[Federal Register: September 12, 2003 (Volume 68, Number 177)]
[Notices]               
[Page 53727-53728]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12se03-43]                         

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
North Hartland. LLC., et al.; Electric Rate and Corporate Filings

September 3, 2003.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. North Hartland, LLC

[Docket No. EL03-215-000]

    Take notice that on August 22, 2003 North Hartland, LLC (North 
Hartland) filed an amended complaint alleging that Central Vermont 
Public Service Corporation has violated its obligations under The 
Public Utility Regulatory Policy Act of 1978 (PURPA) and seeking 
Commission enforcement of PURPA.
    Comment Date: September 18, 2003.

2. Allegheny Power

[Docket No. ER03-309-005]

    Take notice that on August 28, 2003, Allegheny Energy Service 
Corporation, on behalf of Monongahela Power Company, The Potomac Edison 
Company and West Penn Power Company, doing business as Allegheny Power 
(Allegheny Power), tendered for filing with the Federal Energy 
Regulatory Commission a compliance filing in response to the 
Commission's July 29, 2003 Order in PJM Interconnection, L.L.C. et al., 
104 FERC ] 61,154. Allegheny Power respectfully requests that the 
Commission accept the revised Interconnection and Operating Agreement 
to become effective December 20, 2002.
    Allegheny Power states that a copy of this filing has been served 
on all parties identified on the official service list, Public 
Utilities Commission of Ohio, the Pennsylvania Public Utility 
Commission, the Maryland Public Service Commission, the Virginia State 
Corporation Commission and the West Virginia Public Service Commission.
    Comment Date: September 18, 2003.

3. Moraine Wind LLC

[Docket No. ER03-951-002]

    Take notice that on August 28, 2003, Moraine Wind LLC (Moraine 
Wind) filed substitute sheets to its Market-Based Rate Schedule (the 
Schedule) filed with the Federal Energy Regulatory Commission 
(Commission) on June 12, 2003. The amendments are made in accordance 
with the directive in the Commission's Order dated July 17, 2003, which 
required a change to the wording of the Schedule to conform to

[[Page 53728]]

Commission precedent and practice regarding affiliate transactions (see 
101 FERC ] 61,331).
    Comment Date: September 18, 2003.

4. St. Paul Cogeneration, LLC

[Docket No. ER03-1212-001]

    Take notice that on August 28, 2003, St. Paul Cogeneration, LLC 
(St. Paul) tendered for filing an errata to correct the pagination of 
their Code of Conduct in their Application for market-based rate 
authority filed on August 14, 2003 in Docket No. ER03-1212-000.
    Comment Date: September 18, 2003.

5. Liberty Electric Power, LLC

[Docket No. ER03-1226-000]

    Take notice that on August 19, 2003, Liberty Power, LLC (Liberty) 
filed a Notice of Cancellation of Service Agreement No. 1 under FERC 
Electric Tariff No. 1, which is a Tolling Agreement between Liberty and 
PG&E Energy Trading `` Power, L.P.
    Comment Date: September 15, 2003.

6. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER03-1260-000]

    Take notice that on August 27, 2003, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) pursuant to section 
205 of the Federal Power Act and Section 35.13 of the Commission's 
regulations, 18 CFR 35.13 (2002), submitted for filing a second revised 
Interconnection and Operating Agreement among GM Transmission, LLC, the 
Midwest ISO and Northern States Power Company d/b/a Xcel Energy.
    Midwest ISO states that a copy of this filing was served on the GM 
Transmission, LLC and Northern States Power Company d/b/a Xcel 
Energy.Comment Date: September 17, 2003.

7. Tampa Electric Company

[Docket No. ER03-1261-000]

    Take notice that on August 28, 2003, Tampa Electric Company (Tampa 
Electric) tendered for filing revised rate schedule sheets showing 
amendment of an exhibit to the contract for interchange service between 
Tampa Electric and Florida Power Corporation (FPC). Tampa Electric 
states that the amendment reflects a sale by Tampa Electric to FPC of a 
segment of transmission line that interconnects their respective 
systems. Tampa Electric proposes that the revised rate schedule sheets 
be made effective on August 14, 2003.
    Tampa Electric states that copies of the filing have been served on 
FPC and the Florida Public Service Commission.
    Comment Date: September 18, 2003.

8. Metropolitan Edison Company

[Docket No. ER03-1262-000]

    Take notice that on August 28, 2003, Metropolitan Edison Company 
(Met-Ed), on behalf of itself and PPL Electric Utilities Corporation 
(PPL Electric), submitted for filing a revised Interconnection 
Agreement between Met-Ed and PPL Electric (Agreement). Met-Ed states 
that the Agreement has been revised by the addition of a ``First 
Supplemental Agreement'' and the ``Second Supplemental Agreement'' and 
has been redesignated as First Revised Service Agreement No. 941 under 
the PJM Interconnection, LLC (PJM) open access transmission tariff.
    Met-Ed states that copies of this filing have been served on PPL 
Electric, PJM and regulators in the state of Pennsylvania.
    Comment Date: September 18, 2003.

9. PPL Electric Utilities Corporation

[Docket No. ER03-1263-000]

    On August 28, 2003, PPL Electric Utilities Corporation (PPL 
Electric) and Northampton Generating Company, L.P. (Northampton) filed 
with the Federal Energy Regulatory Commission (Commission) an amendment 
to PPL Electric's Rate Schedule FERC No. 112, which is a Transmission 
Service Agreement between PPL Electric and Northampton.
    PPL Electric states that a copy of this filing has been provided to 
Northampton.
    Comment Date: September 18, 2003.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov , using the ``FERRIS'' link. Enter the docket 
number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
[FR Doc. 03-23253 Filed 9-11-03; 8:45 am]

BILLING CODE 6717-01-P