[Federal Register: October 28, 2003 (Volume 68, Number 208)]
[Notices]               
[Page 61405-61407]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28oc03-49]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC03-127-001, et al.]

 
IDACORP Energy L.P., et al.; Electric Rate and Corporate Filings

September 15, 2003.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. IDACORP Energy L.P. and Sempra Energy Trading Corp

[Docket No. EC03-127-001]

    Take notice that on September 8, 2003, IDACORP Energy L.P. and 
Sempra Energy Trading Corp., pursuant to Section 203 of the Federal 
Power Act submitted a supplement to Exhibit G of the Application filed 
on August 20, 2003 in Docket No. EC03-127-000.
    Comment Date: September 22, 2003.

2. Caledonia Generating, LLC; PurEnergy Caledonia LLC

[Docket No. EC03-134-000]

    Take notice that on September 4, 2003, Caledonia Generating, LLC 
(Caledonia) filed an application under Section 203 of the Federal Power 
Act requesting Commission authorization for the transfer of all 
jurisdictional facilities related to Caledonia's 813 MW gas-fired 
electric generating station located near the Town of Caledonia, 
Mississippi, to PurEnergy Caledonia LLC (PurEnergy Caledonia), in 
connection with the transfer of Caledonia's generating facility to a 
passive non-operating owner/lessor. Caledonia has requested privileged 
treatment of the contents of Exhibit I to the Section 203 application. 
In addition, PurEnergy Caledonia filed a notice of succession with 
respect to Caledonia's market-based rate tariff.
    Comment Date: September 25, 2003.

3. Ameren Services Company

[Docket No. ER02-2237-002]

    Take notice that on September 8, 2003, Ameren Services Company 
(Ameren) pursuant to the Commission's Letter Order dated August 8, 
2003, submitted a compliance filing correcting the designation for the 
Network Operating Agreement which should read ``Ameren Operating 
Companies FERC Electric Tariff Second Revised Volume No. 1, Second 
Substitute Service Agreement No. 512, Docket Nos. ER02-2237-000 and 
001.''
    Comment Date: September 29, 2003.

4. Southwest Power Pool, Inc.

[Docket No. ER03-978-001]

    Take notice that on September 8, 2003, Southwest Power Pool, Inc. 
(SPP) submitted a revised Interconnection and Operating Agreement 
(Revised IA) between SPP, Blue Canyon Windpower, LLC (Blue Canyon) and 
Western Farmers Electric Cooperative (WFEC) in compliance with the 
Commission's July 23, 2003 Order in Docket No. ER03-978-000. SPP states 
that copies of this filing were served on Blue Canyon, WFEC and on all 
parties on the official service list in this docket.
    Comment Date: September 30, 2003.

5. Pacific Gas and Electric Company

[Docket No. ER03-1091-001]

    Take notice that on September 8, 2003, Pacific Gas and Electric 
Company (PG&E) tendered for filing a Notice of Termination of the 
Generator Special Facilities Agreement with Duke Energy Morro Bay LLC. 
PG&E has also requested certain waivers.
    PG&E states that copies of this filing have been served upon 
Wellhead Panoche, Wellhead Gates, CalPeak Vaca Dixon, High Winds, 
Hanover, Duke Morro Bay, the California Independent System Operator 
Corporation and the CPUC.
    Comment Date: September 29, 2003.

6. Pacific Gas and Electric Company

[Docket No. ER03-1115-000]

    Take notice that on September 8, 2003, Pacific Gas and Electric 
Company (PG&E) withdrew its Request for Deferral of Consideration of 
its July 25, 2003, filing in Docket No. ER03-1115-000 of a revised 
Generator Special Facilities and Generator Interconnection Agreements 
between PG&E and Elk Hills Power, LLC (Elk Hills) (collectively, 
Parties).
    PG&E states that copies of this filing have been served upon the 
California Public Utilities Commission and all parties designated on 
the official service list in this proceeding.
    Comment Date: September 29, 2003.

7. Central Hudson Gas & Electric Corporation

[Docket Nos. ER03-1297-000, ER03-1298-000,ER03-1299-000, and ER03-1300-
000]

    Take notice that on September 9, 2003, Central Hudson Gas & 
Electric Corporation (Central Hudson) submitted Notices of Cancellation 
for its Rate Schedule FERC Nos. 57, 58, 59 and 60. Central Hudson 
states that the notices did not reflect the correct pagination pursuant 
to the requirements of the Commission's Order No. 614, and therefore 
Central Hudson is submitting substituted notices for those originally 
filed on September 3, 2003.
    Comment Date: September 30, 2003.

8. Palama, LLC

[Docket No. ER03-1306-000]

    Take notice that on September 8, 2003, Palama, LLC (Palama) 
petitioned the Commission for acceptance of Palama Rate Schedule FERC 
No. 1; the granting of certain blanket approvals, including the 
authority to sell electricity at market-based rates; and the waiver of 
certain Commission regulations.
    Palama states that it intends to engage in wholesale electric power 
and energy

[[Page 61406]]

purchases and sales as a marketer. Palama notes that it is not in the 
business of generating or transmitting electric power.
    Comment Date: September 30, 2003.

9. PacifiCorp

[Docket No. ER03-1308-000]

    Take notice that on September 8, 2003, PacifiCorp, tendered for 
filing in accordance with 18 CFR 35 of the Commission's Rules and 
Regulations a Notice of Cancellation of PacifiCorp's Rate Schedule No. 
424 with Black Hills Corporation effective March 31, 2002.
    PacificCorp states that copies of this filing were supplied to 
Black Hills Corporation and the Public Utility Commission of Oregon.
    Comment Date: September 29, 2003.

10. Arizona Public Service Company

[Docket No. ER03-1309-000]

    Take notice that on September 8, 2003, Arizona Public Service 
Company (APS) tendered for filing a Notice of Cancellation of the 
Edison-Arizona Interruptible Transmission Service Agreement, between 
APS and Southern California Edison Company (SCE), in accordance with 
Commission's regulations 18 CFR 35.11. APS is requesting an effective 
date of November 1, 2003.
    Comment Date: September 29, 2003.

11. Arizona Public Service Company

[Docket No. ER03-1310-000]

    Take notice that on September 8, 2003, Arizona Public Service 
Company (APS) tendered for filing a Notice of Cancellation of the 
Wholesale Power Agreement between APS and Southern California Edison 
Company (SCE), in accordance with Commission regulations 18 CFR 35.11. 
APS is requesting an effective date of December 31, 2003.
    Comment Date: September 29, 2003.

12. Chesapeake Transmission, LLC

[Docket No. ER03-1311-000]

    Take notice that on September 8, 2003, Chesapeake Transmission, LLC 
(CTL) submitted for filing, pursuant to Section 205 of the Federal 
Power Act, a petition requesting that the Commission: (1) Grant CTL 
blanket authority to make sales of transmission rights at negotiated 
rates; and (2) grant certain waivers, in connection with its proposed 
Chesapeake Transmission Line project.
    Comment Date: September 29, 2003.

13. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER03-1312-000]

    Take notice that on September 8, 2003, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) submitted for filing 
Schedule 20--Station Power of its Open Access Transmission Tariff, FERC 
Electric Tariff, Second Revised Volume No. 1, in order to provide 
clarification of the Station Power process and procedures as it applied 
to Generators.
    The Midwest ISO has requested waiver of the notice provision of 
Section 205 of the Federal Power Act in order to accommodate an 
effective date of October 8, 2003.
    The Midwest ISO has also requested waiver of the service 
requirements set forth in 18 CFR 385.2010. The Midwest ISO states it 
has electronically served a copy of this filing, with attachments, upon 
all Midwest ISO Members, Member representatives of Transmission Owners 
and Non-Transmission Owners, the Midwest ISO Advisory Committee 
participants, as well as all state commissions within the region. In 
addition, the filing has been electronically posted on the Midwest 
ISO's Web site at http://www.midwestiso.org under the heading ``Filings to 
FERC'' for other interested parties in this matter. The Midwest ISO 
states it will provide hard copies to any interested parties upon 
request.
    Comment Date: September 29, 2003.

14. Geothermal Properties, Inc.

[Docket No. ER03-1314-000]

    Take notice that on September 9, 2003, Geothermal Properties, Inc. 
tendered for filing a Notice of Cancellation of its market-based rate 
authority under FERC Electric Tariff, Original Volume No. 1, effective 
date February 15, 2001 in Docket No. ER01-869-000. Geothermal 
Properties, Inc. states that the cancellation should take effect 
September 30, 2003, and that it has not entered into any power sales or 
power purchase agreements or transactions pursuant to the tariff.
    Comment Date: September 30, 2003.

15. MS Retail Development Corp.

[Docket No. ER03-1315-000]

    Take notice that on September 9, 2003, MS Retail Development Corp. 
(MS Retail) petitioned the Commission for acceptance of MS Retail's 
Rate Schedule FERC No. 1; the granting of certain blanket approvals, 
including the authority to sell electricity at market-based rates; and 
the waiver of certain Commission regulations.
    MS Retail states that it is a corporation formed under the laws of 
Delaware and its principal place of business is New York, New York. MS 
Retail notes that in transactions where it sells electric power it 
proposes to make such sales on rates, terms, and conditions to be 
mutually agreed to with the purchasing party.
    Comment Date: September 30, 2003.

16. Sunrise Power Company

[Docket No. ER03-1317-000]

    Take notice that on September 8, 2003, Sunrise Power Company, LLC, 
filed a Joint Interconnection Facilities Agreement between Sunrise and 
La Paloma Generating Company, LLC pursuant to Section 205 of the 
Federal Power Act.
    Comment Date: September 29, 2003.

17. e prime, inc.

[Docket No. ER03-1319-000]

    Take notice that on September 9, 2003, e prime, inc. filed a notice 
with the Commission seeking cancellation of its market-based rate 
authority effective September 1, 2003 pursuant to Section 35.15(c) of 
the Commission regulations.
    Comment Date: September 30, 2003.

 18. Commonwealth Edison Company

[Docket No. ER03-1320-000]

    Take notice that on September 9, 2003, Commonwealth Edison Company 
(ComEd) submitted for filing an interconnection agreement by and 
between ComEd and Mendota Hills, LLC (Mendota Hills), designated as 
Service Agreement No. 728 under ComEd's open access transmission 
service tariff, ComEd FERC Electric Tariff, Second Revised Volume No. 
5, to be effective on November 9, 2003.
    Comment Date: September 30, 2003.

19. Southwestern Public Service Company

[Docket No. ER03-1321-000]

    Take notice that on September 8, 2003, Xcel Energy Services Inc., 
on behalf of Southwestern Public Service Company (SPS), filed revisions 
to SPS's Rate Schedule FERC No. 118 and notice of cancellation of 
certain obsolete supplements to SPS's Rate Schedule FERC No. 118.
    Comment Date: September 29, 2003.

20. Bethlehem Steel Corporation

[Docket No. ER03-1322-000]

    Take notice that on September 8, 2003, Bethlehem Steel Corporation 
(Bethlehem) pursuant to Commission's regulations 18 CFR 35.15 and 
131.53, submitted for filing a Notice of Cancellation of FERC Electric 
Tariff No. 1 and Rate Schedule FERC No. 2.

[[Page 61407]]

    Comment Date: September 29, 2003.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket 
number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
[FR Doc. E3-00126 Filed 10-27-03; 8:45 am]

BILLING CODE 6717-01-P