[Federal Register: November 9, 2006 (Volume 71, Number 217)]
[Notices]               
[Page 65812-65813]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09no06-99]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6680-9]

 
Environmental Impacts Statements; Notice of Availability

AGENCY: Office of Federal Activities, General Information (202) 564-
7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed 10/30/2006 
through 11/03/2006 pursuant to 40 CFR 1506.9
EIS No. 20060452, Draft EIS, AFS, WA, Natapoc Ridge Restoration 
Project, To Improve Forest Health and Sustainability, and Reduce 
Wildfire and Hazardous Fuels, Wenatchee River Ranger District, 
Okanogan-Wenatchee National Forest, Chelan County, WA, Comment Period 
Ends: 12/26/2006, Contact: Steve Willet 509-548-6977.
EIS No. 20060453, Final EIS, FHW, CA, Willits Freeway Bypass Project, 
Construction and Operation of a New Segment of U.S. 101, COE Section 
404 Permit, NPDES Permit and Endangered Species Act (Incidental Take 
Permit), City of Willits, Mendocino County, CA, Wait Period Ends: 12/
11/2006, Contact: Maiser Khaled 916-498-5020.
EIS No. 20060454, Final EIS, SFW, CA, Orange County Southern Subregion 
Habitat Conservation Plan (HCP), Implementation, Application for and 
Incidental Take Permit, Orange County, CA, Wait Period Ends: 12/11/
2006, Contact: Vicki Campbell 916-414-6464.
EIS No. 20060455, Draft EIS, WPA, AZ, San Luis Rio Colorado Project, 
Construct, Operate, Maintain, and Connect a Double-Circuited 500,000-
volt Electric Transmission Line, Right-of-Way Grant and Presidential 
Permit, (DOE/EIS-0395) Yuma County, AZ, Comment Period Ends: 12/26/
2006, Contact: Mark J. Wieringa 720-962-7263.
EIS No. 20060456, Final EIS, IBR, CA, Contra Costa Water District 
Alternative Intake Project, To Protect and Improve the Quality of Water 
Delivery to Untreated and Treated-Water Customers, Contra Costra 
County, CA, Wait Period Ends: 12/11/2006, Contact: Katrina Chow 916-
978-5067.
EIS No. 20060457, Draft EIS, COE, TX, Brazos Harbor Navigation District 
Project, Proposed Port Freeport Channel Widening to the Entrance and 
Jetty Reach of the Freeport Harbor Jetty Channel and Entrance, Brazoria 
County, TX, Comment Period Ends:

[[Page 65813]]

01/09/2007, Contact: Sam Watson 409-766-3946.
EIS No. 20060458, Final EIS, AFS, 00, Custer National Forest Weed 
Management, To Implement Specific Invasive Weed Treatments, Carbon, 
Stillwater, Sweetgrass, Park, Powder River, Rosebud and Carter 
Counties, MT and Harding County, SD, Wait Period Ends: 12/11/2006, 
Contact: Kim Reid 406-657-6205 Ext 233.
EIS No. 20060459, Final EIS, NPS, SD, Badlands National Park/North Unit 
General Management Plan, Implementation, Jackson, Pennington and 
Shananon Counties, SD, Wait Period Ends: 12/11/2006, Contact: Paige 
Baker 605-433-5281.
EIS No. 20060460, Third Draft Supplement, FHW, VT, Southern Connector/
Champlain Parkway Project (MEGC-M5000(1), Updated Information, 
Construction from Interchange of I-189 to Shelburne Street (US Route &) 
and Extending westerly and northerly to the City of Center District 
within the City of Burlington, Chittenden County, VT, Comment Period 
Ends: 12/29/2006, Contact: Kenneth R. Sikora, 802-828-4423.
EIS No. 20060461, Draft EIS, USN, FL, Boca Chica Field, Restoration of 
Clear Zones and Stormwater Drainage Systems, Implementation, Naval Air 
Station (NAS) Key West, Monroe County, FL, Comment Period Ends: 01/08/
2007, Contact: Agnes Peters 703-604-5421.
EIS No. 20060462, Draft EIS, COE, CA, Cajon Third Main Track, 
Construction from Summit to Keenbrook, Special Use Permit and U.S. Army 
COE 404 Permit, San Bernardino County, CA, Comment Period Ends: 01/03/
2007, Contact: Susan Meyer 808-438-2137.
EIS No. 20060463, Final EIS, CGD, TX, Beacon Port Deepwater Port 
License Application, Construction and Operation, Deepwater Port and 
Offshore Pipeline, U.S. COE Section 404 and 10 Permits, Gulf of Mexico, 
San Patricio County, TX, Wait Period Ends: 12/11/2006, Contact: Ray 
Martin 202-372-1449.
EIS No. 20060464, Draft Supplement, AFS, MT, Northeast Yaak Project, 
Additional Documentation of Cumulative Effects Analysis, Proposed 
Harvest to Reduce Fuels in Old Growth, Implementation, Kootena National 
Forest, Three Rivers Ranger District, Lincoln County, MT, Comment 
Period Ends: 12/26/2006, Contact: Eric Dickinson 406-295-4693.
EIS No. 20060465, Draft EIS, FRC, 00, Rockies Express Western Phase 
Project, Construction and Operation for the Natural Gas Pipeline 
Facilities: Rockies Express (CP06-354-000), TransColorado (CP06-401-
000) and Overthrust (CP06-423-000), CO, WY, NE, KS, MO and NM, Comment 
Period Ends: 12/28/2006, Contact: Bryan Lee 1-866-208-3372.

Amended Notices

EIS No. 20060390, Final EIS, FHW, PA, Southern Beltway Transportation 
Project, Improvement from US-22 in Robinson Township to Interstate 79 
in South Fayette Township and Cecil Township, Funding and U.S. Army COE 
Section 404 Permit, Washington, Allegheny Counties, PA, Wait Period 
Ends: 11/09/2006, Contact: Karyn E. Vandervoort 717-221-2276. Revision 
of FR Notice Published 09/29/2006: Correction to Wait Period from 10/
30/2006 to 11/09/2006.

    Dated: November 6, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-19026 Filed 11-8-06; 8:45 am]

BILLING CODE 6560-50-P