[Federal Register: April 18, 2008 (Volume 73, Number 76)]
[Notices]               
[Page 21124-21125]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18ap08-49]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6697-9]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed 04/07/2008 
through 04/11/2008 pursuant to 40 CFR 1506.9.
EIS No. 20080133, Draft EIS, NPS, TX, Guadalupe Mountains National 
Park, General Management Plan, Implementation, Culberson and Hudspeth 
Counties, TX, Comment Period Ends: 06/09/2008, Contact: Roxanne Runkel 
303-969-2377.

[[Page 21125]]

EIS No. 20080134, Draft EIS, NPS, MI, Sleeping Bear Dunes National 
Lakeshore, General Management Plan and Wilderness Study, 
Implementation, Benzie and Leelanau Counties, MI, Comment Period Ends: 
06/02/2008, Contact: Nick Chevance 402-661-1844.
EIS No. 20080135, Draft EIS, COE, TN, PROGRAMMATIC--Hydropower 
Rehabilitations, Dissolved Oxygen and Minimum Flow Regimes at Wolf 
Creek Dam, Kentucky and Center Hill and Dale Hollow Dams, Tennessee, 
Implementation, Comment Period Ends: 06/03/2008, Contact: Chip Hall 
615-736-7666.
EIS No. 20080136, Draft EIS, BIA, CA, Ione Band of Miwok Indians 
Project, Proposed 228.04 Acre Fee-to-Trust Land Transfer and Casino 
Project, Amador County, CA, Comment Period Ends: 07/02/2008, Contact: 
John Rydzik 916-978-6042.
EIS No. 20080137, Draft EIS, AFS, OR, East Maury Fuels and Vegetation 
Management Project, Proposed Fuels and Vegetation Treatments Reduce the 
Risk of Stand Loss, Lookout Mountain Ranger District, Ochoco National 
Forest, Crook County, OR , Comment Period Ends: 06/02/2008, Contact: 
Barb Fontaine 541-416-6500.
EIS No. 20080138, Final EIS, NOA, 00, Reef Fish Amendment 30A: Greater 
Amberjack--Revise Rebuilding Plan, Accountability Measures: Gray 
Triggerfish-Establish Rebuilding Plan, End Overfishing, Accountability 
Measures, Regional Management, Management Thresholds and Benchmarks, 
Gulf of Mexico, Wait Period Ends: 05/19/2008, Contact: Roy E. Crabtree 
727-824-5305.
EIS No. 20080139, Draft EIS, FHW, MN, Trunk Highway 23 and U.S. Highway 
71 Project, Construction of One or More Grade-Separated Bridge 
Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN, 
Comment Period Ends: 06/02/2008, Contact: Lowell Flaten 320-214-6367.
EIS No. 20080140, Final EIS, DOI, UT, Lower Duchesne River Wetlands 
Mitigation Project (LDWP), Restoration Measures in the Lower Duchesne 
River Area, Strawberry Aqueduct and Collection System (SACS) on portion 
of the Strawberry Reservoir, Implementation, Ute Indian Tribe, NPDES 
and U.S. Army COE Section 404 Permits, Duchesne, Utah, Uintah Counties, 
UT , Wait Period Ends: 05/19/2008, Contact: Ralph G.Swanson 801-379-
1254.
EIS No. 20080141, Final EIS, TVA, TN, Rutherford-Williamson-Davidson 
Power Supply Improvement Project, Proposes to Construct and Operate a 
New 500-kilovolt (kV) Rutherford Substation, a New 27-mile 500-kV 
Transmission Line and Two New 9- and 15-mile 161-kV Transmission Lines, 
Rutherford, Williamson and Maury Counties, TN, Wait Period Ends: 05/19/
2008, Contact: Anita E. Masters 423-751-8697.
EIS No. 20080142, Final EIS, COE, CA, Carryover Storage and San Vicente 
Dam Raise Project, Providing Additional Storage Capacity for 100,000 
area feet of Water by the Year 2011, Issuance of Permits, Section 10 
and 404 Permits, San Diego County, CA, Wait Period Ends: 05/19/2008, 
Contact: Robert R. Smith 858-674-6784.
EIS No. 20080143, Second Draft Supplement, COE, MA, Boston Harbor 
Federal Deep Draft Navigation Improvement Project, To Evaluate the 
Feasibility of Channel Deepening and Related Berth Improvements at the 
Port of Boston, Chelsea and Revere, Boston, MA, Comment Period Ends: 
06/02/2008, Contact: Catherine Rogers 978-318-8231.
EIS No. 20080144, Draft EIS, CGD, FL, Port Dolphin LLC Liquefied 
Natural Gas Deepwater Port License Application, Proposes to Own, 
Construct and Operate a Deepwater Port, Outer Continental Shelf, 
Manatee County, FL, Comment Period Ends: 06/02/2008, Contact: Raymond 
Martin 202-372-1449.
EIS No. 20080145, Final EIS, FRC, 00, Rockies Express Pipeline Project 
(REX-East), Construction and Operation of Natural Gas Pipeline 
Facilities, WY, NE, MO, IL, IN and OH, Wait Period Ends: 05/19/2008, 
Contact: Andy Black 1-866-208-3372.
EIS No. 20080146, Final EIS, NOA, 00, Amendment 2 to the Consolidated 
Atlantic Highly Migratory Species Fishery Management Plan, To Implement 
Management Measures that Prevent Overfishing and Rebuild Overfished 
Stocks, Implementation, Exclusive Economic Zone (EEZ) of the Atlantic 
Ocean, Gulf of Mexico and Caribbean Sea, Wait Period Ends: 05/19/2008, 
Contact: Margo Schulze-Haugen 301-713-2347.

Amended Notices

EIS No. 20080004, Draft EIS, NSA, 00, PROGRAMMATIC--EIS--Complex 
Transformation, To Make the U.S. Nuclear Weapon Complex Smaller, and 
more Responsive, Efficient and Secure in Order to Meet National 
Security Requirements, CA, NV, NM, SC, TN and TX, Comment Period Ends: 
4/30/2008, Contact: Theodore A. Wyka 1-800-832-0885 Ext 63519. Revision 
of FR Notice Published 01/11/2008: Extending Comment Period from 04/09/
2008 to 04/30/2008.
EIS No. 20080021, Draft EIS, SFW, AK, Yukon Flats National Wildlife 
Refuge Project, Proposed Federal and Public Land Exchange, Right-of-Way 
Grant, Anchorage, AK, Comment Period Ends: 05/19/2008, Contact: Cyndie 
Wolfe 907-786-3463. Revision of FR Notice Published 01/25/2008: 
Reopening Comment Period from 03/25/2008 to 05/19/2008.
EIS No. 20080088, Final EIS, FHW, MT, Miller Creek Road Project, To 
Provide Safe and Improved Access between U.S. 93 and the Miller Creek 
Area, Missoula County, MT, Wait Period Ends: 05/01/2008, Contact: Craig 
Genzlinger 406-449-5302 Ext 240. Revision to FR Notice Published 03/14/
2008: Extending Comment Period from 04/14/2008 to 05/1/2008.

    Dated: April 15, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-8397 Filed 4-17-08; 8:45 am]