[Federal Register: March 17, 2003 (Volume 68, Number 51)]
[Notices]               
[Page 12695-12696]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr17mr03-64]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Application Accepted for Filing and Soliciting 
Comments, Motions To Intervene, Protests, Recommendations, and Terms 
and Conditions

March 10, 2003.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit Exemption.
    b. Project No.: 12437-000.
    c. Date filed: January 27, 2003.
    d. Applicant: Twin Falls Canal Company.
    e. Name of Project: Low Line Midway Hydroelectric Project.
    f. Location: The project would be located on the existing Low Line 
Canal in Twin Falls County, Idaho. The Low Line Canal conveys water 
diverted from the Snake River at Milner Dam. The project would not 
occupy federal or tribal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. John J. Straubhar, P.O. Box 5071, Twin 
Falls, ID 83303-5071, (208) 736-8225.
    i. FERC Contact: James Hunter, (202) 502-6086.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time--see the following paragraphs about 
filing responsive documents.
    k. Deadline for filing comments, protests, and motions to 
intervene: April 11, 2003.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    l. Description of Project: The proposed project would consist of: 
(1) a gated intake structure at the end of a realigned section of Twin 
Falls Canal, water surface elevation 4019 feet mean sea level (msl), 
(2) two 12-foot-diameter, 200 to 300-foot-long penstocks, (3) a 
powerhouse containing two generating units with a total installed 
capacity of 2,300 kilowatts, and (4) a tailrace with a water surface 
elevation of 3993.6 feet msl constructed by excavating 1,300 linear 
feet of the canal floor to elevation 3,986 feet. The average annual 
generation would be 8 gigawatt hours.
    m. This filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
http://www.ferc.gov using the ``FERRIS'' link. Enter the docket number 

http://www.ferc.gov using the ``FERRIS'' link. Enter the docket number 

excluding the last three digits in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy may 

also be obtained by calling the Applicant.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the particular application, a 
competing development application, or a notice of intent to file such 
an application. Submission of a timely notice of intent allows an 
interested person to file the competing development application no 
later than 120 days after the specified deadline date for the 
particular application. Applications for preliminary permits will not 
be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    p. Protests or Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. Filing and Service of Responsive Documents--The application is 
ready for environmental analysis at this time, and the Commission is 
requesting comments, reply comments, recommendations, terms and 
conditions, and prescriptions.
    r. The Commission directs, pursuant to section 4.34(b) of the 
Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
1991) that all comments, recommendations, terms and conditions and 
prescriptions concerning the application be filed with the Commission 
within 30 days from the issuance date of this notice. All reply 
comments must be filed with the Commission within 45 days from the date 
of this notice.
    s. All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
an original and eight copies to: The Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An 
additional copy must be sent to Director, Division of Hydropower 
Administration and Compliance, Office of Energy Projects, Federal 
Energy Regulatory Commission, at the above address. A copy of any 
protest or motion

[[Page 12696]]

to intervene must be served upon each representative of the applicant 
specified in the particular application. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link. The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
[FR Doc. 03-6008 Filed 3-14-03; 8:45 am]

BILLING CODE 6717-01-P