[Federal Register: July 11, 2003 (Volume 68, Number 133)]
[Notices]               
[Page 41338-41339]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11jy03-50]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6641-8]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/. 
Weekly receipt of Environmental Impact Statements Filed June 30, 2003 
Through July 3, 2003 Pursuant to 40 CFR 1506.9.

EIS No. 030304, Draft EIS, AFS, AL, Forest Health and Restoration 
Project, Proposal to Determine the Desired Future Conditions of all 
Existing Loblolly Pine Stands, National Forests in Alabama, Bankhead 
National Forest, Winston, Lawrence and Franklin Counties, AL, Comment 
Period Ends: August 25, 2003, Contact: John W. Creed (205) 489-5111.
EIS No. 030305, Draft EIS, AFS, ID, Twin Creek Timber Sale Project, 
Proposal to Cut and Remove Lodgepole Pine Sawtimber, Road Construction/
Reconstruction, Montpelier Ranger District, Caribou National Forest, US 
Corps of Engineers Permit, Bear Lake County, ID, Comment Period Ends: 
August 25, 2003, Contact: Eric Mattson (208) 847-0375.
EIS No. 030306, Draft EIS, USA, Programmatic EIS--Army Transformation 
of the 172nd Infantry Brigade (Separate) to a Stryker Brigade Combat 
Team (SBCT), Forts Wainwright and Richardson, AK, Comment Period Ends: 
September 9, 2003, Contact: Kevin Gardner (907) 384-3003.
EIS No. 030307, Final Supplement, FHW, VA, U.S. Route 29 Bypass 
Improvement, between Route 250 Bypass in Charlottesville and the South 
Rivanna River in Albemarle,

[[Page 41339]]

Updated Information, To Consider the Effects of the Selected 
Alternative on the South Fork Rivanna River Reservoir and its 
Watershed, U.S. COE Section 404 Permit, Albemarle County, VA, Wait 
Period Ends: August 11, 2003, Contact: Edward S. Sundra (804) 775-3338.
EIS No. 030308, Final EIS, FHW, PA, NJ, Pennsylvania Turnpike/
Interstate 95 Interchange Project, Pennsylvania Turnpike (I-276) and I-
95 in Buck County, PA Connection with Proposed Interstate Improvements 
Extending east into Burlington County, NJ, Wait Period Ends: August 15, 
2003, Contact: James A. Cheatham (717) 221-3461.
EIS No. 030309, Draft Supplement, FAA, CA, Los Angeles International 
Airport Proposed Master Plan Improvements, New Alternative, Enhanced 
Safety and Security Plan, Los Angeles County, CA, Comment Period Ends: 
August 25, 2003, Contact: David Kessler (310) 725-3615.
EIS No. 030310, Draft EIS, FHW, TX, TX-45 Highway Southeast Study, from 
Interstate Highway (IH) 35 south at Farm-to-Market (FM)1327 to TX-130/
US 183, Proposal to Enhance the Local, Regional, and National 
Transportation Systems, Right-of-Way Permit, Travis County, TX, Comment 
Period Ends: August 25, 2003, Contact: Patrick Bauer (512) 536-5950.
EIS No. 030311, Final Supplement, AFS, MT, Threemile Stewardship 
Project, Additional Information concerning the Potential Effects on the 
Goshawk Habitat, Ashland Ranger District, Custer National Forest, 
Powder and Rosebud Counties, MT, Wait Period Ends: August 11, 2003, 
Contact: Elizabeth McFarland (406) 784-2344.
EIS No. 030312, Draft EIS, IBW, TX, Lower Rio Grande Flood Control 
Project, Addresses the Impacts of Alternative Vegetation Maintenance 
Practices, Located in the United States portions of the Rio Grande, 
Cameron, Hidalgo and Willacy Counties, TX, Comment Period Ends: August 
29, 2003, Contact: Douglas Echlin (915) 832-4741.
EIS No. 030313, Draft EIS, NPS, NY, NJ, Ellis Island and Statue of 
Liberty National Monument Development Concept Plan, Long-Term 
Rehabilitation and Reuse for Historic Buildings, Implementation, New 
York Harbor, NY and NJ, Comment Period Ends: September 12, 2003, 
Contact: Gwen Wilder (202) 208-3891. This document is available on the 
Internet at: http://www.nps.gov/elis.
EIS No. 030314, Draft EIS, NPS, WI, Apostle Islands National Lakeshore 
Wilderness Study, Wilderness Designation or Nondesignation, Ashland and 
Bayfield Counties, WI, Comment Period Ends: October 9, 2003, Contact: 
Robert Krumenaker (715) 779-3397. This document is available on the 
Internet at: http://www.nps.gov/apis/wstudy.htm.
EIS No. 030315, Final EIS, COE, CO, Rueter-Hess Reservoir Project, 
Construction and Operation, Proposed Water Supply Reservoir and Off-
Stream Dam, U.S. COE Section 404 Permit, Endangered Species Act 
(Section &) and Right-of-Way Use Permit, Located on Newlin Gulch along 
Cherry Creek, Town of Parker, Douglas County, CO, Wait Period Ends: 
August 11, 2003, Contact: Rodney J. Schwartz (402) 221-4143.
EIS No. 030316, Final EIS, DOD, CA, AS, AK, HI, WA, Ground-Based 
Midcourse Defense (GMD) Extended Test Range (ETR) Project, Proposal to 
Construct and Operate, Due: August 11, 2003, Contact: Julia Hudson-
Elliott (256) 955-4822. This document is available on the Internet at: 
http://www.acq.osd.mil/bmdo/bmdolink/html/bmdolink.html.

Amended Notices

EIS No. 030301, Final EIS, UAF, CA, Los Angeles Air Force Base Land 
Conveyance, Construction and Development Project, Transfer Portions of 
Private Development in Exchange for Construction of New Seismically 
Stable Facilities, Cities of El Sequndo and Hawthorne, Los Angeles 
County, CA, Wait Period Ends: August 04, 2003, Contact: Jason Taylor 
(310) 363-0142. Revision of FR Notice Published on 7/3/2003:CEQ Comment 
Period Ending 8/18/2003 has been Corrected to CEQ Wait Period Ending 8/
4/2003.

    Dated: July 8, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-17621 Filed 7-10-03; 8:45 am]

BILLING CODE 6560-50-P