interactive image:  Photo of the American River Water Education Center - Before and After; click for larger photo
interactive image:  Photo of the American River Water Education Center - Before and After; click for larger photo
The American River Water Education Center - Before and After
interactive photo:  ARWEC opens its schoolhouse and center doors to the public
Interactive image:  Plans for a Grand Opening in May of 2008 are underway; click for larger photo
Interactive image:  The site has been host to many visitors, schools, interest groups; click for larger photo

The American River Water Education Center opens its school house and center doors to the general public.

Plans for a Grand Opening in May of 2008 are underway.
The site has already been host to many visitors, schools, special interest groups and volunteer camaraderie.
 

October 23, 2007

interactive image:  photo - staff is ready to greet the general public to the new site of the ARWEC in October; click for larger photo
interactive image:  photo - the garden is equipped with identification labels for water conservation; click for larger photo
interactive image:  photo - staff teaches importance of Folsom Dam at Beals Point; click for larger photo
Staff is ready to greet the general public and student field trip programs to the new site of the American River Water Education Center in October.
The garden is equipped with identification labels for water conservation and California native plants.
Staff teaches the importance of Folsom Dam while doing a program at Beals Point.
 

September 27, 2007

Interactive image:  ARWEC volunteers assemble for their first glimpse of the newly relocated center. Training for revised programs for visitors has begun. Click for larger image.
Interactive image:  A short scenic walk along the bike trail from the school house to the amphitheater is a nice addition to our grounds. Click for larger image.
Interactive image: Truck loads of plants are waiting for their new home in the ground around the American River Water Education Center. Click for larger image.

ARWEC volunteers assemble for their first glimpse of the newly relocated center.  Training for revised programs for visitors has begun. 

A short scenic walk along the bike trail from the school house to the amphitheater is a nice addition to our grounds.

Truck loads of plants are waiting for their new home in the ground around the American River Water Education Center.  

 

September 9, 2007

interactive image:  photo - construction crew completes the entry patio
interactive image:  photo - sidewalks and irrigation near completion
interactive image:  photo - along bike trail, will  be new picnic area
The construction crew completes the entry patio to the American River Water Education Center in August.
Sidewalks and irrigation areas are near completion while the new garden plans come together.
Just along the bike trail is the future site of the picnic area. 
 

August 15, 2007

interactive image:  The concrete patio has been poured; cllick for larger photo
interactive image:  Boss takes on a dirty job of yanking out the toilet exhibit; click for larger photo
interactive image:  photo of steps and concrete have been poured in new amphitheater; click for larger photo
The concrete patio around the Water Education Center has been poured. If you look closely, you can see a Sun stamped into the concrete. Staff and volunteers look forward to teaching students how important the sun is in the water cycle.
Our very own boss takes on a “dirty job” by yanking out the old toilet exhibit. We look forward to having a fresh new center and exhibits to share with students and the general public.
Steps and concrete have been poured in our new amphitheater with boulders set in the floor. The surrounding trees and shade structure will make for an inviting learning area.
 

July 25, 2007

interactive image:  New cover at the center entrance is now complete; click for larger photo
interactive image:  grading is still going on with the intention of concrete pouring; click for larger photo
interactive image:  plants that were dug up by volunteers in the spring are doing well; click for larger photo
The new cover at the center entrance is now complete.   Perfect to shelter our visiting students and general public in October.
Grading is still going on with the intention of concrete pouring next week. 
The plants that were dug up by volunteers in the Spring are doing well in their temporary home.  Soon a garden party will be scheduled to replant them in our new site.
 

July 10, 2007

interactive image:  The American River Water Education center gets a “face lift” with construction of a new deck; click for larger photo
interactive image:  Amphitheater sits below the right wing of the Folsom Dam along the bike trail; click for larger photo
static image:  Photo of left and right abutments of the new bridge progress quickly in July
The American River Water Education center gets a “face lift” with construction of a new deck.
The amphitheater sits below the right wing of the Folsom Dam along the bike trail. Posts are in place waiting for completion of its shade structure.
Left and right side abutments of the new bridge progress quickly in July.
 

June 26, 2007

interactive image:  ARWEC building waiting to be repositioned; click for larger photo
interactive image:  Bike trail will experience new pavement; click for larger photo
interactive image:  Bike trail will experience new pavement; click for larger photo
The American River Water Education building waits to be repositioned on its new site.
Those using the bike trail will experience new pavement which winds around the new ARWEC site.
By the middle of June, you can now see the crane at the left abutment and the retaining wall on the right abutment for the new bridge. 
static image:  photo of the crane at the left abutment and the retaining wall on the right abutment

By the middle of June, you can now see the crane at the left abutment and the retaining wall on the right abutment for the new bridge. 

 

June 14, 2007

static image:  watch us move, going
interactive image:  watch us move, going; click for larger photo
interactive image:  watch us move, gone; click for larger photo
Going
Going
Gone
 

June 6, 2007

interactive image:  new bridge continues to grow; click for larger photo
interactive image:  ARWEC staff sits in new office space; click for larger photo
interactive image:  the ARWEC classroom moves; click for larger photo
The new bridge continues to grow with lots of activity at the left abutment.
ARWEC staff sits in new office space. We might need a little furniture?
The ARWEC classroom moves on June 4th with a tight squeeze.
interactive image:  photo of the visitor center rolling out on Folsom Dam Road; click for larger photo
The visitor center rolls out on Folsom Dam Road to its new location on June 6th. In case anyone thought we were open for visitors, the sign to the right reads “American River Water Education Center Closed During Move”.
 

May 29, 2007

ARWEC continues to move! On Saturday, May 19th the staff of the American River Water Education Center held a fabulous garden work party with a combined 26 volunteers from the Capital Christian Center, the California Conservation Corps and ARWEC volunteers. Plants were dug up and stored for transplant to the new site.
interactive image:  ARWEC Volunteer Gary digs in; click for larger photo
interactive image:  photo - Volunteers get instructions for plant removal; click for larger photo
interactive image:  photo - Volunteers prepare for a feast; click for larger photo
ARWEC Volunteer Gary digs in
Volunteers get instructions for plant removal
Volunteers prepare a feast for all
interactive image:  photo - plants dug up from the ARWEC site; click for larger photo
Plants dug up from the ARWEC site sit in a green house waiting for their new home
 

May 10, 2007

static image:  photograph, due to construction, the ARWEC is moving

As a result of the construction of the new bridge, the American River Water Education
is moving across the street.

interactive image:  photograph, watch us move; click for larger photo
interactive image:  photograph of concrete foundations; click for larger photo

Excavating the site for ARWEC had begun in March.

Our new site is being graded and prepared for the move of our current ARWEC buildings. Those on the bike trail near Folsom Lake can watch it happen.

At the moment we are closed to the general public and finishing up with school tours by May 18, 2007. We look forward to “ business as usual” in October and welcoming school groups back. The tour office will continue to make reservations for the upcoming school year during the transition.

Concrete foundations have been poured for the placement of the existing ARWEC buildings, May 2007

November 26, 2007