File Name |
Date |
Description |
in79036 |
12/31/1979 |
Computer Code Defect in Stress Analysis of
Piping Elbow |
in79035 |
12/31/1979 |
Control of Maintenance and Essential
Equipment |
in79037 |
12/28/1979 |
Cracking in Low Pressure Turbine Discs |
in79034 |
12/27/1979 |
Inadequate Design of Safety-Related Heat
Exchangers |
in79033 |
12/21/1979 |
Improper Closure of Primary Containment
Access Hatches |
in79032 |
12/18/1979 |
Separation of Electrical Cables for HPCI and
ADS |
in79031 |
12/11/1979 |
Use of Incorrect Amplified Response Spectra
(ARS) |
in79030 |
12/04/1979 |
Reporting of Defects and Noncompliance, 10
CFR Part 21 |
in79029 |
11/16/1979 |
Loss of Nonsafety-Related Reactor Coolant
System Instrumentation During Operation |
in79028 |
11/16/1979 |
Overloading of Structural Elements Due to
Pipe Support Loads |
in79027 |
11/16/1979 |
Steam Generator Tube Ruptures at Two PWR
Facilities |
in79012a |
11/08/1979 |
Attempted Damage to New Fuel Assemblies |
in79026 |
11/01/1979 |
Breach of Containment Integrity |
in79025 |
09/28/1979 |
Reactor Trips at Turkey Point Units 3 and 4 |
in79023 |
09/25/1979 |
Emergency Diesel Generator Lube Oil
Coolers |
in79024 |
09/23/1979 |
Overpressurization of Containment of a PWR
Plant after a Main Steam Line Break |
in79022 |
09/14/1979 |
Qualification of Control Systems |
in79021 |
09/05/1979 |
Transportation and Commercial Burial of
Radioactive Materials |
in79020r1 |
09/01/1979 |
NRC Enforcement Policy - NRC Licensed
Individuals |
in79020 |
08/10/1979 |
NRC Enforcement Policy - NRC Licensed
Individuals |
in79019 |
07/17/1979 |
Pipe Cracks in Stagnant Borated Water
Systems at PWR Plants |
in79018 |
07/05/1979 |
Skylab Reentry |
in79017 |
06/18/1979 |
Source Holder Assembly Damage from Misfit
between Assembly and Reactor Upper Grid
Plate |
in79016 |
06/15/1979 |
Nuclear Incident at Three Mile Island |
in79015 |
06/07/1979 |
Deficient Procedures - |
in79014 |
06/04/1979 |
Safety Classification of Electrical Cable
Support Systems |
in79013 |
05/29/1979 |
Indication of Low Water Level in the Oyster
Creek Reactor |
in79012 |
05/10/1979 |
Attempted Damage to New Fuel Assemblies |
in79011 |
05/04/1979 |
Lower Reactor Vessel Head Insulation
Support Problem |
in79010 |
04/11/1979 |
Nonconforming Pipe Support Struts |
in79009 |
03/30/1979 |
Spill of Radioactively Contaminated Resin |
in79008 |
03/28/1979 |
Interconnection of Contaminated Systems
with Service Air Systems Used as the Source
of Breathing Air |
in79007 |
03/23/1979 |
Rupture of Radwaste Tanks |
in79006 |
03/22/1979 |
Stress Analysis of Safety-Related Piping |
in79005 |
03/16/1979 |
Use of Improper Materials in Safety-Related
Components |
in79004 |
02/14/1979 |
Degradation of Engineered Safety Features |
in79003 |
02/06/1979 |
Limitorque Valve Geared Limit Switch
Lubricant |
in79002 |
02/02/1979 |
Attempted Extortion - Low Enriched Uranium |
in79001 |
01/31/1979 |
Bergen-Paterson Hydraulic Shock and Sway
Arrestor |