[Federal Register: October 31, 2007 (Volume 72, Number 210)]
[Notices]               
[Page 61632]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31oc07-57]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 271-107]

 
Entergy Arkansas, Inc.; Notice of Application for Non-Project Use 
of Project Lands and Soliciting Comments, Motions To Intervene, and 
Protests

October 24, 2007.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No.: 271-107.
    c. Date Filed: October 11, 2007.
    d. Applicant: Entergy Arkansas, Inc.
    e. Name of Project: Carpenter-Remmel Project.
    f. Location: On the Quachita River, in Hot Springs and Garland 
Counties, Arkansas. The project occupies 34.3 of U.S. Army Corps of 
Engineer lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Blake Hogue, Hydro Operations, Entergy 
Arkansas, Inc., 141 West County Line Road, Alvern, AR 72104, (501) 844-
2197.
    i. FERC Contact: Any questions on this notice should be addressed 
to Gina Krump, Telephone (202) 502-6704, and e-mail: 
Gina.Krump@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protest: 
November 26, 2007.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: Entergy Arkansas, Inc. (Entergy) is 
seeking Commission approval to issue a permit to K&S Development 
Company for the construction of seven docks, totaling 28 slips and up 
to 500 feet of riprap along the shoreline within the Kelly Creek area 
of Lake Hamilton. The proposed facilities would serve the residents of 
a condominium development (Lakeside Gardens) located outside the 
project boundary. Minimal excavation and ground disturbance is 
proposed. All proposed work is consistent with Entergy's shoreline 
management plan and permitting guidelines.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov using the 

``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 

be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 

also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filings must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, 
and the Project Number of the particular application to which the 
filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at http://www.ferc.gov 

under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-21387 Filed 10-30-07; 8:45 am]

BILLING CODE 6717-01-P