Initial Test Program and ITAAC-Design Certification (NUREG-0800, Chapter 14)

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Section Title Rev. Date Updated
14.2 Initial Plant Test Program - Design Certification and New License Applicants Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 02/1979
Rev. 0 11/1975
14.2.1 Generic Guidelines for Extended Power Uprate Testing Programs Initial Issuance 08/2006
Draft Rev. 0 12/2002
14.3 Standard Plant Designs, Initial Test Program - Final Design Approval (FDA) [DELETED] Rev. 1 07/1981
Rev. 0 02/1979
14.3 Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 09/1996
14.3.1 [Reserved] [Reserved] 03/2007
Draft Rev. 0 06/1996
14.3.2 Structural and Systems Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.3 Piping Systems and Components - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.4 Reactor Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.5 Instrumentation and Controls - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.6 Electrical Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.7 Plant Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.8 Radiation Protection - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.9 Human Factors Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.10 Emergency Planning - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.11 Containment Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.12 Physical Security Hardware - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007