skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NUREG-0800
Cover, Contents, Introduction
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Chapter 9
Chapter 10
Chapter 11
Chapter 12
Chapter 13
Chapter 14
Chapter 15
Chapter 16
Chapter 17
Chapter 18
Chapter 19
Appendixes

Instrumentation and Controls (NUREG-0800,
Chapter 7)

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Section Title Rev. Date Updated
7 Instrumentation and Controls - Overview of Review Process Rev. 5 03/2007
Rev. 4 06/1997
Appendix 7.0-A Review Process for Digital Instrumentation and Control Systems Rev. 5 03/2007
Rev. 4 06/1997
7.1 Instrumentation and Controls -- Introduction Rev. 5 03/2007
Rev. 4 06/1997
Rev. 3 02/1984
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.1-T Table 7-1 Regulatory Requirements, Acceptance Criteria, and Guidelines for Instrumentation and Control Systems Important to Safety Second Rev. 5 03/2007
Rev. 3 02/1984
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
Appendix 7.1-A Acceptance Criteria and Guidelines for Instrumentation and Controls Systems Important to Safety Second Rev. 5 03/2007
Rev. 4 06/1997
Rev. 1 02/1984
Rev. 0 07/1981
Appendix 7.1-B Guidance for Evaluation of Conformance to IEEE Std 279 Rev. 5 03/2007
Rev. 4 06/1997
Rev. 0 07/1981
Appendix 7.1-C Guidance for Evaluation of Conformance to IEEE Std 603 Rev. 5 03/2007
Rev. 4 06/1997
Appendix 7.1-D Guidance for Evaluation of the Application of IEEE Std 7-4.3.2 Initial Issuance 03/2007
7.2 Reactor Trip System Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.3 Engineered Safety Features Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.4 Safe Shutdown Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.5 Information Systems Important to Safety Rev. 5 03/2007
Rev. 4 06/1997
Rev. 3 02/1984
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.6 Interlock Systems Important to Safety Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.7 Control Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 3 02/1984
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
7.8 Diverse Instrumentation and Control Systems Rev. 5 03/2007
Rev. 4 06/1997
7.9 Data Communication Systems Rev. 5 03/2007
Rev. 4 06/1997
Appendix 7-A General Agenda, Station Site Visits
(formerly Appendix 7-B)
Rev. 5 03/2007
Rev. 4 06/1997
Rev. 1 07/1981
Rev. 0 11/1975
Appendix 7-B Acronyms, Abbreviations, and Glossary
(formerly Appendix 7-C)
Rev. 5 03/2007
Rev. 4 06/1997
  Branch Technical Positions (BTPs)    
  Branch Technical Positions (BTPs) - Index

"Former Appendix 7-A,
Branch Technical Positions (BTPs) has been separated into individual sections."

Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-1 Guidance on Isolation of Low-Pressure Systems from the High-Pressure Reactor Coolant System Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-2 Guidance on Requirements of Motor-Operated Valves in the Emergency Core Cooling System Accumulator Lines Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-3 Guidance on Protection System Trip Point Changes for Operation with Reactor Coolant Pumps Out of Service Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-4 Guidance on Design Criteria for Auxiliary Feedwater Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-5 Guidance on Spurious Withdrawals of Single Control Rods in Pressurized Water Reactors Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-6 Guidance on Design of Instrumentation and Controls Provided to Accomplish Changeover from Injection to Recirculation Mode Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
  HICB-7, Not Used Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-8 Guidance for Application of Regulatory Guide 1.22 Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-9 Guidance on Requirements for Reactor Protection System Anticipatory Trips Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-10 Guidance on Application of Regulatory Guide 1.97 Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-11 Guidance on Application and Qualification of Isolation Devices Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-12 Guidance on Establishing and Maintaining Instrument Setpoints Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-13 Guidance on Cross-Calibration of Protection System Resistance Temperature Detectors Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-14 Guidance on Software Reviews for Digital Computer-Based Instrumentation and Control Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
  HICB-15, Not Used Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
  HICB-16, Guidance on the Level of Detail Required for Design Certification Applications Under 10 CFR Part 52 (Information included in Regulatory Guide 1.206, “Combined License Applications for Nuclear Power Plants”) *Withdrawn Rev. 4 02/2007
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-17 Guidance on Self-Test and Surveillance Test Provisions Rev 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-18 Guidance on the Use of Programmable Logic Controllers in Digital Computer-Based Instrumentation and Control Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-19 Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems Rev. 5 03/2007
Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
  HICB-20, Not Used Rev. 4 06/1997
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
BTP 7-21 Guidance on Digital Computer Real-Time Performance Rev. 5 03/2007
Rev. 4 06/1997


Privacy Policy | Site Disclaimer
Friday, April 18, 2008