[Federal Register: May 13, 1999 (Volume 64, Number 92)] [Notices] [Page 25927] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr13my99-105] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-250 and 50-251] Florida Power and Light Company, Turkey Point Units 3 and 4); Exemption I Florida Power and Light Company (the licensee) is the holder of Facility Operating Licenses Nos. DPR-31 and DPR-41, which authorize operation of Turkey Point Units 3 and 4 (the facility), respectively, at a steady-state reactor power level not in excess of 2300 megawatts thermal. The facility is a pressurized-water reactor located at the licensee's site in Dade County, Florida. The licenses require among other things that the facility comply with all rules, regulations, and orders of the U.S. Nuclear Regulatory Commission (the Commission or NRC) now or hereafter in effect. II In exemptions dated March 27, 1984, and August 12, 1987, concerning the requirements of Section III.G, Appendix R to 10 CFR part 50, the staff approved the use of 1-hour-rated fire barriers in lieu of 3-hour barriers in certain outdoor areas at Turkey Point Units 3 and 4. In addition, the staff found that, for certain outdoor areas not protected by automatic fire detection and suppression systems, separation of cables and equipment and associated non-safety-related circuits of redundant trains by a horizontal distance of 20 feet free of intervening combustibles provided an acceptable level of fire safety. On the basis of the results of the industry's Thermo-Lag fire endurance testing program, the licensee concluded that the outdoor Thermo-Lag fire barrier designs cannot achieve a 1-hour fire-resistive rating but can achieve a 30-minute fire-resistive rating when exposed to a test fire that follows the American Society for Testing and Materials E-119 standard time-temperature curve. Because of these test results, the licensee in a letter dated June 15, 1994, requested an exemption to use 30-minute fire barriers for outdoor applications in lieu of the 1-hour fire barriers previously approved; however, the exemption request was withdrawn by letter dated June 28, 1996. In a letter dated December 12, 1996, the licensee requested an exemption from the requirements pertaining to the 3-hour fire barriers required by Section III.G.2.a, Appendix R to 10 CFR part 50, for the outdoor areas, excluding the turbine building area. The licensee requested that the NRC approve the use of 25-minute raceway fire barriers for these outdoor applications in lieu of the 1-hour fire barriers that were previously approved (refer to safety evaluations dated March 27, 1984, and August 12, 1987). By letter dated February 24, 1998, the NRC staff denied the licensee's request for exemption for fire zone 106R, the control building roof, based on the uncertainty of the roof's combustibility and fire classification. During a site visit, on September 14, 1998, the licensee informed the NRC staff that it had obtained additional information to support that the control building roofing composite was an equivalent Class A construction per American National Standard/ Underwriters Laboratories, Inc. No. 790, ``Tests for Fire Resistance of Roof Covering Materials, Seventh Edition.'' Subsequently, by letters dated November 2, 1998, and February 11, 1999, the licensee submitted additional information for staff review regarding the classification of the fire zone 106R roof construction. III The underlying purpose of Section III.G.2.a, Appendix R to 10 CFR Part 50, is to provide reasonable assurance that at least one means of achieving and maintaining safe shutdown conditions will remain available during and after any postulated fire in the plant. On the basis of the staff's supporting safety evaluation of the licensee's submittals, the staff concludes that the exemption from the requirements of Section III.G.2.a of Appendix R, for fire zone 106R as requested by the licensee, provides an adequate level of fire safety, and presents no undue risk to public health and safety. In addition, the staff concludes the underlying purpose of the rule is achieved. IV Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to public health and safety, and is consistent with the common defense and security. In addition, the Commission has determined that special circumstances are present in that application of the regulation in the particular circumstances here is not necessary to achieve the underlying purpose of the rule. Therefore, the Commission hereby grants Florida Power and Light Company an exemption from the requirements of Section III.G.2.a of Appendix R to 10 CFR part 50, as requested in its above-referenced submittals, for fire zone 106R. Pursuant to 10 CFR 51.32, the Commission has determined that granting this exemption for fire zone 106R will not have a significant effect on the quality of the human environment (64 FR 14276). This exemption is effective upon issuance. Dated at Rockville, Md., this 4th day of May 1999. For the Nuclear Regulatory Commission. John A. Zwolinski, Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation. [FR Doc. 99-12137 Filed 5-12-99; 8:45 am] BILLING CODE 7590-01-P