[Federal Register: January 18, 2008 (Volume 73, Number 13)]
[Notices]               
[Page 3464]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18ja08-51]                         


[[Page 3464]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6695-1]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 01/07/2008 
through 01/11/2008. Pursuant to 40 CFR 1506.9.
EIS No. 20080008, Draft EIS, NPS, NY, Governors Island National 
Monument, General Management Plan, Implementation, New York Harbor, NY, 
Comment Period Ends: 03/18/2008, Contact: Christine Gobrial 215-597-
1572.
EIS No. 20080009, Final EIS, AFS, WY, Lower Valley Energy (LVE) Natural 
Gas Pipeline Project, Construction and Operation of a Pressurized 
Natural Gas Pipeline, Special-Use-Authorization, Big Piney and Jackson 
Ranger Districts, Bridger-Teton National Forest, Sublette and Teton 
Counties, WY, Wait Period Ends: 02/19/2008, Contact: Greg Clark 307-
276-3375.
EIS No. 20080010, Draft EIS, FHW, 00, US-231/I-10 Connector Project 
HPP-1602-(507), Proposal to Build Limited Access Facility from U.S. 231 
North of Dothan to the Alabama/Florida State Line, Dale, Houston, 
Geneva Counties, AL, Comment Period Ends: 03/03/2008, Contact: Mark D. 
Bartlett 334-223-7370.
EIS No. 20080011, Final EIS, FHW, AK, Knik Arm Crossing Project, To 
Provide Improved Access between the Municipality of Anchorage and 
Matanuska-Susitna Borough, AK, Wait Period Ends: 02/19/2008, Contact: 
Edrie Vinson 907-586-7464.
EIS No. 20080012, Final EIS, NAS, 00, Programmatic--Constellation 
Program, Develop the Flight Systems and Earth-based Ground 
Infrastructure for Future Missions, International Space Station, The 
Moon, Mars, and Beyond, Brevard and Volusia Counties, FL; Hancock 
County, MS; Orlean Parish, LA; Harris County, TX; Madison County, AL; 
Cuyahoga and Erie Counties, OH; Hampton, VA; Santa Clara County, CA; 
Dona Ana and Otero Counties, NM; and Box Elder and Davis Counties, UT, 
Wait Period Ends: 02/19/2008, Contact: Kathleen Callister 202-358-1953.
EIS No. 20080013, Draft EIS, AFS, NM, Santa Fe National Forest Project, 
Settlement Land Transfers: Pueblo de San lldefonso, Pueblo of Santa 
Clara and Los Alamos County, Implementation, Santa Fe National Forest, 
Los Alamos, Rio Arriba and Santa Fe Counties, NM, Comment Period Ends: 
03/03/2008, Contact: Sandy Hurlocked 505-753-7331.
EIS No. 20080014, Draft EIS, NPS, WA, San Juan Island National 
Historical Park, General Management Plan, Implementation, WA, Comment 
Period Ends: 03/17/2008, Contact: Cheryl Teaque 206-220-4112.
EIS No. 20080015, Draft EIS, BLM, WY, Westside Land Conveyance Project, 
Congressionally-Mandated Transfer of 16,500 Acres of Public Land to the 
Westside Irrigation District, Big Horn and Washakie Counties, WY, 
Comment Period Ends: 03/03/2008, Contact: Don Ogaard 307-347-5160. This 
document is available on the Internet at: http://www.blm.gov/wy/st/en/info/NEPA/wfodocs/westside.html
.

EIS No. 20080016, Draft EIS, FHW, ID, Three Cities River Crossing 
Project, New Roadway Crossing of the Boise River at the Juncture of the 
Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD), 
Ada County, ID, Comment Period Ends: 03/03/2008, Contact: Ross 
Blanchard 208-334-9180.
EIS No. 20080017, Final EIS, COE, CA, San Clemente Dam Seismic Safety 
Project, Increase Dam Safety to Meet Current Design Standards, Monterey 
County, CA, Wait Period Ends: 02/19/2008, Contact: Robert Smith 415-
503-6792.
EIS No. 20080018, Draft EIS, FHW, CA, Phase I--CA 11 Corridor Location 
and Route Adoption and Location Identification of the Otay Mesa East 
Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and 
Acquisition of Right-of-Way Permit, San Diego County, CA, Comment 
Period Ends: 03/03/2008, Contact: Cesar Perez 916-498-5065.
EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, 
Construction, Operation and Maintenance, and Decommissioning of a 
Electric Generation Facility, Barnstable, Nantucket and Duke County, MA 
and Washington County, RI, Comment Period Ends: 03/20/2008, Contact: 
Dr. Rodney E. Cluck 703-787-1087.
EIS No. 20080020, Final EIS, FRC, NY, Broadwater Liquefied Natural Gas 
(LNG) Project, Construction and Operation a Natural Gas Pipeline 
Facilities, (Docket Nos. CP06-54, et al.), Long Island Sound, NY, Wait 
Period Ends: 02/19/2008, Contact: Andy Black 1-866-208-3372.

Amended Notices

EIS No. 20070508, Draft EIS, AFS, 00, Wild and Scenic River Suitability 
Study for National Forest System Lands on the Ashley, Dixie, Fishlake, 
Manti-La Sal, Uinta and Wasatch-Cache National Forests in UT and 
Portion of National Forests extend into Colorado and Wyoming, several 
counties, UT, Montrose County, CO and Uinta County, WY, Wait Period 
Ends: 02/15/2008, Contact: Catherine Kahlow 435-783-4338. Revision of 
FR Notice Published 12/07/2007: Extending Comment Period from 01/22/
2008 to 02/15/2008.

    Dated: January 15, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-881 Filed 1-17-08; 8:45 am]

BILLING CODE 6560-50-P