[Federal Register: July 6, 1999 (Volume 64, Number 128)] [Rules and Regulations] [Page 36239-36240] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr06jy99-3] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD01-99-093] Drawbridge Operation Regulations: Harlem River, NY AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulations. ----------------------------------------------------------------------- SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations governing the operation of the Triborough (125th Street) Bridge, mile 1.3, across the Harlem River in New York City, New York. This deviation from the regulations authorizes the bridge owner to keep the bridge in the closed position from August 2, 1999, through August 31, 1999, and from September 7, 1999, through October 6, 1999. This action is necessary to facilitate the removal and replacement of the bridge counterweight lift cables. DATES: This deviation is effective from August 2, 1999, through August 31, 1999, and from September 7, 1999, through October 6, 1999. FOR FURTHER INFORMATION CONTACT: Joe Arca, Project Officer, First Coast Guard District, at (212) 668-7165. SUPPLEMENTARY INFORMATION: The Triborough (125th Street) Bridge, mile 1.3, across the Harlem River has vertical clearances of 54 feet at mean high water, and 59 feet at mean low water in the closed position. The current operating regulations listed at 33 CFR Sec. 117.789(d) require the bridge to open on signal from 10 a.m. to 5 p.m., if at least four hours notice is given. The bridge owner, the Triborough Bridge and Tunnel Authority (TBTA), requested a temporary deviation from the operating regulations for the Triborough (125th Street) Bridge in order to remove and replace the counterweight lift cables. During the process of this work the bridge can not be opened. Vessels that can pass under the bridge without an opening may do so at all times during the closed periods. This work is essential for public safety and the continued operation of the bridge. In accordance with 33 CFR Sec. 117.35(c), this work will be performed [[Page 36240]] with all due speed in order to return the bridge to normal operation as soon as possible. This deviation to the operating regulations authorizes the TBTA to keep the Triborough (125th Street) Bridge, mile 1.3, across the Harlem River in New York City, New York, in the closed position for repairs from August 2, 1999, through August 31, 1999, and from September 7, 1999, through October 6, 1999. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 21, 1999. Robert F. Duncan, Captain, U.S. Coast Guard, Acting Commander, First Coast Guard District. [FR Doc. 99-17054 Filed 7-2-99; 8:45 am] BILLING CODE 4910-15-M