[Federal Register: August 4, 2006 (Volume 71, Number 150)]
[Notices]
[Page 44280-44281]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04au06-60]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[Docket No. ER-FRL-6677-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www. epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/24/2006 through 07/28/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060314, Final EIS, SFW, CA, Bair Island Restoration and
Management Plan, Tidal Action Restoration, Don Edwards San Francisco
Bay National Wildlife Refuge, Bair Island State Ecological Reserve,
South San Francisco Bay, San Mateo County, CA, Wait Period Ends: 09/04/
2006, Contact: Clyde Morris 510-792-0222.
EIS No. 20060315, Draft EIS, AFS, CA, Antelope-Pardee 500kV
Transmission Project, Construct, Operate and Maintain a New 25.6 mile
500kV Transmission Line, Right-of-Way Permit and Special Use
Authorization, Angeles National Forest, Los Angeles County, CA, Comment
Period Ends: 09/18/2006, Contact: Marian Kadota 805-961-5732.
EIS No. 20060316, Draft EIS, GSA, ME, Madawaska Border Station Project,
Replacement of Existing Border Station in Madawaska, International
Border between United States and Canada, Aroostook County, ME, Comment
Period Ends: 09/22/2006, Contact: David M. Drevinsky 617-565-6596.
EIS No. 20060317, Draft EIS, FHW, NY, NY Route 347 Safety and Mobility
Improvement Project, from Northern State Parkway to NY Route 25A,
Funding, Towns of Smithtown, Islip and Brookhaven, Suffolk County, NY,
Comment Period Ends: 09/18/2006, Contact Robert Arnold 518-431-4127.
EIS No. 20060318, Draft EIS, FHW, NY, Greenville Southwest Bypass
Study, Transportation Improvements to NC 11 and U.S. 264 Business, U.S.
Army COE Section 404 Permit, Pitt County, NY, Comment Period Ends: 09/
18/2006, Contact: John F. Sullivan, III 919-856-4346.
EIS No. 20060319, Final EIS, NPS, AR, Pea Ridge National Military Park
General Management Plan, Implementation, AR, Wait Period Ends: 09/04/
2006, Contact: John Scott 479-451-8122 Ext 224.
EIS No. 20060320, Final EIS, NRC, IL, Early Site Permit (ESP) at the
Exelon
[[Page 44281]]
ESP Site, Application for ESP on One Additional Nuclear Unit, within
the Clinton Power Station (CPS), NUREG-1815, DeWitt County, IL, Wait
Period Ends: 09/04/2006, Contact: Thomas Kenyon 301-415-1120.
EIS No. 20060321, Draft EIS, AFS, CA, Diamond Vegetation Management
Project, To Shift Existing Conditions Towards Desired Future
Conditions, MT. Hough Ranger District, Plumas National Forest, Plumas
County, CA, Comment Period Ends: 09/18/2006, Contact: Merri Carol
Martens 530-283-7689.
EIS No. 20060322, Final EIS, BLM/AFS, CO, Northern San Juan Basin Coal
Bed Methane Project, Proposal to Drill 300 Wells to Produce National
Gas from Coal Beds on Federal, State and Private Owned Lands, Special-
Use-Permit, Application for Permit to Drill and US Army COE Section 404
Permit, LaPlata and Archuleta Counties, CO, Wait Period Ends: 09/04/
2006, Contact: Walt Brown 970-385-1372.
The Department of the Interior's Bureau of Land Management and the
U.S. Department of Agriculture's Forest Service are Joint Lead Agencies
for the above project.
EIS No. 20060323, Draft EIS, AFS, AK, Scratchings Timber Sale Project,
Timber Harvest up to Approximately 42 Million Board Feet, Suemez
Island, Craig Ranger District, Tongass National Forest, AK, Comment
Period Ends: 09/18/2006, Contact: Dennis Sylvia 907-828-3226.
EIS No. 20060324, Draft EIS, AFS, MT, Cabin Gulch Vegetation Treatment
Project, Restore Fire-Adapted Ecosystems, Reduce Hazardous Fuels, and
Water Quality Tributaries to Deep Creek, Helena National Forest,
Townsend Ranger District, Broadwater County, MT, Comment Period Ends:
09/18/2006, Contact: Sharon Scott 406-449-5490.
EIS No. 20060325, Draft EIS, FRC, ID, Hells Canyon Hydroelectric
Project, Application for Relicensing to Authorize the Continued
Operation of Hydroelectric Project, Snake River, Washington and Adams
Counties, ID and Wallowa and Baker Counties, OR, Comment Period Ends:
10/02/2006, Contact: Todd Sedmak 1-866-208-FERC.
Amended Notices
EIS No. 200600122, Draft EIS, BIA, WA, Cowlitz Indian Tribe Trust
Acquisition and Casino Project, Take 151.87 Acres into Federal Trust
and Issuing of Reservation Proclamation, and Approving the Gaming
Development and Management Contact, Clack County, WA, Comment Period
Ends: 08/25/2006, Contact: Gerald Henrickson 503-231-6927.
Revision of FR Notice Published on 04/14/2006: Comment Period
Officially Reopened by Preparing Agency--Comment Period ends 8/25/2006.
EIS No. 20060195, Draft EIS, CGD, MA, -VOID-Northeast Gateway Deepwater
Port License Application, Construct, Own and Operate a Deepwater Port
to Import Liquefied Natural Gas (LNG) in Massachusetts Bay, City of
Gloucester, MA, Comment Period Ends: 07/03/2006, Contact: Mark Prescott
202-267-0225.
Revision of FR Notice Published 05/19/2006: The above DEIS was
inadvertently published in 05/19/2006. The Official Filing was
Published in FR on 05/26/2006 CEQ20060213.
EIS No. 20060221, Draft EIS, CGD, MA, -VOID-Neptune Liquefied Natural
Gas Deepwater Port License Application, Proposes to Construct, Own and
Operate a Deepwater Port, northeast of Boston and south-southeast of
Gloucester, MA, Comment Period Ends: 07/17/2006, Contact: M.A. Prescott
202-372-1451.
Revision of FR Notice Published 06/02/2006: The above DEIS was
inadvertently published in 06/02/2006. The Official Filing was
Published in FR on 06/09/2006 CEQ20060235.
EIS No. 20060253, Draft EIS, AFS, NV, Jarbidge Ranger District
Rangeland Management Project, Authorize Continued Livestock Grazing,
Humboldt-Toiyabe National Forest, Columbia River, NV, Comment Period
Ends: 08/21/2006, Contact: James Winfrey 775-778-6129.
Revision of FR Notice Published on 06/23/2006: Extending Comment
Period from 08/07/2006 to 08/21/2006.
EIS No. 20060266, Draft EIS, FTA, TX, North Corridor Fixed Guideway
Project, Propose Transit Improvements from University of Houston (UH)-
Downtown Station to Northline Mall, Harris County, TX, Comment Period
Ends: 08/17/2006, Contact: John Sweek 817-978-0550.
Revision to FR Notice Published 07/03/2006: Correction to Agency
Code from DOT to FTA.
EIS No. 20060313, Draft EIS, BIA, MT, Kerr Hydroelectric Project,
Proposed Drought Management Plan, Implementation, Flathead Lake, MT,
Comment Period Ends: 09/29/2006, Contact: Jeffery Loman 202-208-7373.
Revision of FR Notice Published on 07/28/2006: Correction to
Comment Period from 09/11/2006 to 09/29/2006.
Dated: August 1, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 06-6715 Filed 8-3-06; 8:45 am]
BILLING CODE 6650-50-U