Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
FlyingTbanner
About Us
Services
 
Office of Pre-Letting provides the following:
  • Prepares PS&E packages for printing and advertisement
  • Reviews PS&E packages for readiness to proceed to bid
  • Provides training and advice on getting design projects to bid
  • Maintains the Bid Schedule and 13-month lock in dates
  • Tracks and distributes approved Design Exceptions, Anticipated Item letters, Public Interest  Findings, and PD-02 exception letters
     

Organizational Chart
 
Office of Pre-Letting is part of the "Office of Project Letting (OPL) Unit" which is a under the Traffic-Roadway Section, Technical Services Branch.
 
The following link is provided to help you better understand the organization structure of the Office of Pre-Letting within OPL.
Point Icon  Organizational Chart

 
Page updated: February 11, 2008

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.