[Federal Register: November 2, 2007 (Volume 72, Number 212)]
[Notices]               
[Page 62229-62230]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02no07-44]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6692-5]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

    Weekly receipt of Environmental Impact Statements.
    Filed 10/22/2007 through 10/26/2007.
    Pursuant to 40 CFR 1506.9.
EIS No. 20070452, Draft EIS, BLM, CO, Canyons of the Ancients National 
Monument Resource Management Plan, To Address Future Management Options 
for Approximately 165.00 Acres of Land, Dolores and Montezuma Counties, 
CO, Comment Period Ends: 01/25/2008, Contact: Heather Muselow 970-882-
5600.
EIS No. 20070453, Draft EIS, BLM, UT, Monticello Field Office Resource 
Management Plan, To Guide the Management of Public Land, Southern two-
third of San Juan County and small portion on the Northern boundary 
within Grand County, UT, Comment Period Ends: 01/30/2008, Contact: Gary 
Torres 435-587-1524.
EIS No. 20070454, Draft EIS, BIA, WY, Riverton Dome coal Bed Natural 
Gas (CBNG) and Conventional Gas Development Project, Construction of 
Well Pads, Roads, Pipelines, and Production Facilities, Wind River 
Indian Reservation (WEIR), Fremont Count, WY, Comment Period Ends: 01/
02/2008, Contact: Ray Nation 307-332-3718.
EIS No. 20070455, Draft EIS, SFW, CA, Coyote Spring Investment Multi 
species Conservation Plan, Issuing a 40-year Incidental Take Permit for 
Five Species, Clark and Lincoln Counties, CA, Comment Period Ends: 01/
02/2008, Contact: Mary Grim 916-414-6464.
EIS No. 20070456, Final EIS, DOE, PA, Gilbert on Coal-to-Clean Fuels 
and Power Project, Construction and Operation a New Demonstration 
Plant, Preferred Alternative Selected, Schuylkill County, PA, Wait 
Period Ends: 12/03/2007, Contact: Janice L. Bell 1-866-576-8240.
EIS No. 20070457, Final EIS, UAF, MA, Final Recommendations and 
Associated Actions for the 104th Fighter Wing Massachusetts Air 
National Guard, Base Realignment and Closure, Implementation, 
Westfield-Barnes Airport, Westfield, MA, Wait Period Ends: 12/03/2007, 
Contact: Robert Dogan 301-836-8859.
EIS No. 20070458, Final EIS, FHW, CT, CT 82/85/11 Corridor 
Transportation Improvements, Selected Preferred Alternative, is a 
Modification of Alternative 4(E), Funding and COE Section 404 Permit, 
In the Towns of Salem, Montville, East Lyme and Waterford, CT, Wait 
Period Ends: 12/03/2007, Contact: Bradley D. Keazer 860-659-6703 Ext. 
3009.
EIS No. 20070459, Final EIS, FRC, SC, Santee Cooper Hydroelectric 
Project

[[Page 62230]]

(FERC. No. 199), Relicensing for Existing 130-megawatt (MW), Santee and 
Cooper Rivers, Berkeley, Calhoun, Clarendon, Orangeburg and Sumter 
Counties, SC, Wait Period Ends: 12/03/2007, Contact: Monte Terhaar 202-
502-6035.
EIS No. 20070460, Final EIS, FRC, WI, Guardian Expansion and Extension 
Project, Construction and Operation Natural Gas Pipeline Facilities, 
Jefferson, Dodge, Fond du Lac, Calument, Brown, Walworth, Outagamie 
Counties, WI, Wait Period Ends: 12/03/2007, Contact: Andy Black 1-866-
208-3372.
EIS No. 20070461, Final EIS, IBR, 00, Colorado River Interim Guidelines 
for Lower Basin Shortages and Coordinated Operations for Lake Powell 
and Lake Mead, Implementation, Colorado River, CO and CA, Wait Period 
Ends: 12/03/2007, Contact: Nan Yoder 702-595-9851.
EIS No. 20070462, Final EIS, MMS, 00, Eastern Planning Area Outer 
Continental Shelf (OCS) Oil and Gas Lease Sale 224, Gulf of Mexico 
Offshore Marine Environment and Coastal Parshes/Counties of LA, MS, AL, 
and North Western Florida, Wait Period Ends: 12/03/2007, Contact: Dr. 
Sally Valdes 703-787-1707.
EIS No. 20070463, Draft EIS, CGD/MARAD, FL, Calypso Liquefied Natural 
Gas (LNG) Deepwater Port License Application, Proposes to Own, 
Construct, and Operate a Deepwater Port, Outer Continental Shelf (OCS) 
in the OCS NG 17-06 (Bahamas) Lease Area, 8 to 10 miles off the East 
Coast of Florida to the Northeast of Port Everglades, FL, Comment 
Period Ends: 12/17/2007, Contact: Mary Kate Jager 202-372-1454.

 Amended Notices

EIS No. 20070385, Draft EIS, FHW, 00, Peace Bridge Expansion Project, 
Capacity Improvements to the Peace Bridge, Plazas and Connecting 
Roadways, U.S. Coast Guard Bridge Permit, U.S. Army COE Section 10 and 
404 Permits. City of Buffalo, Erie County, NY and Town of Fort Erie, 
Ontario, Canada, Comment Period Ends: 11/13/2007, Contact: Amy Jackson-
Grove 518-431-4131.

    Revision of Fr Notice Published 09/14/2007: Extending Comment 
Period from 10/29/2007 to 11/13/2007.

    Dated: October 30, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-21590 Filed 11-1-07; 8:45 am]

BILLING CODE 6560-50-P