New information on the Peconic River project will be available on the Long-Term Response Action web page, currently under development. Information on this site is retained to archive the decision process.

Adobe Acrobat Reader will be needed to view some PDF files listed on this page. Obtain the Reader, or troubleshoot common problems.

During initial environmental studies, the Brookhaven National Laboratory (BNL) site was subdivided geographically into seven Operable Units (OU). Shortly thereafter, two of them were combined to form OU II/VII. The main Operable Units dealing with soil contamination are OU I and OU II/VII. Operable Unit IV also addresses some soil contamination.

Operable Unit I was originally defined as a 950-acre area in the southeastern part of the BNL site. Later, to facilitate the cleanup process, similar types of contamination from different Operable Units were grouped together. Soils contaminated with radioactive materials from areas originally included in OU II/VII, IV and VI are being cleaned up under OU I because they have similar contaminants.

Operable Unit II/VII is located in the central, developed portion of the BNL site. It consists of four "areas of concern" - the Waste Concentration Facility, aerial radiation survey locations, the former Low Mass Criticality Facility, and storage yards for the
Alternating Gradient Synchrotron.

Operable Unit IV is also located in the central, developed portion of the BNL site. Its area of concern is the Central Steam Facility.  OU IV also addressed the Reclamation Facility and Sump Outfall Area, which has since been transferred to OU I.  The five-year review of the Operable Unit IV treatment system is now available. 

Project Information

 

Top of Page

Last Modified: February 1, 2008