    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Minor License.
    b. Project No.: 2602-005.
    c. Date filed: July 22, 2003.
    d. Applicant: Duke Power.
    e. Name of Project: Dillsboro Hydroelectric Project.
    f. Location: The Dillsboro Project is located on the Tuckasegee 
River in Jackson County, North Carolina. The project does not affect 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Jeffrey G. Lineberger; Manager, Hydro 
Licensing. Duke Power. 526 South Church Street, PO Box 1006, Charlotte, 
NC 28201-1006.
    i. FERC Contacts: Lee Emery at (202) 502-8379 or lee.emery@ferc.gov; and Carolyn Holsopple at (202) 502-6407 or carolyn.holsopple@ferc.gov.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene and protests may be filed electronically via 
the Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (http://www.ferc.gov) under the ``e-
Filing'' link.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The existing Dillsboro Hydroelectric Project operates in a run-
of-river mode, within a 6-inch tolerance band. Project operation is 
dependent on available flow in the Tuckasegee River, which is dependent 
on Duke Power's East Fork (FERC No. 2698) and West Fork (FERC No. 2686) 
Tuckasegee River projects. The Dillsboro Project consists of the 
following features: (1) A 310-foot-long, 12-foot-high concrete masonry 
dam, consisting of, from left to right facing downstream, (a) a 
concrete, non-overflow section, (b) a 14-foot-long uncontrolled 
spillway section, (c) a 20-foot-long spillway section with two 6-

[[Page 65273]]

foot-wide spill gates, (d) a 197-foot-long uncontrolled spillway 
section, (e) an 80-foot-long intake section, and (f) a concrete, non-
overflow section; (2) a 0.8-mile-long, 15-acre impoundment at elevation 
1972.00 msl; (3) two intake bays, each consisting of a reinforced 
concrete flume and grated trashracks having a clear bar spacing varying 
from 2.0 to 3.38 inches; (4) a powerhouse having a reinforced concrete 
substructure and a wood/steel superstructure, containing two turbine/
generating units, having a total installed capacity of 225 kW; (5) a 
switchyard, with three single-phased transformers; and (6) appurtenant 
facilities.
    Duke Power estimates that the average annual generation is 912, 330 
Kwh. Duke Power uses the Dillsboro Project facilities to generate 
electricity for use by retail customers living in the Duke Power-
Nantahala Area.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    You may also register online at  http://www.ferc.gov/docs-filing/esubscription.asp
 to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.

Magalie R. Salas,
Secretary.
[FR Doc. E3-00306 Filed 11-18-03; 8:45 am]