[Federal Register: November 22, 1999 (Volume 64, Number 224)] [Notices] [Page 63804-63805] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr22no99-83] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP00-62-000] Trunkline LNG Company; Notice of Proposed Changes in FERC Gas Tariff November 16, 1999. Take notice that on November 10, 1999, Trunkline LNG Company (TLNG) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1-A, the revised tariff sheets listed on Appendix A attached to the filing, to be effective December 11, 1999. TLNG states that the purpose of this filing, made in accordance with the provisions of Section 154.204 of the Commission's Regulations, is to: (1) Add an overrun charge to Rate Schedule FTS [[Page 63805]] to provide for LNG quantities received in excess of shipper's Maximum Contract Storage Capacity; (2) establish a maximum allowable saturation pressure for LNG shipments in new Section 4.2(G) of the General Terms and Conditions; (3) clarify in Section 13.2(G) of the General Terms and Conditions that the quantity received from shipper's vessel is net of boil off returned to the vessel during unloading; (4) change the notice to shipper as a prerequisite to final balancing to 15 days prior to the termination of shipper's service agreement with a term of 90 days or less in Section 6.2(A) of the General Terms and Conditions; (5) modify Section 2.2 of Rate Schedules FTS and ITS, Section 3.1 of the General Terms and Conditions and Section 1 of the form of service agreement to provide for a maximum and minimum daily delivery obligation to allow TLNG and its shippers to determine a flexible daily send-out rate; and (6) correct a punctuation error in Section 19.3 of the General Terms and Conditions. TLNG states that copies of this filing are being served on all affected customers and applicable state regulatory agencies. Any person desiring to be heard or to protest said filing should file a motion to intervene or a protest with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Sections 385.214 or 385.211 of the Commission's Rules and Regulations. All such motions or protests must be filed in accordance with Section 154.210 of the Commission's Regulations. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection in the Public Reference Room. This filing may be viewed on the web at http:// www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). David P. Boergers, Secretary. [FR Doc. 99-30311 Filed 11-19-99; 8:45 am] BILLING CODE 6717-01-M