Department of Health and Human Services with stylized eagle made up of silhouetted human faces C D C
Department of Health and Human Services
Centers for Disease Control and Prevention

National Institute for Occupational Safety and Health (NIOSH)
Search NIOSH NIOSH Home NIOSH Topics Site Index Databases and Information Resources NIOSH Products Contact Us

NIOSH Program Area:

Office of Compensation Analysis and Support (OCAS)

 

Pantex Plant
(Site Profile Number 031)

Location: Amarillo, Texas

Site Profile

  1. Introduction
    (Revised May 11, 2007)
    this document in PDF PDF 61 KB (11 pages)

    Revision Includes: Includes Attribution and Annotation section. Constitutes a total rewrite of the document. Incorporates formal internal review comments. This revision results in no change to the assigned dose and no PER is required.


  2. Site Description
    (Revised May 8, 2007)
    this document in PDF PDF 1.1 MB (21 pages)

    Revision Includes: Incorporates Attributions and Annotations, Purpose and Scope Sections. Constitutes a total rewrite of the document. Incorporates formal internal review comments. This revision results in no change to the assigned dose and no PER is required.

  3. Occupational Medical Dose
    (Revised February 1, 2007)
    this document in PDF PDF 99 KB (20 pages)

    Revision Includes: Approved Revision 02 for organ dose assignment based on site specific information. Added Section 3-5, Skin Dose Method Description and Section 3-8, Attributions and Annotations. Incorporates internal formal and NIOSH formal review comments. Constitutes a total rewrite of document. This revision results in an increase in assigned dose and a PER is required.

  4. Occupational Environmental Dose
    (Revised June 22, 2007)
    this document in PDF PDF 660 KB (43 pages)

    Revision Includes: Incorporates Attributions and Annotations. Constitutes a total rewrite of the document. Incorporates formal internal review comments. No changes were needed as a result of formal NIOSH review. This revision results in no change to the assigned dose and no PER is required.

  5. Occupational Internal Dose
    (Revised June 22, 2007)
    this document in PDF PDF 404 KB (72 pages)

    Revision Includes: Incorporates Attributions and Annotations and additional references. No sections were deleted. Minor editorial changes were made in Sections 5.2.1, 5.2.1.1, 5.2.1.1.4, 5.2.2.5, and 5.2.2.6.2. Constitutes a total rewrite of the document. Incorporates formal internal and NIOSH review comments. This revision results in no change to the assigned dose and no PER is required.

  6. Occupational External Dose
    (Revised June 22, 2007)
    this document in PDF PDF 597 KB (74 pages)

    Revision Includes: Incorporates Attributions and Annotations section. Constitutes a total rewrite of the document. Added references and made editorial changes. Modified Table 6-1 average total dose for 1958, 1977, 1983, and 1997. Modified Table 6-9 to add Radiography NDE. No further changes occurred as a result of formal internal review. Incorporates formal NIOSH review comments. This revision results in no change to the assigned dose and no PER is required. Training required: As determined by the Task Manager. Initiated

Top of Page

Technical Information Bulletins (TIBs)

At the current time, there are no TIBs for the Pantex Plant.

Top of Page

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)

NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.

  • PER 26: Pantex TBD Revision - ORAUT-TKBS-0013
    this document in PDF PDF 16 KB (2 pages)

    Document Number: OCAS-PER-026 Rev-00

    About this Document: New document to determine which previously completed claims require evaluation for the effect of revising the Pantex TBD.

    Approved: October 31, 2007

    Summary: There were 50 Pantex claims meeting the employment dates and target organ criteria above that were completed with a probability of causation below 50% prior to February 1, 2007. NIOSH will review the records of each claim to determine if the dose assigned in the revised TBD is higher than that assigned in the dose reconstruction. NIOSH will provide DOL with the list of 50 claims as well as a determination on each claim as to whether a new Dose Estimate is required. Documentation for each claim not requiring a new dose reconstruction will provide the basis for that determination.


Top of Page

Worker Outreach Activities

Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.

At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.

Below are the Worker Outreach Activities for the Pantex Plant:

  • Meeting with the Metal Trades Council
    June 3, 2004
    Final Minutes
    this document in PDF PDF 52 KB (11 pages)

Top of Page

Comments on Pantex Plant Documents

How to Submit Comments
Comments on Pantex Plant documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (031) on all comments.

Comments Received

Top of Page

Special Exposure Cohort Petition Information for the Pantex Plant

  • Petition Information

    Location: Amarillo, Texas

    Job Titles and/or Job Duties: Production workers, technicians, including radiography, guards, physical plant, maintenance, administrative and support staff, contractors, and Atomic Energy Commission staff

    Period of Employment: January 1, 1950 through December 31, 1991

  • Federal Register Notice Announcing that the Pantex Plant SEC Petition has met the Minimum Qualifications for Review and Evaluation
    December 17, 2007
    this document in PDF PDF 45 KB (1 page)

  • Copy of the Petition Received
    Pantex Plant Petition
    this document in PDF PDF 1.3 MB (33 pages)

  • SEC Petition Evaluation Report
    Pantex Plant Evaluation Report
    this document in PDF PDF 603 KB (67 pages)

  • Petition to be Discussed by the Advisory Board
    The petition will be discussed by the Advisory Board at its September 2-4, 2008, meeting.

  • Advisory Board Recommendation on SEC Petition
    The Advisory Board has not discussed the petition at this time.

  • HHS Letter to Congress Regarding the SEC Petition
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • Federal Register Notice: Designation of a Class of Employees for Addition to the Special Exposure Cohort
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • HHS Designation of Additional Members to the SEC
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • Effective Date for the SEC Class
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • Letter to DOL Regarding the Addition of a New Class of Employees to the SEC
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

  • Letter from DOL Regarding the Return of All Cases for the New SEC Class
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

Top of Page

Previous Versions of Pantex Plant Technical Documents

Site Profile: Introduction section

Revised July 27, 2006
this document in PDF PDF 118 KB (10 pages)

Revision Includes: Constitutes a total rewrite of document. Revised as a result of the biennial document review. Incorporates NIOSH formal review comments. This revision results in no change to the assigned dose.

Approved February 18, 2004
this document in PDF PDF 78 KB (7 pages)

Site Profile: Site Description section

Revised July 27, 2006
this document in PDF PDF 1.06 MB (18 pages)

Revision Includes: Constitutes a total rewrite of document. Revised as a result of the biennial document review. Incorporates NIOSH formal review comments. This revision results in no change to the assigned dose.

Approved March 30, 2004
this document in PDF PDF 1.07 MB (17 pages)

Site Profile: Occupational Medical Dose

Revised December 23, 2005
this document in PDF PDF 155 KB (19 pages)

Revision Includes: Document Publication Record contains no detailed description of revision details.


Approved August 24, 2004
this document in PDF PDF 177 KB (15 pages)

Site Profile: Occupational Environmental Dose
(Approved August 24, 2004)
this document in PDF PDF 690 KB (36 pages)

Site Profile: Occupational Internal
Page Change Revision February 8, 2007
this document in PDF PDF 360 KB (55 pages)

Page Change Revision Includes: Page change revision to change the date for the first DU-laden hydroshot from 1952 to 1959 on page 31. Updated the text in Section 5.2.2.6 on page 28 and updated Table 5-11 on page 32 and 5-19 on page 48. Added reference on page 49 for the telephone conversation that confirmed the actual date. Table 5-1 was moved from page 9 to page 10. Results in a decrease in the intake of DU and resultant dose for the years 1952 to 1959. Text was modified or added in Section 5 and References (pages 9-12, 28, 31-32, 48-49, and 53). No sections were deleted. Incorporates internal formal review comments and NIOSH formal review comments. This revision results in a reduction in assigned dose and no PER is required.

Approved July 27, 2006
this document in PDF PDF 390 KB (54 pages)
Site Profile: Occupational External Dose
(Approved July 27, 2006)
this document in PDF PDF 481 KB (60 pages)

Top of Page

Page last updated: August 20, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)

Find It !
On this page...
Site Profile
Technical Information Bulletins (TIBs)
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Worker Outreach Activities
Comments on Pantex Plant Documents
Special Exposure Cohort Petition Information for the Pantex Plant
Previous Versions of Pantex Plant Documents
Claimant Corner
Claim Information
Commonly Used Acronyms
FAQs
General Activities on AWE Cases
General Activities on DOE Cases
Help A-Z
List of Work Sites
Phone Interview Information
OCAS Print Materials
Status of Your Dose Reconstruction
OCAS Directory
About OCAS
The Act (EEOICPA)
Advisory Board
Conflict or Bias Policy and Disclosure Statements
Dose Reconstruction
Help A-Z
Latest Update to OCAS Web Site
Probability of Causation
(NIOSH-IREP)

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Public Meetings
Regulatory Record
(Public Docket)

Related Links
Special Exposure Cohort
Technical Documents Used in Dose Reconstruction
Timeline of Major OCAS Events
OCAS Main Page