[Federal Register: September 8, 2003 (Volume 68, Number 173)]
[Notices]               
[Page 52919-52920]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr08se03-61]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2181-014]

 
Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protest

August 29, 2003.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License for a Major Water Power 
Project.
    b. Project No.: P-2181-014.
    c. Date Filed: February 10, 2003.
    d. Applicant: Northern States Power Company (d/b/a Xcel Energy).
    e. Name of Project: Menomonie Hydroelectric Project.
    f. Location: On the Red Cedar River, City of Menomonie, Dunn 
County,

[[Page 52920]]

Wisconsin. This project would not use Federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. William Zawacki, Director, Hydro Plants, 
or Ms. Kristina Bourget, Esq., Northern States Power Company (d/b/a 
Xcel Energy), 1414 West Hamilton Avenue, PO Box 8, Eau Claire, 
Wisconsin 54702-0008, 715-836-1136 or 715-839-1305, respectively.
    i. FERC Contact: John Ramer, (202) 502-8969.
    j. Deadline for filing motions to intervene and protest: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    Motions to intervene and protests and requests may be filed 
electronically via the Internet in lieu of paper. The Commission 
strongly encourages electronic filings. See CFR 385.200 (a)(1)(iii) and 
the instructions on the Commission's Web site (http://www.ferc.gov) 
under the ``e-Filing'' link.
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The Menomonie Project consists of the following existing 
facilities: (1) A 624-foot-long by about 40-foot-high dam, topped with 
five, 40-foot-wide by 19-foot-high and one, 9-foot-high by 25-foot-
wide, steel Tainter gates, with a total dam discharge capacity of 
62,000 cubic feet per second (cfs); (2) a 1,405-acre reservoir (Lake 
Menomin) with a gross storage capacity of about 15,000-acre feet; (3) a 
72-foot-long by about 50-foot-wide by 40-foot-high powerhouse 
containing two vertical-shaft Kaplan turbine-generators with a combined 
total maximum hydraulic capacity of 2,700 cfs and a total installed 
generating capacity of about 5.4 megawatts (MW), producing a total of 
23,358,292 kilowatt-hours (kWh) annually; (4) a 4,160-volt bus with 
three bundles of underground cables, approximately 50-feet-long, 
leading to a substation containing a 69-kilovolt (kV) bus from which 
power flows to serve the applicant's interconnected electrical system, 
or to a 12.5-kV local distribution system; and (5) appurtenant 
facilities. The dam and existing project facilities are owned by 
Northern States Power Company (d/b/a Xcel Energy).
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h. above.
    You may also register online at http://www.ferc.gov/esubscribenow.htm
 to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.

Magalie R. Salas,
Secretary.
[FR Doc. 03-22722 Filed 9-5-03; 8:45 am]