livestock Industry Assistance
Design and implement management plans

       
Objective 2
Task 1
Initiate P2 measurement strategy

                   
Objective 2
Task 2
Collect data from participants            

     
Objective 2
Task 2
Analyze data                  

 
Objective 3
Task 1
Present findings at national conference                      

Objective 4
Task 1
Prepare interim and final reports          

         

Sample 3

Activity Timeline

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Pre-workshop testing Workshop Post-workshop testing Analyze data          
      On-site technical assistance Collect and analyze data      
  Piloting to old companies       Piloting to new companies    
Measurement Planning             Data collection and analysis  
        Prepare progress report         Prepare Final Report

Sample 4

Interim Report
Summary of Deliverables and Activities

Task Timeline Status
General
a. Advisory Committee Conference Calls Monthly Ongoing
b. Progress Reports Quarterly Ongoing
Task 1: Education and Outreach
a. Develop Outreach Strategy October – November 2006 Completed

b. Develop & Disseminate Outreach Materials November – June 2007 Ongoing
c. Develop & Pilot Industry Mentoring Program November 2006 – December 2007 Ongoing
Task 2: On-Site Outreach
a. Conduct 10 onsite visits June 2007 – June 2008 Ongoing

b. Mail P2 suggestions July 2007 – August 2007 Ongoing
c. Conduct follow-up calls October 2007 – April 2008 Pending
d. Compile survey data and metrics October 2007 – August 2007 Pending
Task 3: Measurement and Reporting
a. Plan measurement strategy

October 2007

Completed

b. Mid-year report

March 15, 2008

Pending

c. Analyze Output and Outcome Measures

September – November 2008

Pending

b. Prepare Final Report

November – December 2008

Pending


ATTACHMENT E

Budget Detail Guidance and Example

Applicants must provide a detailed cost justification for the estimated budget amounts reflected in Section B of the SF-424A application form. The Budget Detail allows the EPA project officer to determine if the costs are reasonable and necessary. To comply with Cost Sharing and Matching Requirements, the itemized budget must indicate the project costs paid by the applicant, EPA, and/or other partners. A description of Object Class Categories and a sample budget has been provided below.

Description of Object Class Categories

Personnel: Indicate salaries and wages, by job title, of all individuals who will be supplemented with the grant funds.

Fringe Benefits: Indicate all mandated and voluntary benefits to be supplemented with the grant funds.

Travel: Indicate the number of individuals traveling, destination of travel, number of trips, and reason for travel.

Equipment: EPA regulation and policy define equipment as tangible, non-expendable personal property having a useful life of more than one year and an acquisition cost of $5,000 or more per unit (40 CFR 31.3). The figure of $5,000 would represent the total cost of the equipment purchase or of the lease). Note that not all funding programs allow for the purchase of equipment and some programs encourage leasing rather than purchasing equipment. If your project requires the purchase of equipment, you are encouraged to check with the Regional Pollution Prevention contact prior to submitting your proposal to ensure that the equipment purchases are allowable.

Supplies: Indicate any items, other than equipment, that will be purchased to support the project.

Contractual: Indicate any proposed contractual items that are reasonable and necessary to carry out the project's objectives.

Other: Indicate general (miscellaneous) expenses necessary to carry out the objectives stated in the workplan.

Total Direct Charges: Summary of all costs associated with each line item category.

Indirect Costs: Organization must provide documentation of a federally approved indirect cost rate (percentage) reflective of proposed project/grant period. Applicant should indicate if organization is in negotiations with appropriate federal agency to obtain a new rate.

Total amount of funds requested from EPA and total match: Add direct and indirect costs.

Total cost of project: Add the total amount requested from EPA and the total amount of funds provided as a match for an overall project cost.

Measurement: The category of "measurement" is not an Object Class Category; nonetheless, grant conditions require the inclusion of a short description of applicable measurement costs to complete the budget detail. A sample description has been included at the bottom of the following Example Budget.

Sample of Budget Detail

Line Item

Detailed Description

EPA Funds

Match Funds

Total

Personnel

Project Manager @ $15/hr x 40hrs/wk x12 weeks

Project Assistant @ $10/hr x 20hrs/wk x 12 weeks.

$7,200

$2,400
$9,600

$0


$0
$0

$9,600

Fringe Benefits

Health Insurance-
1 FTE @ $35/month x 12/months
Dental - 1 FTE @ $40/mo x 12/months

$420
$480
$900

$0
$0
$0

$900

Travel

Site Visit to XYZ Watershed
Local Travel Mileage - 1000 miles x $0.36

Meeting with project partners
Air Fare for 1 person to Denver

Per diem for 2 days @$40/day for 1 person

Hotel for 1 night for 1 person

$0

$250

$80

$75
$405

$360

$0

$0

$0
$360

$765

Equipment

 

$0

$0

$0

Supplies

100 pamphlets for community members @ $2 each

Computer equipment

$200

$0
$200

$0

$1000
$1,000

$1,200

Contractual

Training for 50 people @ $100 each

Water sample testing - 20 samples @ $75 each

$5,000

$0
$5,000

$0

$1,500
$1,500

$6,500

Other

Office needs (postage, phone, fax, etc.)

$150

$150

$300

Total Direct Charges

 

$16,255

$3,010

$19,265

Indirect Charges

10% of Personnel salary

$960

$0

$960

Grand Total

 

$17,215

$3,010

$20,225

Measurement: Expenditures to measure P2 outcomes include personnel costs of $500 to write and administer a survey and compile survey results. This includes time for the Project Manager ($15/hr x 20 hrs = $300) and the Project Assistant ($10/hr x 20hrs= $200).